    What is the specific content of the implementation rules for the supervision of building energy-saving projects, and the following Zhongda Consulting will answer for you.

    Second, the basis of preparation:

    1. The "Supervision Plan" approved by the examination and approval;

    2. The reviewed "Special Construction Plan";

    3. "External Wall Thermal Insulation System of Rubber Powder Polystyrene Particles" (JG158-2004);

    4. Technical Regulations for External Thermal Insulation Engineering of External Walls (JGJ144-2004);

    5. Technical Regulations for Energy-saving Application of Residential Building Envelope (DG TJ08-206-2002);

    6. Regulations for the Acceptance of Construction Quality of Energy-saving Projects in Residential Buildings (DGJ08-113-2005);

    7. "Notice on the Implementation of the Empty Cover Shanghai Building Energy Conservation Management Measures" Shanghai Jianjian (2005) Crack No. 649 Document and other relevant documents.

    3. Characteristics of building energy-saving projects:

  2. Anonymous users2024-02-05

    1. The contract management function reflects the role of contract management of engineering construction supervision, and the contract determines the objectives of the project (cost), duration and quality (function), and stipulates the relationship between the responsibilities and rights of both parties to the contract. Therefore, the management of the contract by the construction project supervision must be the core of the project management. Broadly speaking, the implementation and management of construction projects can be included in the scope of contract management.

    Contract management runs through the whole process of project implementation and all aspects of project implementation and implementation. It serves as a guide for other work and serves as the overall control and guarantee for the implementation of the entire project. In the modern section of the project, the overall goal of the project is unclear if there is no sense of contract; Without contract management, it is difficult to form a system and be efficient in project management.

    Engineering project management starts with contract management. The first step into the project is the contract analysis, and the supervisor controls the entire project management work. Contract management has administrative functions and work processes.

    Supervision forms a complete contract management subsystem through contract analysis, contract information, contract network, contract implementation control and claim management. 2. The role of engineering construction supervision in coordinating the contractual relationship between all parties involved in the project In the market economy, the role and status of the contract are very important. Especially for engineering projects, the contract is particularly important because of the large subject matter, long performance time and many coordination relationships.

    Including the construction unit, survey and design unit, construction unit, consulting unit, supervision unit, material and equipment units, etc., all rely on the contract to establish a relationship with each other. Once the construction unit entrusts the entire project to the construction project supervision, then the supervision unit must manage some contracts of the construction unit. It is inevitable that a contract dispute arises between the owner and the contractor during the construction of the project, and at this time, the supervisor as a third party should take the initiative to coordinate and resolve it, and ask the third party to mediate and resolve it if the agreement is not reached, and when the mediation fails, it needs to be finally resolved through arbitration or litigation.

    The supervising engineer shall clearly agree with both parties on the mutually acceptable mediator in the special banquet clause, and the way to finally settle the contract, according to the basis of the claim, in strict accordance with the provisions of the construction contract, and fairly determine the responsible party. Here it is important to note the conditions for the establishment of a construction contract claim: in contrast to the construction contract, the contractor has incurred additional expenses in excess of the construction cost, or the construction period has been delayed due to the owner's reasons; Contractors who do not belong to the contractor shall be liable; The contractor submitted a notice of intent to claim and a claim report in accordance with the procedures set out in the construction contract.

    Article 32 of the Construction Law shall be in accordance with laws, administrative regulations and relevant technical standards, design documents and construction scale contracts, the contractor in terms of construction quality, construction period and use of construction funds, etc., on behalf of the construction unit to supervise. If the project supervisor believes that the construction of the project does not meet the requirements of the engineering design, the construction technical standards and the contract, he has the right to require the construction enterprise to make corrections. If the project supervisor finds that the engineering design does not meet the quality standards of the construction project or the quality requirements agreed in the contract, he shall report to the construction unit and request the design unit to make corrections.

  3. Anonymous users2024-02-04

    <> supervision work in the preparation stage of building energy-saving construction is very important, and every detail of the supervision work is related to the construction efficiency and project quality in the future, which is very important. Zhongda Consulting will introduce the supervision work in the preparation stage of building energy-saving construction.

    1.Before the construction of the project, the supervising engineer organizes the supervision personnel to be familiar with the design documents, the national and municipal Peibu relevant building energy conservation regulations and the mandatory standards for building energy conservation related to the project. Participate in the review of construction drawings and design disclosure.

    2.Review whether the building energy-saving design drawings have been reviewed and qualified by the construction drawings and travel plan review unit. Construction drawings that have not been reviewed or reviewed and do not meet the mandatory building energy efficiency standards shall not be used.

    3.Disclosure of building energy-saving design. The project supervision personnel participate in the building energy-saving design technical disclosure meeting organized by the construction unit, and the supervising engineer signs the minutes of the building energy-saving design technical disclosure meeting.

    And put forward written opinions and suggestions to the design unit through the construction unit for the problems existing in the drawings.

