    How to fill in the verification record of engineering quality control data:

    1. For details of the content and requirements, please refer to the verification record of the project quality control data of the unit (sub-unit) in the comprehensive management data of the construction project.

    2. When filling in the quality control data verification record for the division (subdivision) project, the content contained in the division (subdivision) project should be filled in completely and accurately.

    3. For important subdivisions (subdivisions) projects (such as pile foundations, natural foundations, foundation treatment and other subdivisions, underground structures (including waterproofing projects) subdivisions, and main structure divisions (subdivisions). Curtain wall sub-division project and low-voltage power distribution (including generator set) installation project, before the acceptance of the elevator installation division.

    The quality control data must first be self-inspected by the construction unit, and then sent to the supervision unit for review, and the review results meet the requirements of basic integrity, signed by the chief engineer and signed the opinion.

    Introduction to Engineering Quality:

    Engineering quality management refers to the systematic management activities carried out by using a complete set of quality management systems, means and methods to ensure and improve the quality of the project. Engineering is a fundamental problem.

    The construction of engineering projects, large investment, completion and use of a long period, only in line with quality standards, can be put into production and delivery, give full play to the investment benefits, combined with professional technology, management and mathematical statistics, to meet social needs. Many countries in the world have a set of strict supervision and inspection methods for the quality of projects.

  3. Anonymous users2024-02-05

    It depends on what you are doing in the construction. For example, the pile foundation part is the piling record, which is the construction record reported to the supervisor.

    An acceptance form is counted as one, and the number of papers can be counted, which is the total quantity of the entire division.

    For example, how many concealed acceptance records are in the main structure division, and the concealed acceptance in the main division is: steel bar concealment, concrete concealment, post-pouring belt concealment, masonry concealment and joint reinforcement concealment, etc., add up all these concealments, and fill in as many copies as there are in total.

    The data of the sub-projects under the sub-division are summarized and entered into the sub-division and scored, and then the sub-projects under the sub-division project are summarized and entered into the sub-division project and scored, and the scores are summarized step by step.

    Handwritten, machine typed is better, but must be signed. This is an archived material, and the participants should personally go through the traces to ensure the seriousness and integrity of the information.

    Professional Supervision Engineer.

    Architectural and structural part: drawing review, design changes, negotiation records; Engineering positioning measurement, pay-off record;

    Raw material factory certificate, entry inspection (test reputation) inspection report;

    Construction test report and witness test report;

    Acceptance records of concealed projects; construction records; Summary records of prefabricated components, doors and windows certificates;

    Foundation, foundation, main structure inspection and sampling inspection data;

    Investigation and processing data of engineering quality accidents;

    Division (sub-division) project quality acceptance record; Itemized project quality acceptance record;

    Project quality acceptance, inspection, batch inspection, and project inspection and evaluation records; Construction records of new materials and new processes.

    Water supply, drainage and heating part: water supply, drainage and heating engineering drawings review, design changes, negotiation records;

    Materials, components, device factory certificate, entry inspection (trial) inspection report; Experimental records of the strength and tightness of pipeline devices;

    Acceptance records of concealed projects; System cleaning, irrigation, water flow, ball test records;

    construction records; Division (sub-division) project quality acceptance record; Quality acceptance records of sub-projects and inspection batches;

    Building electrical part: building electrical engineering drawings review, design changes, negotiation records;

    Materials, components, device factory certificate, entry inspection (trial) inspection report;

    Records of debugging of electrical installations; Grounding and insulation resistance test records; Acceptance records of concealed projects;

    construction records; Division (sub-division) project quality acceptance record;

    Quality acceptance records of sub-projects and inspection batches;

    Normally, you don't need to submit an inspection form, if you have a completion inspection form or a completion acceptance application form or something like that in your area, use this.

    Supervision. The supervising unit personnel are required to verify these records.

    You can stamp the project information stamp. However, if the supervisor thinks that it is not possible, it is necessary to affix the official seal, which should be communicated with the supervisor more, because the information must first be reported to the supervisor.

  4. Anonymous users2024-02-04

    Answer: The sub-division project quality control data verification record form is a document used to record whether the quality control data is complete, accurate and compliant. The following requirements should be followed when filling in:

    1.Fill in the basic acre information such as date, project name, and project number.

