    First of all, the design unit surveys the site and conducts a residents' meeting to discuss the preliminary design plan; Secondly, the district additional ladder office for the first instance, and the first person will hand over the relevant information to the community for preliminary examination; Finally, pre-approval publicity, cost decomposition and layout objections, selection of the general lead unit, signing of the ladder increase agreement and declaration of planning permits.

    and receive the card.

    What conditions need to be met for the installation of elevators.

    According to the guidance: the installation of elevators in old buildings should meet the following five conditions at the same time:

    1.Within the scope of cities and towns, residential buildings shall be constructed for use in accordance with the law;

    2.non-unitary title;

    3.Not included in the scope and plan of housing expropriation;

    4.The building height is 4 storeys or more;

    5.The building structure of the house meets the safety code.

    The old building is equipped with elevators, and those functions must be matched.

    First: there must be handrails in the car, at least one handrail, to facilitate the travel of special groups.

    Second: secondly, there should be a sub-operation box, which is convenient for special people in wheelchairs.

    Third: the size of the elevator door is 80 cm, which is convenient for special people in wheelchairs to travel.

    Fourth: In order not to affect the light of low-rise users, it is recommended that it is best to use the full sightseeing elevator.

    Sixth: Power outage emergency devices are also essential.

    Seventh: For conditional communities, it is recommended that the elevator be designed according to the stretcher ladder, after all, everyone cannot guarantee that there will be no accidents.

    Eighth: the rear wall of the car is recommended to be made of mirrored stainless steel.

  2. Anonymous users2024-02-05

    If the elevator is installed in the old building, the building process must first obtain the consent of the residents of the entire floor, and after agreeing, then apply for the declaration fee, and then come to purchase and purchase, and then finally install.

  3. Anonymous users2024-02-04

    If the elevator is installed, all residents need to sign and confirm before the project is established.

  4. Anonymous users2024-02-03

    How to install elevators in old buildings, you can consult them, and the relevant departments will know.

  5. Anonymous users2024-02-02

    First of all, we must consult the owner, and the first step in replacing the elevator in the community is to formulate a self-financing plan for the renovation and consult the owner, and the owner must agree and sign before proceeding to the next step.

    After the owner agrees, select the elevator brand, consider key factors such as quality, brand, and post-maintenance, and choose the elevator brand with obvious comprehensive advantages in all aspects through on-site visits. When 85% of the owners agree, you can start to draw up a capital contribution plan, such as a plan for different capital contribution methods according to head and area. After the funds are in place, you can contact the elevator brand to install it, and the construction personnel will enter the site and replace the elevator in accordance with the construction procedures.

    Terms and regulations: Shibei District issued the "Administrative Measures for Major Repairs of Elevator Renovation and Renovation of Public Residential Hidden Dangers (Trial)" (hereinafter referred to as the "Measures"), which was officially implemented on March 10, 2018. The "Measures" have made clear provisions on the renovation and overhaul procedures for the renovation and overhaul of old elevators in residential quarters, the subsidy standards for renovation and overhaul, and the supervision and management.

    Formulated a unified hidden danger elevator renewal, transformation or major repair subsidy standards, clear whether all old elevators need to be renovated and overhauled to the safety assessment conclusion issued by the safety assessment agency shall prevail, the overall renewal of each corresponding cost of 30% of the subsidy, up to 150,000 yuan.

    The above content reference: Qingdao people**-Shibei issued a major repair management method for the renewal and transformation of hidden elevators in public housing, and the maximum subsidy for the renewal of hidden elevators is 150,000.

  6. Anonymous users2024-02-01

    The approval procedures for the installation of elevators in old buildings are very complicated, involving multiple departments such as planning, land, quality supervision, and fire protection.

    Guiding Opinions on Public Solicitation of Elevators for Existing Residential Buildings in the City" clarifies the materials that need to be provided:

    1. Signature of two-thirds of the households.

    2. The real estate certificate of each household.

    3. Drawings of the design institute.

    4. Power of attorney.

    5. Business license of elevator company.

    6. Installation and maintenance qualifications.

    7. Qualification of design unit.

    The Opinions also simplify the approval procedures, so that the original required sunshine analysis charts, noise tests, etc. are no longer required.

  7. Anonymous users2024-01-31

    The procedures required for installing elevators in old buildings are as follows:

    1.Entrust the safety appraisal of building structures. The construction unit entrusts the safety inspection and appraisal of the original structure of the residential building, and the construction engineering quality inspection agency and the housing safety appraisal unit issue the testing and appraisal report or the engineering design unit that undertakes the elevator addition design issues the seismic appraisal air training report.

    If the test appraisal report or seismic appraisal report determines that there is no structural safety hazard, the elevator can be applied for.

    2.Handle the planning review of construction projects. If an elevator is added to an existing building, if the elevator shaft is reserved during the completion and acceptance of the original Li Chai housing building, there is no need to go through the planning and approval of the construction project.

