How to write a summary of road construction organization design

Updated on society 2024-03-12
5 answers
  1. Anonymous users2024-02-06

    Organizational design of road construction.

    Table of Contents: Chapter 1, Notes on Preparation and Rationale 3

    Chapter 2 Overview of Engineering Design 3

    Chapter 3, Construction Personnel Organization and Overall Arrangement of the Project 27 Chapter 4, General Layout of Construction 30

    Chapter 5 Main Construction Methods 34

    Chapter 6, the description of the main materials (materials) of the project input and the entry plan 82 Chapter 7, the description of the main construction machinery and equipment invested in the project and the entry plan 85 Chapter 8, the description of the labor arrangement 88

    Chapter 9 Technical and Organizational Measures to Ensure Project Quality 88 Chapter 10 Technical and Organizational Measures to Ensure Safe Production 112 Chapter 11 Technical and Organizational Measures to Ensure Civilized Construction 118 Chapter 12 Technical and Organizational Measures to Ensure the Construction Period 119 Chapter 13 Technical and Organizational Measures to Reduce Project Costs 126 Chapter 14 Table of Main Construction Machinery and Equipment to be Invested 127 Chapter 15 Proposed Labor Plan 128

    Chapter XVI Construction schedule 129

    Chapter 17, General Plan Layout and Temporary Land Use Table 129 Content Introduction: The site strata are mainly filled soil, sand-bearing organic matter medium liquid limit (silty) clay soil, medium sandy soil, sand-bearing medium liquid limit clay soil, coarse sandy soil, sand-containing medium liquid limit silty soil, soil-like strongly weathered granite, and fragmented strongly weathered granite. The evaluations are as follows:

    Fill soil: gray-yellow, gray, gray-black, mainly newly backfilled from cohesive soil, containing a small amount of construction, domestic garbage, and a small amount of sand in some sections. Without manual special compaction, the self-weight consolidation is not completed, the density is uneven, and the thickness is uneven.

    Backfill time 3-4 years. The dry and wet type of this layer of soil is dry and too wet. The grade category of this layer of soil and stone is loose soil.

    The layer is distributed along the line, mainly backfilled with cohesive soil in the near future, the self-weight consolidation is not completed, the engineering performance is poor, and it is not suitable to be directly used as the roadbed or pipeline bearing layer, and the thickness of the layer is uneven.

  2. Anonymous users2024-02-05

    This is the project profile information.

  3. Anonymous users2024-02-04

    Construction organization design is the core and soul of the construction organization, is the conception and specific arrangement of the whole process of the construction project, and is used to guide the technical, economic and organizational comprehensive documents of the activities of the whole process of the construction project.

    When compiling, the project management organization setting, the overall deployment of construction, construction preparation, the main sub-project construction methods, engineering quality assurance measures, safety and civilized construction measures, construction site management measures and many other factors are fully considered as much as possible, highlighting the scientific, applicability and pertinence, is to ensure high quality, low consumption, safety, civilization, high-speed completion of all construction tasks of important economic and technical documents.

    The design mainly includes the following: engineering construction organization design, construction plan. In order to ensure the construction period, quality and safety, civilized construction site, cost saving and other conditions, the preparation of targeted construction organization design, the characteristics of each sub-group project, structural characteristics, construction difficulty and quality requirements, the preparation of a feasible construction plan.

    In order to guide the construction to successfully complete the construction of the project, control the cost of the project, and create a high-quality project.

  4. Anonymous users2024-02-03

    When it comes to the highway construction organization design template, at this stage, what are the main contents of China's highway construction organization design? What is the basic situation? The following is a basic introduction to the highway construction organization design template compiled by Zhongda Consulting:

    The organization design of highway construction is a discipline that studies the rational organization and arrangement of many elements in the process of highway capital construction.

    At this stage, the highway construction organization design template mainly includes: (1) the construction plan and construction method of the project (2) the construction sequence of each sub-project (3) measures to ensure the quality and duration of the project (4) the quality, safety, environmental protection assurance system, management measures (5) other matters that should be explained and other related content, in order to make the personnel of the file more intuitive understanding of the highway construction organization design, and sort out the basic content of the highway construction organization design template. The basic situation is as follows:

    1.Strictly follow the principles of design documents, technical specifications and quality acceptance standards. In the preparation work, in strict accordance with the design requirements, conscientiously implement the current national technical specifications and quality acceptance standards, correctly organize the construction, and ensure that the quality of the project is excellent.

    2.Adhere to the principle of seeking truth from facts. In the formulation of the construction plan, give full play to the technical advantages of our company and the characteristics of specialization and mechanized joint operation, adhere to scientific organization, reasonable arrangement and balanced production, and ensure that the construction of this section is completed with high speed, high quality and high efficiency.

    3.According to the principle of project method construction, organize the construction of the project of Sophi Suiben. Through full cooperation with the owner, supervision and design unit, the comprehensive use of personnel, machinery, materials, funds and information.

    Achieve the best combination of quality and cost. Determine the construction period and construction plan realistically to ensure that all projects are completed on time, with high quality, safety and efficiency.

    4.Actively promote the application of the principle of the four new achievements, in the construction of various processes, for the ability to improve the quality of the project, speed up the construction progress, reduce the cost of the new technology, new equipment, new technology, new materials to actively adopt, play a leading role in the construction of roads and bridges.

  5. Anonymous users2024-02-02

    1. Topic: Accurate, concise, eye-catching and novel.

    2. Table of contents: The table of contents is a brief table of the main paragraphs in **. (Short ** does not need to be listed).

    4. Keywords or subject words: Keywords are selected from the title, summary and body of **, and are words with substantive significance for the central content of **. Keywords are words that are used as the indexing of the content characteristics of the machine system, which is convenient for the information system to collect for readers to search.

    Subject headings are normalized words, and when determining subject headings, the subject should be converted into standardized words in the thesaurus according to the indexing and assembly rules.

    5. **Text:

    1) Introduction: The introduction, also known as the preface, preface and introduction, is used at the beginning of **. The introduction should generally write the author's intention in a general manner, explain the purpose and significance of the topic, and indicate the scope of writing. The introduction should be short and to the point.

    a.Presenting - Arguments;

    b.analysis of the problem - arguments and arguments;

    c.Problem Solving - Arguments and Steps;

    d.Conclusion. 6. A ** reference is the main literature that can be referred to or cited in the writing of ** at the end of **. References should be on a separate page, and the annotation method should be in accordance with the "GB7714-87 Post-text Reference Bibliography Rules".

    1) The references listed should be official publications for the reader's reference.

Related questions
1 answers2024-03-12

The basic way of flow construction.

First, wait for the rhythm of the flow of construction. >>>More

6 answers2024-03-12

The preparation procedure for the general design of the construction organization is as follows:1. Collect and be familiar with the relevant materials and drawings required for the general design of the construction organization, and investigate and study the characteristics and construction conditions of the project; >>>More

2 answers2024-03-12

[Legal Analysis].:Construction organization design: >>>More

8 answers2024-03-12

and a wide range of savannahs. There is a prairie, wide, that prairie should be very good.

6 answers2024-03-12

It generally includes the following contents: engineering pay-off, earthwork excavation, concrete pouring, steel bar binding, formwork installation, brick wall masonry, steel (wood) structure manufacturing and installation, stone paving and other decoration, sketches and furniture placement; Terrain arrangement, seedling planting, etc.