How to clean the plastic playground and how to clean the plastic runway?

Updated on society 2024-03-25
9 answers
  1. Anonymous users2024-02-07

    The plastic playground can be evenly spread with a layer of iron sand, and it will be very clean after 2 days of cleaning.

    There are certain requirements for the shoes of track and field athletes, such as the need to wear specially equipped sneakers, and the spiked shoes are also said to be pulled on them, except that they should not be too sharp, but they should not exceed 7 mm.

    The plastic runway should be cleaned from time to time, kept clean and tidy, and the edge of the plastic runway also needs to be inspected or maintained from time to time.

  2. Anonymous users2024-02-06

    Rinse with water and laundry detergent with a high-pressure water gun.

    Decontamination is fine, but don't use corrosive.

  3. Anonymous users2024-02-05

    The plastic playground can be evenly spread with a layer of iron sand, and cleaned after 2 days, and it will be very clean. There are certain requirements for track and field athletes' shoes, such as the need to wear specially equipped sports shoes, and the spiked shoes are also said to be pulled, except for Kai Zhengxiao, which cannot be too sharp, and cannot exceed 7 mm. The plastic runway should be cleaned from time to time, kept clean and tidy, and the edge bar of the plastic pin-based runway also needs to be inspected or maintained from time to time.

  4. Anonymous users2024-02-04

    The common tools used to clean the plastic runway are: hand tools (water pipes, brushes) for manual cleaning; mops made with rotating nylon (non-metallic) brushes; high-pressure (hydro-pressurized) cleaners (with high-pressure and tank-type forehead mop equipment); Ice spray box; repair tools for synthetic materials; Draw lines and spray tools.

    Cleaning and maintenance methods of plastic runway:

    1. Manually clean with a water hose (brush), and wipe off the glue surface with a dry cloth if there is a small amount of residual water after washing;

    2. Use the mount sweeper for mechanical cleaning (choose the size according to your needs);

    3. Use a rake or recognized chemical agent to remove weeds, algae, and moss;

    4. If the plastic runway is stained with oil, it can be scrubbed with 10% ammonia or detergent, laundry detergent, etc.;

    5. Freeze with ice spray to remove chewing gum;

    6. Check whether the top layer on the site is firmly bonded to the bottom layer, and the shelling place should be fixed immediately;

    7. Implement special protection in places where spikes often run;

    8. Check all lines and logos and update them if necessary.

  5. Anonymous users2024-02-03

    It is estimated that there is something wrong with the plastic itself, otherwise it will not turn yellow. You can spray it with a similar paint! It must be cleaned and dried before spraying. Wash the runway with laundry detergent and water brushes!

  6. Anonymous users2024-02-02

    You can go to China Sports Facilities w, which has a lot of knowledge about plastic runways.

  7. Anonymous users2024-02-01

    It can only be washed with clean water, that is, flushed with a plastic water pipe, and it is better if there is a fire water gun.

  8. Anonymous users2024-01-31

    The most difficult thing to clean the plastic basketball court is the shoe print, although the raw materials of the plastic basketball court have been treated with UV mesh surface in the production process, and the cleaning supplies specially designed for the plastic basketball court to effectively remove the rubber shoe print, which can effectively help the removal of the plastic basketball court shoe print and prolong the service life, but in order to better achieve the maintenance of the basketball court, we should also pay attention to the following points:

    1. It is forbidden to wear leather shoes, and shoes with hard color and material are allowed to enter the plastic basketball court. Hard shoes will cause some damage to the plastic, and in serious cases, it will also cause scratches on the plastic basketball court, which not only affects the appearance, but also has hidden dangers to sports safety.

    2. It is forbidden to use chemicals with strong acid and alkaline properties to clean it, and the basic component of plastic flooring is PVC, which will produce certain corrosion or cause deformation of the floor when encountering strong acid, which not only destroys the normal use of the floor, but also greatly reduces the service life of the floor.

    3. Regularly scour the site. Pay attention when using water pushers and hoses:

    Do not dry push the water pusher.

    In the process of pushing water, when hard objects such as small stones are found, they should be picked out first and then pushed.

    When the rubber of the water pusher is worn to a certain extent, it should be replaced in time.

    4. When the degree of erosion in winter, it is necessary to avoid scratches and damage to the site by ice cubes.

    5. Clean or blow away the floating dust and leaves and other debris on the site every day. When using the fan, special attention should be paid to the sealing of the oil tank of the fan to prevent the oil from leaking out or dripping onto the site.

    6. If conditions permit, according to the needs of the existing plastic surface layer, a layer of oil can be paved regularly to maintain the appearance of the tennis court.

    7. If it is found that the ground layer of the field is damaged, it should be repaired with the same material in time to avoid the continuous expansion of the damaged area.

    Pay attention to the above points, in order to better protect the plastic basketball court, so that athletes can develop their skills more freely, and make greater improvements for the development of basketball in our country.

  9. Anonymous users2024-01-30

    The quality of the plastic runway itself is very good, and it is very beautiful and durable, so we must use a certain method to extend its life.

    So you need to pay attention to the following points when doing daily maintenance:

    After the construction of the plastic runway is completed, remember not to use it immediately, it is best to wait for the smell to dissipate and do the initial maintenance before using it after a week.

    The plastic runway is the most perfect all-weather track, so it has a certain drainage and suitable release function, but it should be noted that the plastic track is only for track and field athlete training and student practice, outdoor fitness sports, and cannot be used for other purposes.

    It is always necessary to keep it clean because it is necessary to avoid the dumping of harmful substances on the plastic runway, such as chemicals, and to avoid the impact and friction of some machines, such as motorcycles, cars, large objects, and sharp spiked shoes.

    There are certain requirements for track and field athletes' shoes, such as the need to wear specially equipped sports shoes, spike shoes on the top also said to pull, in addition to not too sharp, but not more than 7 mm, why, because the plastic runway is not a cement runway, not so strong, but on the contrary, the plastic runway material and PVC plastic flooring material is almost the same, no matter how high your plastic runway ** customization, can not make up for this shortcoming, otherwise it is not called a plastic runway pull, right.

    There is an upper limit to the plastic runway, and it cannot be required without reservation.

    The plastic runway should be cleaned from time to time and kept clean and tidy.

    The edge of the plastic runway also needs to be inspected or maintained from time to time.

    I hope what I've said is helpful to everyone!

Related questions
13 answers2024-03-25

It is strictly forbidden to wear high-heeled shoes, shoes with iron nails, bicycles and other vehicles on the runway, and it is strictly forbidden to throw chewing gum and carbonated drinks on the runway. >>>More

14 answers2024-03-25

The service life of the plastic runway constructed by the materials of the regular manufacturer of safety and environmental protection is more than 5 years, including 5-6 years for the breathable type, 6-8 years for the hybrid type, and 8-10 years for the full plastic type. ” >>>More

6 answers2024-03-25

For the school's plastic runway testing, it is recommended to find a professional third-party testing agency with CMA qualification certification and the ability to accept and test the plastic runway, which can be tested in strict accordance with the requirements of GB 36246-2018 synthetic material ground sports field for primary and secondary schools and GB T14833-2011 synthetic runway surface standards, and issue a CMA inspection report.

14 answers2024-03-25

Substandard plastic may cause dizziness, nosebleeds, and contains benzene, toluene, and free TDI

14 answers2024-03-25

It is purely the construction unit under the premise of 13mm standard through years of experience to obtain the most economical and practical structure. At present, there is no written basis and mandatory standard, you can use all the surface material for 13mm, but this is a lot more expensive, and it has no practical meaning, hehe.