    4.Before the start of the building energy conservation project, the chief engineer of the project with the town shall organize the professional supervision engineer to review the special construction plan and technical measures submitted by the contractor for building energy conservation, and put forward review opinions.

  4. Anonymous users2024-02-03

    The purpose of the introduction of the management measures.

    In order to strengthen the supervision and management of energy-saving quality of civil construction projects and ensure that civil construction projects meet the building energy-saving standards, the Ministry of Construction recently issued the "Measures for the Supervision and Management of Energy-saving Quality of Civil Construction Projects", which clarifies the responsibilities and obligations of construction units, design units, construction units, supervision units, construction drawing review institutions, engineering quality inspection institutions and other units, and stipulates that they cannot meet the requirements of energy conservation.

    Specific laws and regulations.

    Article 1 in order to strengthen the supervision and management of the energy-saving quality of civil construction projects, to ensure that civil construction projects meet the building energy-saving standards, in accordance with the "Regulations on the Quality Management of Construction Projects", "Regulations on the Management of Construction Engineering Survey and Design", "Regulations on the Supervision of Mandatory Standards for the Implementation of Engineering Construction", "Regulations on the Management of Energy Conservation in Civil Buildings", "Measures for the Review and Management of Construction Drawings and Design Documents for Housing Construction and Municipal Infrastructure Projects", "Measures for the Management of Quality Inspection of Construction Projects" and other relevant laws and regulations, these measures are formulated.

    Article 2 Those who are engaged in the new construction, reconstruction, expansion and other related activities of civil construction projects within the territory of the People's Republic of China and the supervision and management of the quality of civil construction projects must abide by these measures.

    The term "civil buildings" in these measures refers to residential buildings and public buildings.

    Article 3 construction units, design units, construction units, supervision units, construction drawing review agencies, engineering quality inspection institutions and other units shall abide by the national laws, regulations and technical standards related to building energy conservation, fulfill the obligations agreed in the contract, and be responsible for the energy-saving quality of civil construction projects in accordance with the law.

    The competent departments of construction in all localities and the engineering quality supervision institutions entrusted by them shall implement the supervision and management of the quality of building susceptibility and sliding skin energy in accordance with the law.

    Article 4 The construction unit shall perform the following quality responsibilities and obligations.

    Article 5 The design unit shall perform the following quality responsibilities and obligations.

    Article 6 construction drawing review agency shall perform the following quality responsibilities and obligations.

    Article 7 The construction unit shall perform the following quality responsibilities and obligations.

    Article 8 supervision units shall perform the following quality responsibilities and obligations.

    Article 9 engineering quality inspection institutions shall be found in the process of testing the construction unit, supervision unit, construction unit in violation of the mandatory standards for building energy efficiency, timely report to the local construction department or engineering quality supervision agency.

    Article 10 the competent department of construction and its entrusted engineering quality supervision agency shall strengthen the supervision and inspection of the implementation of building energy efficiency standards in the construction process, and shall be ordered to make corrections if it is found that the construction is not carried out in accordance with the construction drawing design documents and violates the building energy conservation standards.

    Article 11 construction, survey, design, construction, supervision units, as well as construction drawing review and engineering quality inspection institutions in violation of the relevant laws and regulations on building energy conservation, the competent department of construction shall be punished according to law.

    Article 12 Projects that fail to meet the requirements of energy conservation shall not participate in all kinds of award activities.

Related questions
3 answers2024-03-13

Heat transfer science is a discipline that studies the laws of heat transfer process, and many of these theories can be applied to building energy efficiency, which can be said to be its foundation. Building energy conservation refers to the rational use of energy in the production of building materials, construction and use of buildings and structures; Minimize energy consumption while meeting the same needs or achieving the same purpose. In China, the energy-saving measures taken during the construction process are: >>>More

5 answers2024-03-13

1. Code for thermal design of civil buildings (GB 50176---93) 2. Design standards for energy-saving buildings of residential buildings in severe cold and cold areas (JGJ 26-2010) 3. Design standards for energy-saving buildings of residential buildings in hot summer and cold winters (JGJ134--2001) 4. Energy conservation design standards for residential buildings in hot summer and warm winters (JGJ 75-2003) 5. Technical specifications for energy-saving renovation of existing heating residential buildings (JGJ 129-2000) 6. Energy Conservation Inspection Standards for Heating and Residential Buildings (JGJ132-2001) VII. Energy Conservation Design Standards for Public Buildings (GB 50189---2005) VIII. Regulations on Energy Conservation in Civil Buildings (Order No. 530).

8 answers2024-03-13

The project supervision is well managed, and it is over every day to find a little fault, and there is a sign after completing the progress, how simple it is. The salary is a little lower, but there is a lot of oil and water, and you have just graduated. After two years, you'll know that it's not a problem to get more than 100,000 a year. >>>More

9 answers2024-03-13

Seek truth from facts according to the situation on the spot.