How to do a good job in construction safety in the rainy season

Updated on society 2024-03-28
2 answers
  1. Anonymous users2024-02-07

    Rainy season safety construction measures:

    1. Arrange work and rest time reasonably. In summer, the construction time should be compressed to both ends as much as possible, avoid the high temperature at noon, and stop outdoor operations when the temperature exceeds 37, and there should be ventilation and cooling measures when working indoors. In case of heavy stormy weather, all operations should be stopped and personnel should be evacuated to a safe place.

    2. Do a good job of on-site drainage.

    1) According to the construction plan and the general drainage plan, the natural terrain is used to determine the drainage direction, and the drainage ditch is dug according to the specified slope to ensure that the drainage is unimpeded.

    2) In the rainy season, the construction site is close to the high ground, and the drainage ditch should be dug at the edge of the high ground to deal with dangerous rocks to prevent landslides, landslides and other disasters.

    3) Ensure that the road is unblocked, and the road surface is hardened or paved with gravel, slag or other materials according to the actual situation, and the arch is heightened as required.

    4) Protection of raw materials, finished products and semi-finished products. The material library is comprehensively and regularly inspected, repaired in a timely manner, the surrounding drainage is good, the wall foundation is firm, no rain leakage, and corresponding rainproof measures are taken for the storage of steel and other materials to ensure the quality and safety of materials.

    5) Set up continuous and smooth drainage facilities and emergency supplies in strict accordance with the requirements of flood control, such as water pumps and related equipment, plastic sheets, linoleum and other materials.

    Safety precautions for construction in the rainy season.

    1. Strengthen safety inspections and timely dispatch of the town's problems. Conduct regular inspections on the main body of the building, scaffolding, construction electricity, tower cranes, material hoists, formwork support systems, rainproof shelters of various small machinery, facilities and safety signs, find problems in time, eliminate them in time, and repair the damage in time.

    2. Pay attention to the use of rain-washed materials, which can only be used after taking treatment measures, and the walls that are seriously washed by heavy rain should be demolished and rebuilt.

    3. In the event of a storm, outdoor construction operations should be stopped immediately, personnel should be evacuated to a safe place quickly, and outdoor operations should be stopped in weather above 37. At the same time, the whole construction site should decisively pull off the power supply.

    4. Strengthen the training and education of all kinds of personnel, strengthen the learning of summer safety construction and frequent travel, and improve self-prevention and emergency response capabilities.

    The above content of safe construction measures in the rainy season is collected and sorted out by Zhongda Consulting, and for more information about "safe construction measures in the rainy season" and other construction knowledge, please log in to Zhongda Consulting Industry Dynamics column to find. To inquire about the bid-winning information, business information, construction engineer under construction, honor and qualification of construction enterprises across the country, you can log in to the Zhongda Consulting Construction Pass of "One Point Construction Pass, Winning the Bid is Very Easy" or pay attention to the official WeChat of Zhongda Consulting.

  2. Anonymous users2024-02-06

    <> the details of the safety points of construction in the rainy season, Zhongda Consulting will explain to you.

    Due to the long duration of construction in the rainy season, and the suddenness of bad weather such as strong winds and heavy rain, the safety technical measures for the construction of the rainy season should be carefully prepared, and the preparations for the construction in the rainy season should be carefully prepared.

    1. Reasonably organize construction.

    According to the characteristics of construction in the rainy season, the projects that are not suitable for construction in the rainy season will be arranged in advance or postponed, and effective measures will be formulated for the projects that must be constructed in the rainy season. Pay close attention to outdoor work on sunny days, and arrange indoor work on rainy days. Pay attention to the weather forecast and be prepared for flood control.

    In case of heavy rain, fog, lightning strikes and winds above level 6, and other bad weather, operations such as open-air heights, lifting and hoisting, and piling should be stopped.

    Second, do a good job of drainage at the construction site.

    1. According to the general plan of construction and the general plan of drainage, the natural terrain is used to determine the direction of drainage, and the drainage ditch is dug according to the specified slope travel degree to ensure the smooth drainage of the construction site.

    2. In strict accordance with the requirements of flood control, continuous and smooth drainage facilities and other emergency facilities should be set up to prevent mud, sewage and wastewater from flowing out or blocking sewers and discharging into ditches.

    3. If the construction site is close to the high ground, a water interception ditch should be dug at the edge of the high ground (the upper side of the site) to prevent floods from rushing into the site.

    4. Before the rainy season, the dangerous rocks at the edge of the construction site near the mountain should be treated to prevent landslides and collapses from threatening the construction site.

    5. In the rainy season, a special person should be responsible for dredging the drainage system in time to ensure the smooth drainage of the construction site.

    3. Transport roads.

    1. For the part of the roadbed that is susceptible to erosion, water-seepage anti-skid materials such as stones, coke slag, and gravel should be paved, or culvert pipes should be set up to ensure the stability of the roadbed.

    2. In the rainy season, a special person should be designated to be responsible for repairing the road surface, and the uneven or waterlogged places of the road surface should be repaired in time.

    3. The main roads in the site should be hardened.

Related questions
9 answers2024-03-28

Seek truth from facts according to the situation on the spot.

8 answers2024-03-28

Sign up for free on the "Tiangong Network".

10 answers2024-03-28

During the construction period, the supervisors should have a comprehensive understanding of the use of building materials, and do a good job in the corresponding quality control work, through the fine management of process quality collection points to support the full control of the pile foundation inspection process, and improve the progress of construction personnel, saving time and reducing costs for enterprises. Zhijian Cloud construction safety management software provides a multi-party collaboration system for problem handling of construction enterprises from quality, safety and equipment, and all participating units can record problems as inspectors, and the rectification units repair and feedback the problems, and then the inspectors review and cancel the problems.

6 answers2024-03-28

GB 50656-2011 Construction enterprise safety production management standard status: current. >>>More

3 answers2024-03-28

Construction Safety Inspection Standards>> The summary table has a full score of 100 points. The full score of each itemized checklist in the summary table should be: >>>More