How to do the drying rack yourself, how to install the drying rack

Updated on home 2024-04-18
7 answers
  1. Anonymous users2024-02-08

    I have a low-cost electric remote control drying rack here.

  2. Anonymous users2024-02-07

    How to install a cool hanger is as follows:1. When we install, after making holes, assemble the expansion screws with the four pulley frames respectively. Wild Goose Mountain is a very important step.

    After assembly, the two double pulley frames and the two single pulley frames are respectively installed on the hole positions.

    2. When installing, assemble the corner device and the expansion screw together. Determine where the corner is installed, the method is important. The position of the corner must be perpendicular to the position of the hand crank, at 90 degrees.

    Once the installation location is determined, the holes are marked and the assembled corner is installed.

    3. The two ends of the wire rope can not be ignored through one of the double pulley frames, and the other end is all pulled through the corner machine. The other wire rope has the same operation as the previous one, and then the buckle at one end of the wire rope shaken out by the hand crank is hung to the tail of the wire rope of the cornerer, and the other one is also operated. I put on the cap.

  3. Anonymous users2024-02-06

    The steps to install the drying rack are as follows:

    Prepare installation tools: Common tools include percussion drills, pliers, scissors, screws, screwdrivers, brackets, base plates, etc.

    Determine the installation location: Determine the installation location and height of the drying rack according to the size of the balcony where the drying rack will be installed and personal needs.

    Drilling: Use a percussion drill to drill holes on the top of the balcony or the top of the wall to ensure that the hole position is accurate and the hole size is appropriate.

    Install the top seat: Install the top seat of the drying rack on the hanger, adjust the position and fix it with screws.

    Install the drying bar: Install the drying rod of the drying rack on the top base, make sure that the distance between the drying rod and the top seat is appropriate, and fix it with screws.

    Connecting wires: Thread two wires through the bearing wire grooves of the top seat and the drying rod, and fix them with screws.

    Install the plug: install the plug at both ends of the drying rack to ensure the use effect and beauty of the drying rack.

    Adjust the position: Finally, we need to adjust the position and angle of the drying rack to ensure that it meets the ergonomic standards and can be used normally. Drying rack installation to find Luban to home.

  4. Anonymous users2024-02-05

    Luban arrives at home to introduce you to the steps of installing a drying rack, as follows:

    Prepare tools and materials: drying racks, screws, expansion tubes, electric drills, rubber hammer socks, pencils, tape measures, etc.

    Measuring distance chain separation: First, you need to measure the installation height and spacing of the drying rack, and then mark it with a pencil in the corresponding position.

    Drilling: Then, using an electric drill and drill bit, drill holes in the marked locations. When drilling, the hole should be more deep than the length of the screw so that the expansion tube can be fully extended.

    Install the expansion tube and screws: Insert the expansion tube into the pre-drilled hole and tap it fully with a rubber mace. Then screw the screws into the expansion tube until the screws are completely fixed to the drying rack.

    Install the drying rack: Finally, place the drying rack on the fixed screws and tighten the screws. If the drying rack has more than one part, you need to install all the parts in turn according to the instructions.

    It should be noted that before installing the drying rack, the wall should be checked for hardness and no cracks to ensure that the installation is firm and safe. In addition, wear goggles to protect your eyes when drilling, and be cautious when operating.

  5. Anonymous users2024-02-04

    1. Prepare electric drills, tape measures, chalk, hand cranks, handles, pulley frames, corner devices, lifting rings, fixed covers, expansion screws, wire ropes, flutes and other tools before installation;

    2. Find the installation position of the hand crank and punch holes to determine the position of the corner device;

    3. Determine the position of the 4 pulley frames;

    4. Install the expansion screw on the pulley frame;

    5. installing a hand crank;

    6. Hang the wire rope to the tail of the wire rope of the cornerer;

    7. Put the 2 long wire ropes on the double pulleys, take Li Qiao and thread them on the other 2 single pulleys, and also install the fixed cover;

    8. Finally, install the lifting rings, then put 4 lifting rings on the two ends of the two drying rod elimination keys, and then put the flute plugs on the two ends of the drying rod, and the drying rack is installed.

