What are the contents of the temporary facilities at the construction site

Updated on society 2024-03-09
6 answers
  1. Anonymous users2024-02-06

    1. It mainly includes on-site temporary operation sheds, machine sheds, material warehouses, offices, toilets, septic tanks, water storage tanks, temporary dormitories, cultural welfare and public utility houses and structures, processing plants, as well as temporary facilities and small temporary facilities such as roads, water, electricity, pipelines and so on within the specified range.

    2. From the perspective of project cost, temporary facility fee.

    It is a safe and civilized construction cost in the cost of construction measures.

    In the first category, the cost of temporary facilities includes: the erection, maintenance, dismantling or amortization of temporary facilities.

    In addition, the cost of safe and civilized construction also includes environmental protection fee, safe construction fee and civilized construction fee.

  2. Anonymous users2024-02-05

    <> temporary facilities. Including temporary staff dormitories, canteens, bathrooms, lounges, toilets and other temporary welfare facilities; On-site temporary offices, operation grids, material warehouses, temporary railway lines, temporary roads, temporary water supply, drainage, power supply and other pipelines, on-site prefabricated components, temporary buildings required for processing materials, ash tanks, water storage tanks, asphalt pot stoves, etc. Temporary facilities are generally dismantled after the completion of the capital works, but a few are also disposed of as handover property after the completion of the main works.

  3. Anonymous users2024-02-04

    Temporary facility expenses include: temporary facility construction costs, maintenance costs, demolition costs or amortization costs, etc. Temporary transformers, air conditioners, and cables are included in the temporary facility fee.

    Temporary facility fees include the following expenses: the cost of building temporary dormitories, the cost of cultural welfare and public utilities housing and structures, the construction of warehouses, offices, processing plants, fences, roads, water, electricity, pipelines, and the base (track) of tower cranes within the specified range (within 50 m of the edge of the building, and within 50 m of the interval between two buildings of multiple buildings). Temporary buildings refer to structures and other facilities that must be dismantled within a time limit (generally not more than two years) and have a simple structure, and also include stove bucket structures and other facilities that must be dismantled within two years (such as temporary exhibition buildings such as some pavilions of the Shanghai World Expo) that use steel, reinforced concrete, cement, brick, wood, stone and other durable materials for engineering needs.

    Before the construction of temporary buildings, the construction of temporary buildings must be approved by the planning, land, construction and other departments, and the service life is generally not more than two years. Article 66 of the Town and Country Planning Law.

  4. Anonymous users2024-02-03

    1. Scope of license collection.

    According to Article 2 of the Measures for the Administration of Construction Permits for Construction Projects: in the People's Republic of China engaged in the construction, decoration and decoration of various types of housing construction and its ancillary facilities and the installation of supporting lines, pipelines and equipment, as well as the construction of urban municipal infrastructure projects, the construction unit shall, in accordance with the provisions of these measures, apply to the people's ** construction administrative department at or above the county level where the project is located (hereinafter referred to as the issuing authority) to obtain a construction permit.

    Construction projects with an investment of less than 300,000 yuan or a construction area of less than 300 square meters may not apply for a construction permit. The people's construction administrative departments of provinces, autonomous regions and municipalities directly under the Central Government can adjust the quota according to the actual local situation, and report to the construction administrative department for the record.

    Construction projects that approve the commencement report in accordance with the authority and procedures specified in the *** will no longer receive a construction permit.

    These measures do not apply to emergency rescue and disaster relief projects, temporary construction projects, and residential projects with less than two floors (including two floors) built by farmers. The management of construction permits for military housing construction projects shall be carried out in accordance with the measures formulated by the Military Commission.

    According to the above provisions, all kinds of housing buildings and their ancillary facilities are constructed within the administrative area of Bole City, decoration and decoration and the installation of supporting lines, pipelines and equipment, as well as the construction of urban municipal infrastructure projects, with an investment of more than 300,000 yuan and a construction area of more than 300 square meters. Among them, construction projects and emergency rescue and disaster relief projects, temporary construction projects, residential projects with less than two floors (including two floors) built by farmers, and military housing construction projects that are approved in accordance with the authority and procedures stipulated in the first place, do not receive construction permits.

  5. Anonymous users2024-02-02

    Including: migrant dormitories, offices, kitchens, toilets, bathhouses, construction site processing safety protection sheds. The sales department does not count, this is the cost borne by the construction party!

  6. Anonymous users2024-02-01

    It is the building and other facilities that serve the main building (such as on-site office space, temporary accommodation, shed, processing plant, road, temporary water supply and drainage, temporary electricity, etc.), after the completion of the project, except for those that can be reused. The sales department does not count.

Related questions
9 answers2024-03-09

Multi-functional dust suppression vehicle, fog cannon machine, dry fog dust suppression device, high-pressure car washing machine, windproof dust suppression net, etc. >>>More

6 answers2024-03-09

Bored pile construction mud slurry disposal plan: construction site. >>>More

9 answers2024-03-09

If you have the right to a property or have a legal lease contract, you can apply for a business license. The Administration for Industry and Commerce does not care whether the building is temporary (5 years) or permanent (50 years). It is impossible to allow you to operate for 5 years without a business license, nor will it be that you will not be allowed to do it without a permanent building, and if you are not allowed to do it, you will not be managed and you will be allowed to operate without a license. >>>More

7 answers2024-03-09

To go through the procedures for the transfer of ownership of the house, the owner needs to obtain the property right of the house, have the real estate certificate, the deed tax certificate and the land certificate, and the housing loan is paid off without collateral. >>>More

5 answers2024-03-09

From the definition, smart construction site is the use of various smart construction site platforms developed for the management of smart construction site, through the wisdom platform integration of labor management, tower crane management, quality and safety management, progress management, material management, production management, on-site environment management, monitoring management, visual model management and project cultural content management and other project management modules of the comprehensive application. It provides a comprehensive information management integration platform for project managers, which helps project management decision-makers to fully grasp project management information, analyze and judge its information, make decisions and adjustments, and achieve the optimal management objectives. From the perspective of economic benefits, the machinery, materials and labor resources can be used more reasonably, the schedule can be optimized, the product quality and yield rate will be improved, and the construction capacity will be improved; Save production and non-production labor, reduce costs, reduce consumption, reduce production and non-production expenses, and keep the number of material reserves and products at the optimal level; From the perspective of social benefits, it can enhance the market competitiveness and social visibility of enterprises by promoting the speed of scientific and technological progress, deepening the scientific and technological awareness of all management personnel, and closely following the development trend of industry informatization.