Who has a graduation design construction organization plan

Updated on society 2024-03-12
3 answers
  1. Anonymous users2024-02-06

    There is a forum for the University of Architecture Hall, so go find it.

  2. Anonymous users2024-02-05

    Table 1 Textual description of the construction organization design.

    Equipment, personnel mobilization cycle.

    and methods for transporting equipment, personnel and materials to the construction site.

    1. Equipment and personnel mobilization cycle.

    1. Equipment: The transportation of construction machinery and test and measurement equipment shall be managed by our unit in a unified manner, and the construction schedule shall be arranged in time according to the construction schedule promised in the bid. Within one month, the main subgrade construction machinery, concrete mixing equipment, drilling rigs; The first batch of construction machinery and equipment such as test and measuring instruments and equipment entered the site.

    The incoming machinery is in good condition, clean and new, and maintenance is done before starting; After entering the site, the inspection and calibration of test equipment and measuring instruments should be done in time to ensure the normal use during construction.

    2. Personnel: According to the construction organization and design arrangement, organize all kinds of professionals who intend to participate in the construction of the project to participate in the pre-construction training in advance. Make the personnel involved in the construction understand the characteristics and technical quality requirements of the project.

    After receiving the notice of winning the bid, the project management department officially operated and immediately organized the construction personnel to enter the site. Within half a month, the main management personnel, engineering and technical personnel of the project were all in place. The professional management personnel, skilled workers and labor personnel in each work area are in place one after another as planned.

    In one month to complete the preliminary construction, before the end of October 2001, part of the subgrade construction equipment, drilling rigs and concrete mixing equipment organization into the site, in early November with earthwork construction conditions, November 15 before the pile foundation construction conditions. And gradually increase the number of management personnel, professional and technical personnel and professional workers according to the construction plan and progress.

    2. The method of transporting equipment, personnel and materials to the site.

    1. Equipment: Construction machinery and equipment are coordinated and deployed by our unit and transported to the construction site by truck.

    2. Personnel: The project management personnel and engineering and technical personnel shall be appointed by our unit in accordance with the commitments in the bidding documents. The professional construction team is uniformly organized and dispatched by our unit.

    3. Materials: The project manager department has a material department to manage the materials of the project in a unified manner. According to the material entry plan, organize the material supply to enter the site in a timely manner, and do a good job in the inspection of raw materials to ensure the quality of materials.

    Construction materials are mainly transported to the construction site by motor transportation; Steel, cement and other special materials and qualified professional manufacturers directly sign the purchase and sale of transportation contracts to ensure the quality and quality of materials. The construction oil project management department has its own oil storage tank and regularly stores oil.

  3. Anonymous users2024-02-04

    I'll send you a template and you'll take a look.

    Zhengdong New District Jiagang Demolition and Resettlement Community No. 1 Construction Organization Design Scheme.

    Summary. The construction organization design is the core and soul of the construction organization, and it is a comprehensive document that is used to guide the technical, economic and organizational activities of the whole process of the construction project.

    This construction organization design is a programmatic document for the engineering design plan of Building 1 of Jiagang Demolition and Resettlement Community, Zhengdong New District. When compiling, the project management organization setting, the overall deployment of construction, construction preparation, the main sub-project construction methods, engineering quality assurance measures, safety and civilized construction measures, construction site management measures and many other factors are fully considered as much as possible, highlighting the scientific, applicability and pertinence, is to ensure that high quality, low consumption, safety, civilization, high-speed completion of all construction tasks of important economic and technical documents.

    The design mainly includes the following: engineering construction organization design, construction plan. In order to ensure the construction period, quality and safety, civilized construction site, cost saving and other conditions, the targeted construction organization design is prepared, and the characteristics, structural characteristics, construction difficulty and quality requirements of each sub-project are prepared, and a feasible construction plan is prepared.

    In order to guide the construction to successfully complete the construction of the project, control the cost of the project, and create a high-quality project.

Related questions
1 answers2024-03-12

The basic way of flow construction.

First, wait for the rhythm of the flow of construction. >>>More

6 answers2024-03-12

The preparation procedure for the general design of the construction organization is as follows:1. Collect and be familiar with the relevant materials and drawings required for the general design of the construction organization, and investigate and study the characteristics and construction conditions of the project; >>>More

8 answers2024-03-12

and a wide range of savannahs. There is a prairie, wide, that prairie should be very good.

5 answers2024-03-12

Organizational design of road construction.

Table of Contents: Chapter 1, Notes on Preparation and Rationale 3 >>>More

6 answers2024-03-12

It generally includes the following contents: engineering pay-off, earthwork excavation, concrete pouring, steel bar binding, formwork installation, brick wall masonry, steel (wood) structure manufacturing and installation, stone paving and other decoration, sketches and furniture placement; Terrain arrangement, seedling planting, etc.