    2.According to the division of divisions and subdivisions, the engineering quality control data will be checked item by item, and the verification record sheet will be recorded by ticking or crossing.

    3.For the problematic information, it should be explained in the remarks column and put forward rectification requirements.

    4.After the verification record form is completed, it should be reviewed and signed by a special person to ensure the authenticity and accuracy of the record.

    Explanation: The sub-division project quality control data verification record form is a very important document in the construction of the project, and the accuracy and completeness of its filling are related to the guarantee of the quality of the project. Double-checking is required when filling out to ensure that each item is adequately documented and reviewed.

    Expansion: For the verification of the quality control data of the sub-division project, the following points should also be noted:

    1.According to the actual situation of project construction, the requirements for different engineering quality control data should be different, and the content of the verification record form should also be adjusted accordingly.

    2.When filling in, you should pay attention to the format of the check record form to ensure that it is neat and clear.

    3.The verification record form should be properly kept to facilitate the follow-up review and rectification work.

    In short, the filling of the slag return form of the quality control data verification record of the sub-division project is an important step to ensure the quality of the project, which needs to be taken seriously.

  5. Anonymous users2024-02-03

    Answer: The sub-division project quality control data verification record form is a kind of ** used to record the data verification in the process of engineering quality inspection. Its main contents include engineering documents, design documents, construction drawings, construction plans, construction plans, construction technology, construction organization design, material test reports, testing reports, acceptance reports and other information verification.

    When filling in **, you need to follow the steps below:

    1.Fill in the basic information such as the date of the inspection, the personnel who are buried and transported;

    2.Check or fill in according to the inspection content, such as whether the engineering documents are complete, whether the design documents meet the requirements, etc.;

    3.For the materials with problems, you need to fill in the information such as the description of the problem, the corrective measures, and the person responsible for the rectification;

    4.Fill in the inspection results and remarks.

    Explanation: The sub-division engineering quality control data verification record sheet plays an important role in the engineering quality control. Through the verification of engineering documents, design documents, material test reports and other materials, we can find problems in time and take corrective measures to ensure the stability and reliability of the project quality.

    Expansion: When filling in the sub-division project quality control data verification record form, the following points need to be noted:

    1.Inspectors should strictly follow the inspection content to ensure the comprehensiveness and accuracy of the inspection;

    2.For problematic data, it is necessary to take corrective measures in a timely manner, and record the rectification situation in **;

    3.**The base chain should be kept intact, so that it can be queried and checked at any time.

    At the same time, it is suggested that engineering quality control personnel should conscientiously study and master relevant laws, regulations and standards, and improve the ability and level of engineering quality control.

  6. Anonymous users2024-02-02

    1.Fill in the basic information such as the name of the unit and the project, the name of the branch project, etc.;

    2.The verification record form should be filled in accordance with the requirements of the project quality control plan;

    3.The inspection content shall include the inspection content specified in the quality control plan;

    4.When filling in, it is necessary to indicate the time, place, inspectors, inspection results and other details of Zheng Qiao's inspection;

    5.For cases that do not meet the requirements, the reasons and treatment measures should be indicated;

    6.The verification record form should be managed by a special person and properly kept.

    Explanation: The sub-division project quality control data verification record form is one of the key documents for quality control in the construction project, and its filling requirements are very strict, and must be filled in strict accordance with the requirements of the quality control plan.

    Expansion: The requirements for filling in the quality control data verification record form of the sub-division project are not only to supervise the quality of the project, but also to ensure the safety and reliability of the project. Therefore, it is necessary to be careful and careful when filling in to ensure the accuracy and completeness of the content to ensure the smooth progress of the project construction.

  7. Anonymous users2024-02-01

    Answer: The filling of the quality control data verification record form of the sub-division project should be in accordance with the following requirements:

    1.Date Filled: The date on which the record form was written.

    2.Project Name: The name of the silver jujube of the project to be verified.

    3.Division Project Name: The name of the branch project to be verified.

    4.Verification items: The items that need to be verified and the content of the insights.

    5.Data Name: The name of the data to be verified.

    6.Verification situation: record the situation of the verification project, including the verification results, existing problems and treatment measures.

    7.Signature of the person in charge: Verify the signature of the person in charge.

    8.Note: There are additional notes that need to be made when filling out the record form.

