    It is enough to make waterproofing twice with waterproof mortar.

  2. Anonymous users2024-02-06

    Do you want to ask how to do waterproofing in the bathroom?

    The bathroom is waterproof, the ground needs to be done all, the wall needs to be at least meter, it is recommended to do the full height, and the waterproof material used is the same as the wall.

    The bathroom is not only small in area and has many pipes, but also more than 80% of the water leakage problems are concentrated in the yin and yang corners, pipes, sanitary ware, and floor drains, so these places need to be paid special attention to when doing waterproofing.

    The waterproof slurry is waterproof as a whole, so that the special material is dedicated, the waterproof effect is better and the life is longer.

    Of course, in addition to choosing the right waterproofing material, standard construction is also important, and only in this way can the best waterproofing effect be guaranteed.

    1. The temperature of the construction environment should be 5 35;

    2. [Permeable crystalline repair mortar] will generate a little heat during the construction process, and the waterproof slurry construction needs to be cooled down;

    3. The stirred waterproof slurry should be used up within 1 hour;

    4. It is strictly forbidden to mix this product with other preparations.

  3. Anonymous users2024-02-05

    The key to waterproofing the general family kitchen and bathroom is to do a good job of finding the slope and the yin corner of the pipe root and other details, the water can flow faster, the probability of water leakage is much less, it is best not to dry pave the floor tiles, put enough cement, do not form a water storage layer, basically solve the problem!

  4. Anonymous users2024-02-04

    100 mm of concrete should be poured in the area above the floor; The beams and floors are poured with concrete; When doing stucco, it is recommended to make a small rounded corner of r = 30 mm at the root.

    1. After the first step is completed, the gap between the floor slabs should be sealed with waterproof mortar; If the gap is larger than 20mm, it is necessary to seal it with fine concrete.

    2. There is a small slope on the toilet floor, so we should grind the surface with cement mixed mortar on the cushion less than 30mm; Conversely, cement slag is used for cushions larger than 30mm.

    3. Special attention should be paid to the construction of floor drain, the floor drain must be sealed with ointment first, and then brushed with polyurethane waterproof coating; Because the concrete crypto-hu soil sometimes has the situation of grinding and stuffing, which leads to the phenomenon of small bottom of the floor drain, it is easy to produce gaps. In order to prevent water seepage in the gaps, it is best to put a waterproof tray on the in-situ drain.

  5. Anonymous users2024-02-03

    Summary. Kiss! Hello, happy to answer your <>

    The best time to remove the original waterproof layer is in winter, the winter is cold and dry, the waterproof layer is more brittle and hard, and the construction will be more convenient. If you are worried that the shovel cannot be cleaned, you can use a grinder to heat the waterproof glue with a hair dryer, remove it with oxalic acid, and use a knife and spatula. The waterproof glue for drying in the bathroom can be heated with a hair dryer to soften the waterproof glue, and then gently wiped with a rag or rubber.

    You can also use oxalic acid on it, and then you can tear off the waterproof glue, it only takes half a minute to easily remove the waterproof glue, which can be used to remove large areas of waterproof glue Hope mine can help you <>

    Do you have any other questions?

    How to remove oily waterproofing in the bathroom.

    wall. Kiss! Hello, happy to answer your <>

    The best time to remove the original waterproof layer is in winter, the winter is cold and dry, the waterproof layer is more brittle and hard, and the construction will be more convenient. If you are worried that the shovel cannot be removed, you can use a grinding tung gas turbine to heat the waterproof glue with a hair dryer, remove it with oxalic acid, and use a knife and shovel. The waterproof glue for drying in the bathroom can be heated with a hair dryer to soften the waterproof glue, and then gently wiped with a rag or rubber.

    You can also use oxalic acid on it, and then you can tear off the waterproof glue, it only takes half a minute to easily remove the waterproof glue, and it can be used to remove a large area of waterproof glue, hope I can help you <>

    Do you have any other questions?

  6. Anonymous users2024-02-02

    1. First of all, lay the toilet floor flat. Replace the floor tiles of the bath lead wheel room. After chiseling the original floor tiles, make sure to level the ground with cement mortar and then waterproof.

    2. Brush the joint into place. The joints between the toilet wall and the floor, as well as the connections between the upper and lower water pipes and the floor, can easily go wrong.

