-
Generally, the instrument factory is required to be certified.
-
Does electronic scale testing require a certificate of conformity to be tested? It definitely needs to be combined, and if you don't have a certificate, it is impossible to carry out the next step of testing.
-
Generally speaking, it is true that only the certificate can be tested, because if there is no tested electronic scale, there should be a problem.
-
There is a difference, the certificate is issued by the manufacturer, which proves that the production is qualified and can be used, and the verification certificate is issued by a third-party testing agency to prove that your scale is accurate, and the state stipulates that some industries must pass the third verification, such as the factory, the electronic scale used in the settlement.
-
The business license is relatively easy to obtain, the key is what channel you sell foreign cosmetics from, and whether there are formal procedures, such as product certificates, relevant materials for imported goods, and inspection reports. When the industrial and commercial bureau handles the business license, it is a formal examination.
-
Article 46 of the Detailed Rules for the Implementation of the Metrology Law of the People's Republic of China stipulates that if the measuring instruments that belong to the scope of compulsory verification are not applied for verification in accordance with the provisions and the measuring instruments that are not within the scope of compulsory verification are not regularly verified by themselves or sent to other metrological verification institutions for regular verification, and continue to be used after being unqualified, they shall be ordered to stop using and may be fined less than 1,000 yuan.
-
First check whether the asphalt scale sensor is correctly sensed (whether the asphalt scale is completely suspended), after eliminating mechanical faults, check the electronic analog metering module, as mentioned upstairs, while increasing the weight, while using a multimeter to check whether the change in voltage and resistance is normal. Also check the voltage amplifier of the metering module, if there is a problem with the amplifier, there will also be metering increment error.
The problem added by the landlord seems to be obviously a problem with the asphalt metering amplifier, but it is not necessarily damaged, maybe it is just someone who accidentally moved it and can adjust it back. If this is the case sometimes, then it is broken and must be replaced. For example, the actual weighing is:
10kg 20kg 30kg, and the display weighing is:, that's the amplifier problem.
-
The asphalt metering scale of asphalt mixing plant is electronic digital analog metering, you check whether the output and input DC voltage of the weight converter have changed. Then measure whether the resistance of the three scales is the same, the resistance of each scale is about 380 ohms for one group, about 365 ohms for one group, and about 180 ohms for the two groups.
-
This is the function of turning on and setting zero, under normal circumstances, it is not allowed to turn on and off after putting the weight.
-
If you don't have a stamp, you can't do it.
-
The state does not have any laws and regulations that require that it must be stamped on the certificate, and the certificate is a sign of the enterprise's self-commitment to the product's qualification, so is it stamped to prove that the certificate is qualified? So how do you prove that the chapter is qualified? Why do we always try to prove that your mom is your mom?
Do foreign products have a certificate of conformity? Is there a seal on the certificate?
-
1 Of course, filing is required. No sales will be made without a record.
2. Your factory can buy a trademark printing machine.
-
Product certificate, performance test report, quality assurance certificate, imported village material commodity inspection certificate, quality certification documents of secondary processing materials (such as glass, steel galvanized). Not everything, it seems that all of them are curtain walls.
-
Strictly control the quality of incoming materials. All kinds of materials must use the qualified products specified in the contract, before the material enters the site, the supervising engineer must go to the supplier for inspection, whether it is a regular manufacturer production, whether the product is complete with three certificates (business license, product quality certificate, product quality testing certificate), in order to ensure product quality, must be sampled for testing and analysis before entering the site, where the quality indicators do not meet the requirements of the national standard and industry standards shall not enter.
One book is an instruction manual.
-
The performance test report should also be issued after entering the site, and the sample will be sent when the performance test enters the site.
-
Answer: Clearing will not cause printer failure! Clearing is to solve the problem of the number of waste ink on the printer motherboard, which you must be able to clear!
1. First prepare the rubber pad.
2. Then reset the data in the electronic scale to zero. >>>More
360 Q&A.
What are the brands of electronic scales? >>>More
It is necessary to determine whether there is a problem with the contact of the scale battery, if there is a problem with the contact, it will cause the scale to display inaccurately. When the battery of the electronic scale is out of power, there will be a prompt "lo", remember to replace the battery in time. >>>More
Electronic scale adjustment method into the city pound:
1. Electronic scale. >>>More
After powering on 6518 or 1518 or 6368, quickly press the "tare " button and half a "0" appears in the unit price window >>>More