The demolition applies to the corresponding sub-items in the repair quota, but the demolition of the color steel house does not have the sub-item of the overall demolition calculated by square meters, and you can only apply the sub-items of roof demolition and metal structure demolition in the repair quota respectively. If there is a concrete foundation, it is also necessary to apply the corresponding dismantling sub-item separately.
-
Look at where it is, the installation and disassembly are about 50 yuan a square. The prefabricated house produced by Huanyun mobile house is suitable for offices, various temporary dormitories, mobile storage rooms, sentry boxes, kiosks, temporary hospitals, schools, warehouses, factories, markets, shopping mall expansion, etc.; The main skeleton of the composite board house adopts a light steel structure, with a design load of 150 kg per square meter, the outer wall is made of 50mm color steel sandwich panel, and the partition wall panel can bear a side force of 120 kg per square meter, and the deformation is less than L 250The roof is made of heat-insulated color steel tiles, with a span of less than 6 meters, and the roof can bear 80 kg of load per square meter, and the seismic strength can reach level 7, which can basically withstand 70 kg of wind per square meter, which is equivalent to a 12-level typhoon. This product has the characteristics of short construction time, clean construction site, heat insulation, good sound insulation effect, high space utilization rate, low cost, no decoration, and all internal compartments are dominated by customers.
-
Summary. According to the "Quota for Construction Costs" (GB50500-2010), the quota for the demolition of prefabricated houses is RMB per square meter. The method and practice steps of dismantling prefabricated houses are as follows:
1.First of all, before the demolition of the prefabricated house, the structure of the prefabricated house should be inspected, the methods and steps of demolition should be determined, and the order of demolition should be determined to avoid damage. 2.
Secondly, in the work of dismantling the prefabricated house, it should be dismantled layer by layer in the order of demolition, from top to bottom, from outside to inside, and the dismantled panels and other materials should be properly preserved for reuse. 3.Finally, after the demolition of the prefabricated house, it should be checked whether the demolition work is completed, and the demolished prefabricated house should be cleaned up so as not to affect the environmental sanitation of the construction site.
In short, the work of dismantling the prefabricated house requires careful and meticulous work to ensure the safe and smooth completion of the demolition work.
According to the "Quota for Construction Costs" (GB50500-2010), the quota for the demolition of prefabricated houses is RMB per square meter. The method and practice steps of dismantling the prefabricated house are as follows: 1
First of all, before the demolition of the prefabricated house, the structure of the prefabricated house should be inspected, and the methods and steps of demolition should be determined, as well as the order of demolition, so as to avoid damage. 2.Secondly, in the work of dismantling the prefabricated house, it should be dismantled layer by layer in the order of demolition, from top to bottom, from outside to inside, and the dismantled panels and other materials should be properly preserved for reuse.
3.Finally, after the demolition of the prefabricated house, it should be checked whether the demolition work is completed, and the demolished prefabricated house should be cleaned up so as not to affect the environmental sanitation of the construction site. In short, the work of dismantling the prefabricated house requires careful and meticulous work to ensure the safe and smooth completion of the demolition work.
Excuse me, but please go into more detail?
The quota for dismantling prefabricated houses is mainly determined in accordance with the structure, materials, specifications, quantity and other factors of prefabricated houses. Generally speaking, the calculation method of the quota for the demolition of the prefabricated house is as follows: firstly, the engineering quantity of the prefabricated house is determined according to the structure, jujube and careful materials, specifications, quantity and other factors of the prefabricated house; According to the amount of work to dismantle the prefabricated house, the quota for the demolition of the prefabricated house is determined.
The calculation of the quota for the demolition of the prefabricated house needs to take into account the structure, materials, specifications, quantity and other factors of the prefabricated house, as well as the amount of work to dismantle the prefabricated house, as well as the quota for the demolition of the prefabricated house. The quota for the demolition of the prefabricated house is generally determined according to the structure, materials, specifications, quantity and other factors of the prefabricated house, the head of the stool and the amount of work to dismantle the prefabricated house. The calculation of the quota for the demolition of the prefabricated house needs to take into account the structure, materials, specifications, quantity and other factors of the prefabricated house, as well as the amount of work to dismantle the prefabricated house, as well as the quota for the demolition of the prefabricated house.
In addition, it is also necessary to take into account factors such as the technological process, construction conditions, and construction environment of the demolition of the prefabricated house, as well as the safety measures for the demolition of the prefabricated house, so as to ensure that the calculation of the quota for the demolition of the prefabricated house is accurate and reasonable.
-
Summary. Hello dear, when you find the concrete slab for the demolition of the bedroom and need to re-set the quota, you first need to clarify the specific amount of construction work, such as the demolition area, depth, thickness, etc. Then, according to the local construction project quota, combined with the amount of work, the cost of materials, labor and mechanical equipment for the removal of concrete slabs can be calculated.
Here are the specific steps:1Calculate the demolition area, depth, thickness, etc. according to the engineering quantity.
2.According to the local construction work quota, the cost of materials, labor and mechanical equipment for the removal of concrete slabs is calculated. For example, labor costs include demolition costs, clean-up fees, ancillary costs, and more.
3.According to the actual situation of the project, some special costs may need to be added, such as garbage removal freight, safety protection fees, etc. 4.
Split the calculated costs reasonably, for example, by itemizing labor costs, machinery costs, material costs, etc., and then add them up to calculate the total costs.
Hello dear, when you find the concrete slab for the demolition of the bedroom and need to re-set the quota, you first need to clarify the specific amount of construction work, such as the demolition area, depth, thickness, etc. Then, according to the amount of the local construction project, combined with the amount of work, the cost of materials, labor and mechanical equipment for the removal of concrete slabs can be calculated. Here are the steps:
1.Calculate the demolition area, depth, thickness, etc. according to the engineering quantity. 2.
According to the local construction work quota, the cost of materials, labor and mechanical equipment for the removal of concrete slabs is calculated. For example, the cost of human completion includes demolition costs, clean-up costs, auxiliary fees, etc. 3.
According to the actual situation of the project, it may be necessary to increase some special slip fees, such as garbage removal freight, safety protection fees, etc. 4.Split the calculated costs reasonably, for example, by itemizing labor costs, machinery costs, material costs, etc., and then add them up to calculate the total costs.
It should be noted that in order to ensure safety and quality, professional tools and equipment must be used when carrying out concrete slab demolition works, and the operation must be carried out strictly in accordance with the specifications and dispersion procedures. In addition, during the construction process, it is necessary to pay attention to on-site environmental protection and safety issues.
1. The size and depth of the mobile room can be customized according to the needs of the unit, but they must meet the requirements of the module. >>>More