    <> engineering design is an activity that comprehensively analyzes and demonstrates the technical, economic, resource, environmental and other conditions required for the construction project according to the requirements of the project, and compiles the design documents of the construction project. So how to bid for engineering design? Here's the answer!

    What is Engineering Design Bidding.

    Engineering design bidding refers to the tendering unit on the proposed project design task issued a tender announcement, in order to attract the design unit to participate in the competition, the tendering unit review in accordance with the requirements of the bidding documents, in accordance with the requirements of the bidding documents, within the specified time to the tendering unit to fill in the bidding documents, the tendering unit to determine the best design unit to complete the engineering design task activities called engineering design bidding.

    How to bid for engineering design.

    Bidding for construction engineering design may be open to public bidding or invitation to bid in accordance with the law.

    1.Open tender.

    According to the "Provisions on the Scope and Scale Standards for Bidding for Engineering Construction Projects" issued by the former State Development Planning Commission in May 2000, the following circumstances must be carried out in addition to obtaining the approval of the relevant departments in accordance with the law to not conduct public bidding:

    1) For the procurement of design services with an estimated price of more than 500,000 yuan for a single contract;

    2) Bidding for design services for engineering construction projects that use all state-owned capital investment or state-owned capital investment in a controlling or dominant position;

    3) National key projects determined by the development and reform department and local key projects determined by the people of provinces, autonomous regions and municipalities directly under the Central Government.

    2.Invitation to tender.

    For projects that must be tendered in accordance with the law, bidding may be invited under the following circumstances:

    1) The technology is complex, there are special requirements or limited by the natural environment, and only a small number of potential bidders can choose from;

    2) The cost of using public bidding accounts for too large a proportion of the project contract amount.

    If the tenderer adopts the method of inviting bidding, it shall ensure that there are more than three specific legal persons or other organizations with the ability to undertake the design of the bidding project and have the corresponding qualifications to participate in the bidding.

    The above internal configuration of the town is about "how to bid for engineering design?" I hope that these internal travel capacity will be helpful to everyone. If you want to know more about the bidding information, please log in to the bidding network to view!

  2. Anonymous users2024-02-06

    1. To successfully bid for the project, we must first understand the functions of Party A and Party B;

    Second, the bidding is actually Party A to do a project, the project can be software, hardware, section call engineering, etc. Bidding is the process of putting a software implementation plan, business plan, table and relevant qualification documents into a bag;

    3. To successfully bid, you must know the scoring criteria;

    Fourth, there is another important factor in the successful bidding, that is, the relationship between all walks of life must be good, and there is strong public relations as the backing support. Generally speaking, PR accounts for about 80% of the success factor;

    Fifth, before talking about the details of the bidding process, we must first talk about the key points of the bidding;

    Sixth, in order to successfully bid, aside from the public relations factor, the most important thing is to have a "bright spot", the bright spot can be divided into two kinds: large and small, the big highlight refers to the directional, and the small highlight refers to a small piece of software function that is particularly convenient and easy to use.

  3. Anonymous users2024-02-05

    Summary. Generally speaking, the wider the scope and the deeper the depth of the design, the more conducive it is to grasp the scale, quantify the index, and compare the advantages and disadvantages of the evaluation time. However, excessive requirements may cause the bidder to invest too much manpower, material and financial resources, increase its economic risk and reduce its enthusiasm for bidding.

    Therefore, determining the appropriate design scope and depth is a very important technical issue in the preparation of actual bidding documents.

    Generally speaking, the wider the scope and the deeper the depth of the design, the more conducive it is to grasp the code return scale and quantify the indicators when evaluating the standard, and compare the advantages and disadvantages. However, excessive requirements may cause the bidder to invest too much manpower, material and financial resources, increase its economic risks and reduce its enthusiasm for bidding. Therefore, determining the appropriate design scope and depth is a very important technical issue in the preparation of actual bidding documents.

    How can the design stage of a project be managed and controlled?

    It is necessary to let it know the investment situation of each sub-project, so that the relevant single trillion lead tremors think that we are very familiar with the investment situation of each sub-division, and secondly, the relevant units have the awareness of investment control before the implementation of the design, and the investment control after the design results come out to obtain the initial expected results. It also enables all units to have a clear understanding of the rationality of investment allocation for the purpose of the project, so that they have the investment concept of one long-term and the other.

    The management personnel, that is, you, should try to instill the thinking of the shortage of project funds to the user, the planning institute, and the competent department, and each decision will be fed back to the preliminary budget estimates.

    How can value engineering be used to optimize design solutions?

    That's a very good question, wait for me to think about it for a moment.

    In my opinion, the principle of value engineering is to reliably achieve the necessary functions of the product at the lowest cost by analyzing the relationship between the product function such as macros and the cost. Taking residential engineering as the object of value analysis, this paper specifically explains the steps and cavity methods of using the weighted scoring method to optimize the design scheme, and emphasizes the use of value engineering to optimize the design scheme, which is not a one-sided belief that the lower the project cost, the better.

Related questions
7 answers2024-03-27

A good entrepreneurial project must have these conditions: small investment, large return, high profit, low risk, and great potential, all of which are indispensable! Let's break them down one by one. >>>More

14 answers2024-03-27

Do weak current projects, peers, friends. Let me give you my advice. >>>More

9 answers2024-03-27

I believe that a friend is the one who shows you the way forward. A friend is someone who solves your problems, a friend is a person who knows you well, and a friend is someone who cares for you. >>>More

4 answers2024-03-27

There are many people who are now wondering how to set up a good group, so I will give you a few small suggestions. 1.Caring offensive. >>>More

12 answers2024-03-27

Start small, do what you can do, and boost your self-confidence. Small things can be done well, and big things can definitely be done well. Take your time and don't rush things, many things don't happen all at once.