What is the process of building a home? Approval process for self built housing procedures

Updated on Three rural 2024-04-27
9 answers
  1. Anonymous users2024-02-08

    Looking for Jiuqi Architectural Design Company, the design and construction are all inclusive, the professional team, the quality is also guaranteed, and the first is also reasonable. Just prepare the homestead, and leave the rest to Kusu Architects.

  2. Anonymous users2024-02-07

    Demonstrate the construction of self-built houses in rural areas.

  3. Anonymous users2024-02-06

    Plan the homestead.

    1. Before building a house, you should plan the orientation of the house and the functional partition of the room according to the shape and topography of the homestead you own, and mark the scope of the foundation with wedges or white lime to lay a good foundation for future construction.

    Disposal of foundations.

    A clear range of the foundation needs to be processed at the planned location of the foundation, generally about one meter deep underground, if it is in the river or in the area with loose soil, it is necessary to continue to dig deep to the hard layer.

    The foundation is compacted. Before building a house, there was a profession called tamping, which is to use machinery to tamp the foundation along the notch of the foundation, and it must be repeated several times, because there are safety hazards when the foundation is not well laid, and it is also the most important part of the foundation.

    Reinforced concrete structure.

    Now most of the houses are made of this foundation form, the reinforced concrete structure as the foundation is much more stable than the previous old house, and the construction is more convenient, all of them are large machinery to operate, do not need too much manual cooperation to save part of the cost.

    Reinforcement of ground beams. The ground beam is relative to the roof of the house before, one is at the bottom of the foundation to support the weight of the whole house, and the other is covered by the top.

  4. Anonymous users2024-02-05

    Legal Analysis: 1. Application.

    The builder submits an application for building a house, and the economy and the village agree (sign and seal).

    2. Acceptance. The village and town construction and environmental protection office shall conduct a preliminary examination of the land and the location of the house, and if the conditions are met, it shall be accepted.

    3. Review. The village and town construction and environmental protection office shall conduct on-site investigation and fixed-point investigation, and verify the basic situation of the building households and the existing housing conditions, and if the conditions for building houses and land use are met, the village and town construction and environmental protection office shall issue the plan and approve the land use.

    4. Examination and approval. The economic and social and village agree (signed and sealed), and the staff of the Construction and Environmental Protection Office shall review and fill in the form to sign the preliminary opinions. The staff of the Land Institute shall fill in the ** and submit it to the leaders of the Land Institute for signature. The leader in charge of the town people's ** will go to the party and government office to seal after reviewing and agreeing.

    Legal basis: "Land Management Law of the People's Republic of China" Article 62 A rural villager household may only own one homestead land, and the area of the homestead shall not exceed the standards prescribed by the provinces, autonomous regions and municipalities directly under the Central Government. In areas where per capita land is small and it is not possible to guarantee that a household has a homestead land, the people at the county level may, on the basis of fully respecting the wishes of rural villagers, take measures to ensure that rural villagers have a place to live in accordance with the standards set by provinces, autonomous regions, and municipalities directly under the Central Government.

    Rural villagers building houses shall conform to the overall land use plan and village plan of the township (town), shall not occupy permanent basic farmland, and shall use the original homestead land and vacant land in the village as much as possible. The preparation of township (town) land use plans and village plans shall make overall plans and reasonable arrangements for homestead land to improve the living environment and conditions of rural villagers. The residential land of rural villagers shall be reviewed and approved by the people of the township (town); Among them, where the occupation of agricultural land is involved, the examination and approval formalities shall be handled in accordance with the provisions of Article 44 of this Law.

    Rural villagers who sell, lease, or donate their dwellings and then apply for homestead land shall not be approved. The State allows rural villagers who have settled in urban areas to voluntarily withdraw from their homesteads with compensation in accordance with the law, and encourages rural collective economic organizations and their members to revitalize and utilize idle homesteads and idle residences. The competent departments of agriculture and rural affairs are responsible for the work related to the reform and management of rural homesteads nationwide.

  5. Anonymous users2024-02-04

    With the improvement of people's living standards, farmers will choose to tear down the family's old houses and rebuild them, but farmers also need to follow the relevant policies to build houses, so what is the process of self-built houses in rural areas? Next, Sakurafushi will briefly introduce it to you.

    1. According to the provisions of China's Land Management Law and other relevant documents, rural self-built houses need to legally apply for building procedures, such as applying for homestead use right certificate and rural planning permit. The homestead use right certificate is mainly used to prove whether the villagers have the right to use the homestead; The planning permit determines whether the villagers' homesteads are within the local planning scope.