    If the elevator shaft is not reserved, the qualified architectural design unit shall first report the design plan for the addition of the elevator to the planning department for review and issue a review opinion, and if it meets the planning and standards, it shall enter the construction drawing design document procedure and conduct the construction drawing design review in accordance with the regulations. According to laws and regulations, such as fire protection, which requires approval, shall be handled in accordance with relevant regulations.

  8. Anonymous users2024-01-30

    The procedures for installing elevators in old buildings are:

    1. Signature of two-thirds of the households. First of all, the installation of elevators in old buildings must be signed by more than two-thirds of the owners.

    2. The real estate certificate of each household is roughly grasped. Residents are then asked to provide proof of ownership.

    3. Drawings of the design institute. Then it is to take the owner's certificate to agree to the installation, and let the elevator company design the drawings.

    4. Power of attorney. Submit a power of attorney for the installation of an elevator.

    5. The business license, installation and maintenance qualification, and design unit qualification of the elevator company. The elevator company must provide the relevant business license certificates. The stool is finished.

  9. Anonymous users2024-01-29

    We know that there was no elevator design in an old building in the past, but sometimes some high-rise buildings want to install elevators in this building due to the rise of age, but they must meet the conditions of the rock world before they can apply. Let's introduce to you what are the ways to install elevators in old buildings.

    The way elevators are installed in old buildings.

    Scheme 1: Outdoor frontal plug-in installation method.

    At the side position of the balcony on the outside of the building, the platform is connected to the car area of the elevator, and the entrance door is opened at the elevator position near the side of the balcony, so that the destination floor is reached.

    Scheme 2: Outdoor adjacent balcony installation method.

    It is installed in the middle of the two households on the balcony side, and the entrance door is opened on the balcony or the corresponding elevator car to reach the destination floor directly.

    Scheme 3: Indoor rest platform installation method.

    The corner of the staircase is opened up and down and retransformed into a spiral staircase connecting the upper and lower stairs, and the elevator car is set in the indoor rest platform space to reach the destination floor directly.

    The process of installing elevators in old buildings:

    1. First of all, it is necessary to convene a meeting of all owners, set up an additional elevator management team with the building as a unit, recommend the owner's representatives, and be responsible for the establishment of elevator fundraising, construction, installation, maintenance, and management of related affairs.

    2. Prepare relevant information to apply to the municipal urban and rural planning department, and receive the "Construction Project Planning Permit" after publicizing and approving it according to the regulations.

    3. Go to the fire department to handle the fire protection design review, fire protection acceptance or filing of construction projects.

    4. Relevant licenses or consents shall be obtained for those involving power supply, water supply, telecommunications, cable television and other departments.

    5. Entrust the design unit with the corresponding qualification level to carry out the design, review the rough rock limb drawing agency, and the construction unit to carry out the construction.

    6. Go to the construction administrative department for quality and safety supervision registration and construction permits.

    7. The owner shall conduct on-site supervision by himself or by entrusting a supervision unit with corresponding qualifications.

    8. The construction and installation of elevators for existing residential buildings shall comply with the requirements of the "Regulations on the Safety Supervision of Special Equipment" and the "Regulations on the Safety Supervision of Special Equipment in Guangdong Province", and shall be tested by institutions with corresponding qualifications, and the procedures for completion acceptance shall be handled in accordance with the law.

    9. After the real estate owner jointly invests in the addition of elevators, it shall apply to the real estate registration agency for recording in the real estate registration book in accordance with the relevant provisions of the Housing Registration Measures (Order No. 168 of the Ministry of Construction).

    Summary: What are the relevant contents of the way to install elevators in old buildings, which is introduced to this, there are several installation methods, and you can choose according to your actual needs to determine which way is more suitable.

  10. Anonymous users2024-01-28

    The installation of elevators in old residential areas is a complex process involving multiple links and departments, and the specific process may vary depending on factors such as region, policy, and property management. The following is the general process of installing elevators in old residential areas:

    1.Demand Survey and Solicitation of Opinions:

    The property company or owners' committee investigates residents' needs for additional elevators and solicits residents' opinions.

    Determine the location, scheme, design, etc. of the additional elevator.

    2.Preparation of a feasibility study report:

    Entrust a professional organization to study the feasibility of installing elevators, including technical, economic, social and other aspects of the assessment.

    Preparation of a feasibility study report to clarify the necessity and feasibility of installing elevators.

    3.Ask for comments and votes:

    The feasibility study report will be publicized to the residents and their opinions will be solicited.

    If the issue of co-ownership is involved, residents may need to vote and reach a certain percentage of consent before proceeding.

    4.**Approval:

    Submit the application to the relevant ** department and obtain the approval and approval of the relevant department.

    Determine the specific standards, specifications and technical requirements for the installation of elevators, as well as safety supervision.

    5.Bidding and selection of construction units:

    Carry out the bidding letter defense and select the construction unit responsible for the installation of elevators.