    3. Wall treatment is also very important. In general toilet waterproofing, a waterproof coating of about 30 cm should be formed on the surface of the wall to prevent the accumulated water from spreading to the surface of the wall.

    What are the bathroom decoration procedures 1. Hydropower transformation: When decorating the bathroom, what needs to be done is the hydropower transformation, and the hydropower transformation of the bathroom includes bath bomb heating, water pipe wall treatment, etc. Before carrying out water and electricity transformation, it is necessary to consider the bathroom needs to install bathroom equipment and its installation location, and when determining the construction plan, you can reserve some sockets in case you need to add electrical appliances in the future.

    2. Waterproof treatment: waterproof treatment is one of the most important items in bathroom decoration, generally the bathroom floor should be coated with waterproof paint twice, the waterproof layer should be about 250mm higher than the ground, and then do a good job of the protective layer, after the ground waterproofing, the wall of the bathroom also needs to do a good job of waterproof engineering, the wall waterproof layer of the bathroom is best to be top, after the waterproof project is done, you must not forget to do a 24-hour closed water test.

    3. Tile pasting: because the bathroom is more humid, when choosing bathroom tiles, it is best to choose tiles with good non-slip and waterproof performance, such as tiles with concave and convex texture on the surface, and the style and pattern of tiles can be selected according to the style of the bathroom and other actual conditions.

  7. Anonymous users2024-02-01

    Steps: 1. Clean up the base layer, and the surface of the original wall and ground should be solid, and there should be no sand, ash or hollowing.

    2. Clean the root of the upper and lower water pipes and plug the leakage.

    3. Use 10-15 wide masking paper to paste the contour line according to the design and construction height of the wall.

    4. The first emulsion brushing construction, the order from top to bottom, from the inside to the old and the outside, shall not be missed.

    5. After drying, apply the second emulsion to form a complete waterproof layer of the two emulsions.

    36-hour closed water test.

  8. Anonymous users2024-01-31

    In order to prevent this from happening next time, let's talk to you about how to make the bathroom floor waterproof.

    Bathroom floors are waterproof

    It is not difficult to make the bathroom floor waterproof. The first is the base treatment, brushing; Two coats of waterproof paint, then a protective layer, and finally a closed water test, tiles. These steps must be done carefully to avoid water seepage on the restroom floor in the future.

    1. Grassroots. If you are buying a commercial house, most of the toilets have already been done, because all the sewers are in a uniform direction, which is convenient for future maintenance, and the owner cannot change the location of the toilet without authorization after purchasing. If it is the base of the self-built toilet, use cement mortar to level the floor, and it is best to make an internal drain for later use.

    2. Brush the waterproof smart model paint for the first time.

    Before brushing the first layer of waterproof coating, we must ensure that the floor is clean, and the construction is best when the weather is good, because it is necessary to fully ensure the dryness of the floor, so as to ensure the waterproof performance to the greatest extent. When applying the first layer of waterproof coating, it is necessary to pay attention not only to the proportion of the paint, but also to the coverage of the entire ground, so that cracks and bubbles do not appear.

    3. Brush the waterproof paint for the second time.

    It should be noted that before brushing the waterproof paint for the second time, it is necessary to wait for the first waterproof brush to dry thoroughly before brushing. The principle is the same as the first construction, it must be kept dry, so that the waterproof performance is stronger and the service life is longer.

    4. Lay a protective layer.

    Before carrying out other processes, in order to protect the waterproof layer, the protective layer must be laid first, and it must be closely combined with the waterproof layer. It should be noted that other processes must be carried out only after the waterproof is dry.

    5. Closed water test.

    The closed water test is an important step to test the waterproof performance, which cannot be ignored, otherwise after moving in, it will be necessary to knock off all the tiles and redo it, which will not only waste money, but also disturb daily life.

    6. Pave tiles.

    Because the waterproof layer is easy to damage, it is generally necessary to wait until the wall tiles are pasted before starting to do waterproofing.

  9. Anonymous users2024-01-30

    1. First of all, the foundation should be laid, and the wall must be waterproofed, and the wall should be waterproofed before the wall tiles are laid. In the general waterproof treatment, the wall should be waterproofed with a height of 30 cm, but for the non-load-bearing light wall, the entire wall should be waterproofed, at least 60 cm high. If you need to replace the original floor tiles in the bathroom, after chiseling off the original floor tiles, you must first level the ground with cement mortar, and then do waterproof treatment, so as to avoid leakage caused by uneven thickness of waterproof coating.