    2. When handling the relevant documents, we can ask professionals to issue a detailed design drawing, and then ask the construction team to build the house according to the design drawings. When building a house, the foundation needs to be laid first. Before laying the foundation, it is necessary to conduct a survey, such as what is the depth of the groundwater level, whether there are pipelines and other ridges.

    Next, we can use excavators, pile drivers and other tools to build the foundation.

    3. After the foundation of the house is laid, the construction team can build the main body of the house according to the design drawings. For example, the production of load-bearing columns, load-bearing beams, masonry walls, the production of reinforced concrete floor slabs, stairs, and so on. After the main body of the house is built, we need to decorate the house, such as painting the exterior walls, installing water and electricity lines, laying tiles, installing doors and windows, etc.

    4. After the house is built, we also need to apply to the township government for completion acceptance. The relevant departments sent people to inspect the site, and after the house was accepted, a certificate of completion acceptance was issued, and the villagers applied to the housing management department for the real estate certificate with the certificate.

    Summary: What is the process of self-built houses in rural areas, I will briefly introduce it to you here. I hope that after reading this article, I can provide you with reference and help when building a self-built house in the future.

    Nowadays, rural housing construction standards are constantly being introduced, and we must build houses in rural areas in accordance with relevant regulations.

  6. Anonymous users2024-02-03

    The process of self-built houses in rural areas mainly includes the following steps:

    1.Determine the location and planning of the house: First of all, you need to choose a suitable location, and measure and plan, including the floor area, number of floors, room type, etc.

    2.Handle relevant procedures: You need to go to the local construction department or village committee to go through the relevant procedures, such as obtaining a land use certificate, a construction land planning permit, a construction project planning permit, etc. Dress up the wheel.

    3.Design and construction: You can invite some professional designers to design, and you can choose a qualified construction company or organize your own personnel to construct the construction.

    These are the general processes, and the specific processes may vary depending on the region and situation, so you can consult the relevant local departments or professionals for details.

  7. Anonymous users2024-02-02

    1) Conditions for rural residents to apply for homestead land.

    Rural residents applying for homestead land must meet the following conditions:

    First, rural residents must be at least 18 years old and meet the conditions for separation;

    Second, the construction of houses by rural residents must conform to the overall land use plan, the annual land use plan and the village and town construction plan;

    The third is the standard for the construction quota of rural residents, and the area standard for homestead land is: if cultivated land is used, the maximum is not more than 120 square meters; For the use of other land, the maximum shall not exceed 140 square meters, and the maximum shall not exceed 160 square meters for the use of wasteland and barren slopes in mountainous areas.

    Fourth, rural residents must build houses with "one household and one foundation";

    Fifth, rural villagers who are renting out and selling their original homestead land and then applying for homestead land will not be approved; Sixth, it is strictly forbidden for non-peasant households and other persons to purchase homestead land in the village.

    2) The principles that should be followed by peasants in building houses.

    Rural residents shall use the original homestead land and the vacant land in the village to build houses, those who can use inferior land shall not occupy good land, those who can occupy wasteland shall not occupy cultivated land, and those who use state-owned land must go through the formalities of transferring it.

    3) The examination and approval procedures for peasants' applications for building houses and homestead land are new.

    1. When rural villagers build houses, they must first apply to the collective economic organization or the urban management department;

    2. The village collective economic organization shall publicize the list of households applying for housing construction in a conspicuous place (more than 15 working days);

    3. The Land and Resources Management Institute and the Town Social Affairs Office will conduct a preliminary examination on whether the applicant meets the conditions and whether the proposed land is in line with the plan;

    4. After the expiration of the announcement period without objection, the land-using households that meet the conditions of "one household and one base" shall be reported to the township people for review and approval according to the regulations, and then submitted to the county people for approval (those who occupy agricultural land shall be reported to the city according to the regulations for the approval procedures for the conversion of agricultural land).

    5. After the homestead is approved, the Land and Resources Institute and the town social affairs office will go to the site to approve the homestead and issue the site selection opinion, planning permit and construction permit ("one book and two certificates").

    6. After the completion of the villagers' houses, the Land and Resources Institute shall inspect whether the land is used in accordance with the approved area and requirements, and issue collective land use certificates to the households that meet the requirements.

    7. Villagers apply for house ownership certificates with land use certificates and planning permits.

  8. Anonymous users2024-02-01

    Rather than buying a house in the city, many people prefer to build their own houses in the countryside to live. First, it is more economical, and secondly, the beautiful rural life can also make people relax, so self-built houses have become a favorite choice for many people. What are the steps of self-built housing, let's find out together.