    6.Construction:

    The construction unit carries out the elevator installation project, including construction, installation of elevator equipment, power connection, etc.

    7.Safety Acceptance & Operation:

    After the completion of construction, the elevator safety acceptance is carried out to ensure compliance with relevant specifications and standards.

    After the elevator passed the acceptance, it was officially put into operation.

    8.Follow-up maintenance and management

    After the installation of the elevator, the property company or relevant management unit is responsible for the daily maintenance and management of the elevator.

    Please note that the installation of elevators in old communities involves many interests and problems, and requires full consultation and cooperation. In actual operation, it may also be affected by local policies and regulations, financial support and other factors, so it is best to consult relevant professionals or relevant departments before starting to ensure that the process of installing elevators is compliant and smooth.

  11. Anonymous users2024-01-27

    The installation of elevators in old residential areas is a more complex process, which needs to involve the approval of the department, the negotiation of the property and the owner. Generally speaking, the process of installing elevators in old residential areas is as follows:

    1.Determine the demand: First of all, the owner or property needs to determine the need for the installation of elevators in the community and solicit the opinions of the owners in order to form a consensus.

    3.Administrative approval: The application for the installation of elevators needs to be approved by the relevant departments. The specific approval process may vary from region to region, and it is generally necessary to submit application forms, planning plans, construction plans, project budgets and other materials, and approve them in accordance with relevant requirements.

    4.Fund raising: The installation of elevators involves a large capital investment and needs to be fund-raised. Funding can be raised by paying a specific amount of fees from the owner, taking out a loan from a bank, or partnering with a developer or third party.

    5.Select the construction unit: select the appropriate elevator supplier and construction unit, conduct comparative evaluation, and sign the construction contract.

    6.Design and scheme formulation: According to the actual situation of the community, the design scheme of the elevator is formulated, including location selection, elevator size, safety measures, etc.

    7.Residents' consultation: In the process of installing elevators, it is necessary to fully negotiate with residents to resolve possible disputes and reach a consensus among all parties.

    8.Renovation construction: The construction unit carries out renovation construction according to the design plan, and completes the installation and transformation of the elevator without affecting the normal life of residents.

    It is necessary to note that the process of installing elevators in old communities in different regions and specific situations may be different, and the relevant regulations and policies for the installation of elevators may also affect the specific steps and requirements of the process. Therefore, in the specific operation process, it is necessary to further consult and follow the relevant regulations and requirements of the local ** department.

  12. Anonymous users2024-01-26

    1. Announcement of the results of the consultation. After the applicant completes the consultation of the willingness and the false raising of funds, the district housing management department shall guide the owners' committee and the resident (village) committee to announce the results of the consultation on the wishes of the owners within the community.

    2. Planning permission. After receiving the architectural design plan for the installation of elevators, the architectural design plan will be publicized within 5 working days within the community, and the publicity period will be 10 working days. After the publicity, the applicant submits the architectural design plan for the installation of elevators and other materials to the planning department to go through the planning permission procedures, sign the notification commitment, complete the procedures, and issue the "Construction Project Planning Permit" on the spot.

    3. Housing safety demonstration. The construction drawing design documents for the installation of elevators shall be demonstrated by the housing safety experts entrusted by the relevant departments. If the materials meet the requirements of the argumentation, the argumentation organization unit shall organize expert argumentation within 7 days, and issue expert argumentation opinions within 3 days after the argumentation meeting.

    The design unit shall improve the design plan according to the expert argumentation opinions.

    4. Commencement information submission or construction permit. The applicant shall report to the district construction administrative department the basic situation of the elevator installation project, survey, design, construction, supervision unit related contract information, construction project planning permit, housing safety demonstration opinions and other materials.

    5. Elevator installation and use registration. The elevator installation enterprise fills in the qualification of the installation and construction enterprise, the planning permission of the elevator installation project, the start of construction, the elevator installation and other information, and accepts the installation supervision and inspection of the elevator by the inspection agency.

Related questions
10 answers2024-03-11

Now the elevator must be considered in the process of building construction in the community. >>>More

13 answers2024-03-11

There are a lot of so-called steps and CFs. For example, a knife fight is a situation that only exists in knife vs. knife fight, that is, between two players of similar strength. >>>More

9 answers2024-03-11

From your description, I feel like you're a person who has no idea. It is not your own subjective will to feel that you return to your original unit, otherwise you would not be so unhappy. Moreover, I think you have a bit of an inferiority complex, in other words, you always seem to care about what other people think of you, for example, when you come back this time, you must always be thinking about what others think about you coming back this time, isn't it? >>>More

6 answers2024-03-11

Of course, they follow the line of the public party, and those who don't go on the road will be killed. Your question is too broad, and it should be more specific.

42 answers2024-03-11

After all, it's professional knowledge, and I know this business. Specialize in this line. Find another way out, time, money, and opportunities. >>>More