The annual summary report of the photovoltaic assembly workshop, I have the data, I want a sample ar

Updated on workplace 2024-03-14
5 answers
  1. Anonymous users2024-02-06

    Home: a. Completed the construction project of the third workshop, expanding from 150MW in the first year to 350MW at present. The smooth production according to the plan has played a decisive role in the completion of the quarterly production target.

    Two. The module yield rate has increased from the fourth quarter of the year to the next target.

    Three. The lamination time of the module was scientifically and reasonably adjusted, and the production capacity was increased by 20%. The original 350MW was increased to 410MW

    Four. The labor efficiency is increased by 40%, and the labor cost is reduced by 500,000 months.

    Five. Material control cost and price difference are driven by the current reduction.

    Six. Actively develop subordinates.

    Text: 1) Increase in module yield.

    Component shop yield improvements.

    One. Process improvements.

    1.Improvement of incoming cell materials and industrial waste.

    2.Component manufacturing process, new tooling and new project import.

    Two. Component equipment improvements.

    The contribution to the yield through process improvement is as follows (including the improvement of incoming fragments with the cell team).

    Below is a chart of the data).

    Through the improvement of equipment, the contribution to the yield is as follows.

    The specifications of the operation details of all processes have been formulated, and the documents have been formed.

    Below is a chart of the data).

    As a result of the above improvements, the trend before and after the improvement of the yield rate is as follows.

    Below is a chart of the data).

    2) Personnel cost savings.

    The component workshop has set up an improvement team related to production, equipment and process personnel to improve the process, tooling and layout on site, and the introduction of new processes and new tooling has greatly improved work efficiency and reduced personnel.

    The following is a chart of the improvements and effects of each position).

    3) Increase production capacity.

    The completion of the preparation of the three modules has expanded the module production capacity and played a decisive role in the completion of the production target.

    Below is a chart of the data).

    4) Material cost reduction.

    Below is a chart of the data).

    That's all for the general aspect.,The details have to be modified by the landlord himself.,I hope it will help you.。

  2. Anonymous users2024-02-05

    The importance of product quality, inspection and management.

    There is no model text. The following is for reference, mainly write about the main work content, how to work hard, the achievements, and finally put forward some reasonable suggestions or new directions...

    The work summary is to let the superior know what contribution you have made and reflect the value of your work.

    So several points should be written:

    1. Your understanding of the position and work 2. What exactly you have done.

    3. How do you work hard and what things do you use your brain to solve? Even if it's nothing, write about some difficult questions and how you solved them with effort.

    4. What abilities do you need to improve or what knowledge do you need to enrich in your future work?

    5. Superiors like to take the initiative to work. You must be prepared for everything in your part, that is, the preparation work in advance is as follows for your reference:

    Summarization is to conduct a comprehensive and systematic general evaluation and analysis of the situation in a period of time, and analyze achievements, shortcomings, and experience. Summarizing is a type of applied writing, which is the rational thinking of the work that has already been done.

    The basic requirements for summarizing.

    1 The summary must have an overview and description of the situation, some of which are relatively simple, and some of which are more detailed.

    2 Achievements and shortcomings. This is the main thing to summarize. The purpose of summarizing is to affirm the achievements and find out the shortcomings. What are the achievements, how big are them, what are the aspects, and how they were achieved; The number of shortcomings, the aspects in which they manifest themselves, and how they arise should be clearly written.

    3 Lessons learned. In order to facilitate future work, it is necessary to analyze, study, generalize, and form theoretical knowledge of previous work experience and lessons.

    Notes on Summary:

    1. We must seek truth from facts, and the achievements are basically not exaggerated, and the shortcomings are basically not reduced. This is the basis for analysis and drawing lessons.

    2 Be organized. The sentences are smooth and easy to understand.

    3 Be detailed. There are important and secondary, and the main points should be highlighted when writing. The questions in the summary should be prioritized and detailed.

    Basic format of the summary:

    1. Title. 2. Text.

    Beginning: an overview of the situation, an overall evaluation; The outline is summarized and the whole text is summarized.

    Subject: Analyze the shortcomings of the achievements and summarize the lessons learned.

    Conclusion: Analyze the problem and clarify the direction.

    3. Payment. Attribution and date.

  3. Anonymous users2024-02-04

    Brother, I can tell you a few major items, and you have to use your data to speak.

    1. Capacity, 2. Damage of materials (cells, welding strips, EVA, TPT, glass, aluminum alloy frames, junction boxes and some accessories, etc.).

    3. Personnel turnover rate.

    4. On-site control (5s, 6s|.))

    5. Quality (one-time pass rate, rework pass rate).

    6. The top 3-5 unqualified (the top few in the proportion of various NG phenomena) target data Actual achievement data.

    The methods achieved, the reasons for not achieving them, and the corresponding improvement measures, whether they have been implemented or are being followed up.

    The problems that occurred during the period, several improvement measures adopted, and the effect was compared.

    Don't look at the fact that there are only a few points that can be written about a lot.

  4. Anonymous users2024-02-03

    How much is your email address, I can send you a copy.

  5. Anonymous users2024-02-02

    The work summary is to let your leaders understand you and reflect the value of your work. So write a couple of points:

    1. What have you done, be concise and to the point;

    2. Which of these things need to be solved with your personal skills, or need your personal brain to solve, so that the leader can see that you are working with your heart and brain, even if there is no problem, you have to write about the difficult problems encountered, and then solve them through your efforts, without bringing burden to the company or what benefits it brings;

    3. Through the work, your understanding of the position and work;

    4. In the future, you still need to improve your ability or what knowledge you need to supplement, and you have begun to do it and learn;

    5. Boss Fan Ant likes people who are spontaneous and spontaneous, rather than people who push and push. So, if you don't have a job assigned to you but you do your job, you have to be prepared for it.

    That's pretty much the time you write.

Related questions
5 answers2024-03-14

Installation quota 12 volume 7 chapter 1 section of the solar power supply part check which quota set, installation quota book 2 electrical equipment installation does not have photovoltaic related quota subheading.

8 answers2024-03-14

For photovoltaic companies, of course, it is the pursuit of profits; At present, most of China's photovoltaic products are exported, which does not contribute much to China's own energy structure. >>>More

16 answers2024-03-14

Photovoltaic power generation is a technology that directly converts light energy into electrical energy by using the photogenerated volt effect at the semiconductor interface. It is mainly composed of three parts: solar panels (components), controllers and inverters, and the main components are composed of electronic components. Solar cells can be encapsulated and protected in series to form large-area solar cell modules, and then combined with power controllers and other components to form photovoltaic power generation devices. >>>More

10 answers2024-03-14

It's up to you in that province.

What are the specific photovoltaic poverty alleviation areas in China in 2015? >>>More

16 answers2024-03-14

Another idea for the landlord, from the cost is indeed low, but it also depends on where you use it. >>>More