    First, the detailed steps of self-built houses.

    1. The most important step before building a house is definitely to apply for a permit to build a house, and like the city, self-built houses in rural areas also need to be licensed by relevant agencies, and naturally some procedures need to be handled, otherwise it is an illegal construction, and it is also an illegal act.

    2. After all the formalities are completed, it is necessary to start the preparatory work. The first step is to pay off the line, in layman's terms, it is to measure the size of each place, do a good job in building planning, and buy good building materials.

    3. The quality of the foundation of a house is the key, so it is necessary to be very careful when laying the foundation next. When laying the foundation, you need to use some equipment, such as excavators and pile drivers.

    4. After having a solid foundation, we can plan the main body of our entire house. The main body needs to be made of reinforced concrete to create the frame of the house, and then the bricks are used to fill the wall.

    5. After the whole frame is built, decoration is also very important. Decoration is to paint the walls, install doors and windows, you can also paste tiles, and you can also add some decoration according to your preferences.

    2. Precautions for self-built houses.

    1. Before building a house, you must get a permit for self-built houses before you can carry out construction, otherwise it is an illegal construction. Not only will the house not be secured, but you will also be punished accordingly.

    2. The preparation work before building a house must be done well, such as the measurement of the ground, the planning of the entire house, and the purchase of building materials, all of which must be prepared in advance, so as not to be caught off guard at the critical moment.

    3. The foundation is the foundation of a house, and the foundation is the key to the quality of the house. Therefore, when laying the foundation, we must pay attention to the survey, including some ground beams must be very firm, which is also the foundation for the future house.

    4. When the main body is being built, it is necessary to pay attention to the position of the doors and windows, and the size should be mastered. There are also some water and electricity locations and switches, etc., which must be reserved in advance, and cannot be made after all the construction is completed, so that you will be more troublesome, and these things are not beautiful when exposed to the outside.

    Article summary: Self-built houses are also a life choice for many people now, and they can create their own paradise according to their own ideas, but they should pay attention to some details and permits when building. If you want to know more about it, please continue to pay attention to Qeeka Home.

  9. Anonymous users2024-01-31

    Feng Shui issues to pay attention to in self-built houses.

    1.There must not be a big tree in front of the door, because the big tree in front of the door not only obstructs the yang energy from entering the house, but also makes the yin energy in the house unable to come out, and it is also inconvenient for the family to enter and exit from the actual life.

    2.There must be no dead trees in front of the door, even if they are not big trees, whether they are upright or falling to the ground, they are harmful to the elderly in feng shui, and there is still the power to guide the poor, it is best to uproot them.

    3.There is a big tree in the northwest of the house that belongs to Daji, and this person who has a big tree to protect this household will bring happiness to the whole family.

    4.In reality, there are many dangers in such houses, such as fires, wind disasters, air raids, etc., and there are no conditions to shade the sun, and the yang is prosperous and the yin is declining, and the yin and yang are not in harmony with the health of the people next to the house.

Related questions
18 answers2024-04-27

Generally speaking, only those who have deposited the housing provident fund can apply for a housing provident fund loan, even if it is a rural household registration, as long as their unit pays the housing provident fund, then they can apply for a housing provident fund loan. The conditions for applying for a housing provident fund loan are: 1. The borrower must have a permanent urban residence or valid residence status in the city; 2. Push forward from the date of application, and pay the housing provident fund in full for more than 12 consecutive months (only one person is allowed to take out a loan if both husband and wife have paid the provident fund); 3. There are contracts (agreements) and related materials for purchasing, building and overhauling self-occupied houses in accordance with the law; 4. Have a certain proportion of self-raised funds. >>>More

5 answers2024-04-27

The transfer of ownership can be carried out, but it must be approved by the village committee and the county-level real estate management department, and the buyer must also be the collective, and the transfer must be announced at the location of the house. >>>More

7 answers2024-04-27

It is decided on a case-by-case basis. If the rural house is built in the middle of a house and the height is not prominent, there is no need to set up a separate direct lightning strike facility, and only need to install a lightning arrester or surge protector at the power inlet of the house to avoid lightning and high voltage along the power line into the house equipment. >>>More

9 answers2024-04-27

Self-built houses need to apply for a building permit before construction can be carried out, as follows: >>>More

8 answers2024-04-27

You don't need to thank me too much, I'm also helping you find it, hehe, you can build a house for fans. >>>More