  6. Anonymous users2024-02-03

    1. Materials and tools: a 50cm long and 35cm wide wooden board, a 32cm long and 1cm wide wooden strip, two wire porcelain bottles with a diameter of 4cm and a diameter of 6cm, 10 iron wires, a number of colored plastic sleeves, steel nails, scissors, and wire cutters.

    2. Nail two wire porcelain bottles with a diameter of 4cm with steel nails at both ends of the wooden strip;

    3. Nail a steel nail 10 cm upwards from the midpoint of the wooden strip, and nail another steel nail to the right at 2cm upward from the steel nail;

    4. Draw a cross in the center of a 50cm long and 35cm wide wooden board, and nail the 32cm long and 1cm wide wooden strips in parallel above the distance 5cm below;

    5. Nail a wire porcelain bottle with a diameter of 6cm with a steel nail at 18 cm upward from the midpoint of the wooden strip and nail a steel nail at the lower left position of the porcelain bottle, and the hanger mold is made.

  7. Anonymous users2024-02-02

    Summary. HelloInstallation Location:

    When installing the lifting drying rack, when installing the top seat, first measure the diameter of the balcony lighting lamp with a steel ruler, and then make an installation mark between the two sides of 15-30 cm, and then measure the distance between the number and the edge of the balcony, and then determine the wide top of the top seat installation at this distance, and then take the lamp as the center, measure the length of the balcony, and then determine the two sides of the lamp according to the length of the drying rack clothes rod 80-100 cm, and then have four intersections with the measurement distance of the width. These four intersections are where the hanger top seat is mounted.

    Install a drying rack.

    HelloInstallation location: When installing the lifting drying rack, when installing the top seat, first measure the diameter of the balcony lighting lamp with a steel ruler, and then make an installation mark between the two sides of 15-30 cm, and then measure the distance between the number and the edge of the balcony, and then determine the wide top of the top seat installation at this distance, and then take the lamp as the center, measure the length of the balcony, and then determine the two sides of the lamp according to the length of the drying rack clothes rod 80-100 cm, and then have four intersections with the measurement distance of the width. These four intersections are where the hanger top seat is mounted.

    Adjust the top seat: after the position is determined, start drilling with an electric drill, and then fix the four top seats with expansion screws, which can be adjusted according to the actual length, the two top seats on the side of the corner of the swing hand are the movable end, and the other two top seats are fixed seats, the difference between the two is that it is connected with the movable seat, and the movable seat must be installed in front.

    Installation corner: The next step is to install the corner of the balcony drying rack, the corner can be installed on the top of the balcony or the top of the wall, the corner is 50-70 cm away from the movable roof, but it must be in a triangle in the middle of the movable roof, and maintain a unified vertical line with the position of the swing hand.

Related questions
14 answers2024-04-18

Electric drying rack maintenance step 1: Different brands of electric drying racks, the quality of wire rope is different. The maintenance of the wire rope is particularly important, regular lubrication can greatly reduce the friction, ensure that the lifting is very smooth, and the wear between the pulley is greatly reduced, which can greatly extend the service life of the drying rack, which is easy to do. >>>More

5 answers2024-04-18

Sundela clothes dryer uses the spirit of craftsmanship to create each product, and there are a number of product patents with good quality! >>>More

4 answers2024-04-18

Of course, it is important, a good motor can be used, for example, Luyi is electric, or a tubular motor, so it has a long life.

6 answers2024-04-18

There are many folding drying racks on the market, which are very different in terms of quality and quality, and it is recommended to choose well-known big brand products as much as possible to ensure the quality of the products. >>>More

11 answers2024-04-18

1. The hand crank gear is damaged, check that your hand crank is broken, there are two gears in the hand crank, if the gear is broken, replace the gear. >>>More