    Be sure to clean the ground before doing waterproofing.

    2. The groove of the water pipe in the wall should also be waterproof, and the waterproof layer around the hole must be carefully constructed when the pipe, floor drain, etc. pass through the floor during the construction process. Buried water pipes in the wall, so as to achieve a reasonable layout, lay water pipes are made of grooves larger than the pipe diameter, plastering in the groove is smooth, and then brush waterproof paint in the groove.

    3. The surface of the base should be smooth, and there should be no defects such as hollowing, sanding, and cracking. The moisture content of the base layer should meet the construction requirements of waterproof materials. The waterproof layer should extend from the ground to the wall, 250mm above the ground.

    The height of the waterproof layer on the bathroom wall should not be lower than 1800mm. The waterproof cement mortar screed layer is densely combined with the foundation, without hollowing, the surface is smooth and clean, no cracks, sanding, and the yin and yang angles are made into an arc. The waterproof layer of the coating film is evenly brushed, and the thickness meets the requirements of the technical regulations of the product, and the general thickness is not less than 1 5mm without revealing the bottom.

    4. Ground leveling and wall inspectionBefore doing toilet waterproofing, the floor and wall of the bathroom must be treated. If there is an uneven place on the ground, it should be leveled; If there is a hollowing phenomenon on the wall, it should be marked and then treated. Only after leveling the floor and wall can the next step of the project begin.

    5. The cleaning of the ground and wall is to carefully observe the surface and wall of the ground, and clean up if there are decoration impurities. At the same time, it is necessary to check whether there are impurities in the drainage pipes and sewer pipes, and the impurities in these places should be cleaned up. Only in this way will it not affect the waterproofing of the bathroom, nor will it cause the problem of blockage in the bathroom.

    6. After the waterproof coating of the ground and wall are treated, it is time to start the painting of the waterproof coating. When the bathroom is waterproofed, special attention should be paid to the waterproof treatment of the joints such as sewer pipes, light walls, and flues, and the waterproof function must be strengthened in these places. In addition, the waterproof height of the wall should be painted to more than 1 8 meters, so that even the shower will not cause the wall to be damp, and it will not affect the waterproof layer.

  10. Anonymous users2024-01-29

    How to clean the floor after waterproofing in the bathroom If there is a problem with the waterproof layer of the bathroom, you can use a new type of penetrating waterproofing agent, first clean the caulk of the bathroom tiles, then apply the penetrating waterproofing agent, and finally fill the tile joints with waterproof paste. Or we can re-do the waterproofing of the bathroom, and carry out a closed water test after the waterproof layer is done. If there is a leak in the bathroom water pipe, and the upper and lower water pipes are on the ground, we find the location of the leakage, and the tiles in this range are removed and replaced; Or we buy a special glue spike adhesive and apply it around the ruptured water pipe, and use the adhesive to glue the leaky water pipe together.

Related questions
16 answers2024-04-02

Bathroom leakage generally does not involve the wall, if you knock on the wall, you only need to pay attention to whether it is a load-bearing wall. However, the waterproofing of the ground should be expanded. The location of the bathroom after expansion must be waterproof!

22 answers2024-04-02

The waterproof coating is applied coldly twice, and the second scraping direction is perpendicular to the first. The perimeter of the wall extends from the ground up to a height of not less than 30 cm.

6 answers2024-04-02

The first step, before the waterproof treatment of the bathroom, the first thing is to level the floor level of the bathroom, the ground is uneven, when the waterproof paint is painted, it may be uneven, or the ground is easy to crack because of unevenness, which will crack with the ground even if the waterproof paint is applied. >>>More

5 answers2024-04-02

There is more moisture in the bathroom, so it is necessary to pay attention to the waterproof treatment during the decoration process, and the waterproof must be in place to avoid the problem of water leakage, and the later maintenance is more troublesome. Secondly, the choice of waterproof coating for the bathroom is also very important, what materials are used for waterproofing in the bathroom? It can be mainly divided into the following types: >>>More

17 answers2024-04-02

Toilet waterproofing (including closed water experiments) takes 3-5 days. >>>More