    Explanation: The sub-division engineering quality control data verification record form is a record form for the construction unit to verify the project quality control data in accordance with the quality management requirements. The purpose of filling in the record form is to ensure that the quality of the project meets the standard requirements and to provide an effective basis for subsequent acceptance and evaluation.

    Expansion: The filling of the quality control data verification record form of the sub-division project needs to be refined according to the requirements of the specific project. When filling in, you need to pay attention to the following points:

    1.The verification project should include all the contents closely related to the quality of the project, such as engineering drawings, construction plans, engineering materials, equipment selection, etc.

    2.The verification situation should truly and accurately reflect the results of the inspection, and the measures for dismantling the front shed should also be specific and detailed.

    3.The filling process should be carried out in strict accordance with the requirements to ensure the authenticity and reliability of the record form.

  8. Anonymous users2024-01-31

    The sub-division engineering quality control data verification record form is a very important information in the construction of the project, and the following points need to be paid attention to when filling in. First of all, basic information such as the date of data verification and the person to be verified should be filled in as required. Secondly, fill in the data name, document number, version and other detailed information.

    Then, check the layout quality of the data, the layout of the text and the style of the drawings, and record the verification results in **. Finally, it is necessary to conduct a comprehensive evaluation of the verification results, including the overall quality of the information and existing problems, and fill in the relevant suggestions and comments. When filling in, it should be clear and meet the requirements of the specification.

  9. Anonymous users2024-01-30

    The sub-branch sub-branch project quality control data verification record form is an important tool for the quality control of construction projects. When filling in, it should be checked in accordance with the relevant quality standards and data requirements to ensure the accuracy and operability of the recorded smile. In the record, each sub-division project should be recorded separately, including the name of the data, unified code, version number, audit date and other important information, and at the same time need to indicate the specific content and standards that need to be verified, and verified one by one, and finally summarize and record the verification results.

    At the same time, the filler needs to sign and date on the record** to prove the authenticity and validity of the record.

  10. Anonymous users2024-01-29

    Answer]: B2020 version of the head of the head of the stool material p476 2019 version of the textbook p464

    The content of the inspection is the unit (sub-unit) project quality acceptance record, and the original text of the textbook: 1The inspection records of the division brigade engineering and quality control data in the unit (sub-unit) blind cavity engineering quality acceptance record form shall be filled in by the construction unit.

    The acceptance conclusion shall be filled in by the construction (supervision) unit. The official seal and signatory of the record form: the construction unit and the project leader of the construction unit; Supervision unit, chief engineer; The person in charge of the construction unit and the project of the construction unit; The project leader of the design unit and the design unit.

  11. Anonymous users2024-01-28

    Answer]: B2021 textbook p478

    1.The inspection records of the unit (sub-unit) project quality acceptance record form in the blind division project and quality control data should be filled in by the construction single faction. The acceptance conclusion shall be filled in by the construction (supervision) unit.

    The official seal and signatory of the record form: the construction unit and the project leader of the construction unit; Supervision unit, chief engineer; The person in charge of the dust inspection of the construction unit and the project of the construction unit; The project leader of the design unit and the design unit.

  12. Anonymous users2024-01-27

    Answers: c, d, e

    The relevant record sheet includes: construction site quality management inspection records; Records of sub-project quality inspection and training; Division project quality acceptance records; Unit project quality acceptance record; The quality control data of the unit project is checked and recorded.

Related questions
7 answers2024-03-21

A unit project refers to a project that has a separate design document and can be independently organized for construction, but cannot independently exert production capacity or benefits after completion. For example, in agricultural construction projects, the civil engineering, installation of instruments and equipment, pipeline installation, water supply and drainage, HVAC, electrical installation, etc. of laboratories are all unit projects.

15 answers2024-03-21

Competency sub-items. Description of specific capabilities. >>>More

7 answers2024-03-21

It is agreed that the subcontracting project of the general contractor shall be approved by the construction unit. The general contractor, Company A, subcontracts part of the non-main project to Subcontractor B with corresponding qualifications, and has obtained the consent of the construction unit. According to the Building Act. >>>More

15 answers2024-03-21

If the registered cost engineer is practiced, it is necessary to have the certificate of registered cost engineer and the certificate of the work unit, and it is not necessary that the work unit must have the qualification of engineering cost consulting, only the engineer can engage in the relevant cost work. So what the landlord asked, yes.

6 answers2024-03-21

Approval by the construction department and the communications management department.