What are the procedures for applying for three phase electricity in rural areas?

Updated on Three rural 2024-03-21
5 answers
  1. Anonymous users2024-02-07

    1. Bring the resident's ID card and real estate certificate and other relevant documents to the business hall of the electricity station.

    2. For details, please consult the relevant personnel of the business hall.

    3. After the power supply company accepts the user's application for electricity, it will send personnel to conduct on-site investigation, and if the installation conditions are met, designate the installation location and notify the user to pay the fee. After the user pays all the fees to the power supply department, the staff of the power supply company will come to the door to install the meter and connect the electricity, and the reply cycle of the power supply plan and the meter installation cycle shall not exceed the promised time limit.

  2. Anonymous users2024-02-06

    The application for three-phase electricity in rural areas is in the name of an individual and in the name of an enterprise, and the procedures and materials that need to be prepared for the two are also different.

    1. Procedures for applying for three-phase electricity in rural areas:

    Low-voltage power (three-phase electricity) users in rural areas need to make the following preparations for new electricity installation:

    1. To handle it in the name of an individual, it is necessary to prepare a letter of introduction issued by the village, a personal ID card, a house photo, a list of equipment, and a business license if it is of a business nature;

    2. If it is handled in the name of the enterprise, it is necessary to prepare a letter of introduction stamped with the official seal of the enterprise, the ID card of the legal representative, the business license of the enterprise, the house license, the layout of the enterprise factory plan, and the list of electrical equipment;

    After preparing the above procedures, go to the local power supply bureau and office.

    2. Safety knowledge of low-voltage three-phase electricity:

    1. The voltage of the three-phase wire of China's low-voltage power supply line is 380V, and the phase voltage to the ground (neutral line, also known as neutral line) is 220V;

    2. When using phase voltage for power supply, if there is a lack of zero line, the grounding wire of the equipment can be used as the neutral line, but the grounding must be good (in general, in addition to the three-phase four-wire power supply, the equipment is equipped with a grounding wire);

    3. Regardless of N line or PE line, repeated grounding should be used on the user side to improve reliability, however, repeated grounding is only repeated grounding, it can only be connected together at the grounding point or near the grounding position, but it never indicates that it can be connected together at any position, especially indoors;

    4. The low-voltage power supply for residents is a 3-phase 5-wire system, and the 5-wire is named: A: A phase, live wire (potential to the ground 380V).

  3. Anonymous users2024-02-05

    2. To handle it in the name of the enterprise, it is necessary to prepare a letter of introduction, personal ID card, real estate certificate, business license and other documents stamped by the enterprise.

    Legal basis: "Notice of the State Economic and Trade Commission on Accelerating the Reform of the Rural Electric Power System and Strengthening the Management of Rural Electric Power" Article 3, Paragraph 2 The second item of the second item is to reform the current management mode of township (town) power management stations, and change township (town) power management stations into power supply stations or business offices belonging to county-level power supply enterprises, and their personnel, finance, and materials are included in the unified management of county-level power supply enterprises. Rural collective power assets at and below the township level may be managed by county-level power supply enterprises in the form of voluntary surrender and free allocation, and they shall bear the responsibility for maintenance and management。

  4. Anonymous users2024-02-04

    The application process for rural three-phase electricity is as follows:

    1. The parties should prepare the housing land use certificate, the business license of the enterprise or individual, the tax registration certificate, and the legal person ID card;

    2. Get the owner's ID card or a copy of the ID card;

    3. The tenant and the landlord can apply to the power supply department together.

    What are the preconditions for the installation of three-phase electricity in rural areas.

    The preconditions for the installation of three-phase electricity in rural areas are as follows:

    1. Hold a house land use certificate;

    2. Business license of the enterprise;

    3. Tax registration certificate;

    4. Legal person ID card.

    Legal basis: Article 33 of the Electric Power Law of the People's Republic of China.

    Power supply enterprises shall charge electricity charges to users in accordance with the records of electricity prices and electricity metering devices approved by the state。

    When the power supply enterprise's electricity inspection personnel and meter reading and charging personnel enter the user to conduct electricity safety inspection or meter reading and charging, they shall present the relevant certificates。

    The user shall pay the electricity fee on time in accordance with the electricity price approved by the state and the record of the electricity metering device; Convenience shall be provided to the power supply enterprises' electricity inspection personnel and meter reading and charging personnel in performing their duties in accordance with the law。

    Article 34.

    Power supply enterprises and users shall abide by the relevant provisions of the state and take effective measures to do a good job in the safe, economical and planned use of electricity。

  5. Anonymous users2024-02-03

    1. To handle training in the name of an individual, you need to bring the ID card, real estate certificate and other relevant documents of the residents on the bridge, as well as the letter of introduction issued by the village and other documents to handle it; 2. To handle it in the name of the enterprise, it is necessary to prepare a letter of introduction, personal ID card, real estate certificate, business license and other documents stamped by the enterprise.

Related questions
17 answers2024-03-21

Question 1 A: Single-phase tables will not go too many words. >>>More

13 answers2024-03-21

A power supply consisting of three alternating currents with the same frequency, equal amplitude, and 120° phase difference from each other. >>>More

11 answers2024-03-21

If you do not have a title deed, you will need to provide other proof of ownership, such as a real estate certificate, a purchase contract, or a collective land use certificate. In addition, it is also necessary to provide proof of the identity of the head of the household and proof of property ownership of the electricity address. If you entrust someone else to do the work on your behalf, you also need to provide the identity certificate and power of attorney of the agent.

8 answers2024-03-21

When the three-phase asynchronous motor is connected to the three-phase AC power supply, the three-phase stator winding flows through the three-phase magnetodynamic potential generated by the three-phase symmetrical current and generates a rotating magnetic field, which rotates clockwise along the stator and the inner circular space of the rotor at a synchronous speed. This rotating magnetic field has a relative cutting motion with the rotor conductor, which, according to the principle of electromagnetic induction, generates an induced electromotive force and generates an induced current. According to the law of electromagnetic force, under the action of induced electromotive force, an induced current will be generated in the rotor conductor that is basically the same as the direction of the induced electromotive force. >>>More

9 answers2024-03-21

As long as the ground wire of the socket is connected, the ground wire connector of the main switch can be connected. This is the ground wire that has been connected. The longer of the three feet is grounded, which can be called the grounding pin, and the other two shorter feet are used to connect household appliances to the circuit, which can be called conductive feet. >>>More