How long does it take for the bathroom to be waterproof?

Updated on home 2024-03-24
17 answers
  1. Anonymous users2024-02-07

    Toilet waterproofing (including closed water experiments) takes 3-5 days.

    Here's how:

    1. Use cement mortar on the ground to find a slope in the direction of floor drain, but the surface should be smooth. The slope near the entrance is small, and the slope near the floor drain is large.

    2. The pipeline passes through the root of the floor slab and near the floor drain to strengthen the waterproofing. The pipe root building sealing paste is tightly sealed, and the cement is smoothed after the foot guard, and when the waterproof coating is brushed, the glass wire cloth is reinforced with 1 or 2 layers.

    3. The wall is clean and flat, without floating ash and small particles, and the small original corner or slope angle is wiped at the junction of the wall and ground. When brushing waterproof coating, paste 1 2 layers of glass wire cloth reinforcement.

    4. The total thickness of the polyurethane waterproof coating film is required to be more than millimeters. It can't be decided by the number of passes. The pipe root and the corner of the reinforcing layer are brushed first, and after the surface is dried at room temperature for 4h, then a large area is brushed and scraped. There shall be no leakage and bubbling. Brush a large area for 24 hours and then apply the next layer after curing.

    6. The waterproof layer on the ground should be painted 300mm wide outside the door of the bathroom. The waterproof layer of the waterproof ground should be 200mm higher than the ground.

    7. Do a 36-hour closed water test as required.

  2. Anonymous users2024-02-06

    Directly give you a kitchen and bathroom waterproof slurry construction process, the basic process of bathroom waterproofing is like this:

    1. Chisel the root of the pipe, the periphery of the floor drain and other parts that have cracks and need to be repaired into a "V" shape, clean them, and sprinkle them with water to moisten;

    2. Add water (water-cement weight ratio 1:2 3) to the [permeable crystalline repair mortar] and mix it evenly, and carry out repair construction before the initial setting (within 5 minutes), and the root of the pipe, the perimeter of the floor drain, the yin and yang corners, and the root of the wall should be made into r angles;

    3. After the final setting of the repair mortar, stir the powder and liquid material of [durable waterproof slurry] evenly, let it stand for 3 minutes, stir it again and evenly brush it on the base surface, and it should be cross-brushed twice, and only after the first surface is dry can the second construction be carried out;

    4. Anti-stampede after completion, closed water inspection can be carried out after 48 hours.

    The whole construction process can be summed up like this: sprinkling and wetting - repairing and strengthening the key waterproof parts - painting the waterproof material as a whole - waiting until the waterproof layer is completely dry - carrying out a 48-72 hour closed water test - the closed water test is passed for the next step of the decoration process.

  3. Anonymous users2024-02-05

    The general closed water test time for waterproofing in the bathroom is 48-72 hours, which can be moderately increased or decreased according to the specific weather conditions! Hope mine can help you!

  4. Anonymous users2024-02-04

    After the bathroom is waterproofed, it is generally made.

    It takes one to two days to lay the bai bricks.

    When the anti-water is done, the waterproof material is basically dry.

    dao, after forming, to carry out a waterproof test, plug the possible leakage and floor drain, full of water, the height should not exceed the temporary fence, wait for 24 hours after the water release, check whether there is a water leakage, if there is no water leakage, let go of the stored water, you can pave the floor tiles.

    The waterproofing project of the bathroom is a place where home decoration is more prone to problems, and special attention should be paid to the "sensitive areas" in these home decorations. There are many kinds of materials used for waterproofing in the bathroom, and basically the waterproof effect is good, but pay attention to the specific construction details.

  5. Anonymous users2024-02-03

    The bathroom is done.

    To waterproof, you need to wait until the waterproof layer is completely dry before doing a 48-72 hour closed water test, and wait until there is no problem in the closed water test before you can start to apply tiles, so it takes about 5 days at the shortest.

    As for the material of the tile, now the tile is getting bigger and bigger and more difficult to stick, so it is recommended to use porcelain sticker, and then follow the following method to construct to ensure a good knotting effect:

    1. Pour the porcelain sticker powder into clean water and stir it into a paste (mixing ratio: 20kg powder 6kg water), after stirring, it needs to stand still for about 10 minutes, and then stir slightly before use, which helps to increase the adhesion force.

    2. Use a toothed scraper to apply the glue on the working surface to make it evenly distributed and form a toothed shape.

    3. Knead the tiles on the top during the drying time.

    4. After the brick laying is completed 24 hours after the shaping, the next step of the caulking process can be carried out.

  6. Anonymous users2024-02-02

    Bathroom do.

    After copying the waterproofing, it generally takes one or two days to pave the floor tiles. When the anti-bai water is done, the anti-water material is basically dry and solid, after forming, it is necessary to carry out a waterproof test, block the possible leakage and floor drain, fill the water, the height should not exceed the temporary fence, wait for 24 hours after the water release, check whether there is any water leakage, if there is no water leakage, let go of the stored water, you can pave the floor tiles.

  7. Anonymous users2024-02-01

    After the bathroom is waterproofed, it generally takes one to two days to lay the floor tiles.

    When the waterproof is done, after the waterproof material is basically dry and solid, and the shape is formed, the waterproof test should be carried out, the possible leakage and floor drain should be blocked, and the water should be filled, and the height should not exceed the temporary fence, and the water should be released for 24 hours to check whether there is any water leakage, if there is no water leakage, let go of the stored water, and you can pave the floor tiles.

  8. Anonymous users2024-01-31

    It is best to put tiles after anti-copying water as soon as a day!

    Because when the waterproofing is done, the waterproof material is basically dry and solid, after forming, the waterproof test should be carried out, the possible leakage and floor drain should be blocked, the water should be filled, the height should not exceed the temporary fence, and the water should be released for 24 hours to check whether there is any water leakage.

    In order to catch up with the construction period, the step of waterproof acceptance cannot be omitted, otherwise the water leakage will be very troublesome in the later stage.

    Lanting has more than 10 years of construction experience, Wanping's decoration exhibition hall, and a professional after-sales team. If you have doubts about the decoration, tease me

  9. Anonymous users2024-01-30

    It is not possible to directly paste bai bricks.

    1: Wait 24 hours.

    Test the water after du.

    zhi, time to test the waters.

    DAO is at least 24 hours, and the water test height is best in the water.

    It is better to be flush with the door.

    2: On the surface of the waterproof layer of the wall, a layer of net cement is smeared, and the ground can be filled with light bricks or cinders, vermiculite and other things to wipe the cement leveling.

    Wait until the cement is dry before you can start tiling.

    It is best to use flexible waterproof coatings for waterproof coatings, such as: asphalt oil, asphalt membrane and so on. The kind of cement is not good, and it is easy to crack after a while. It is recommended that you choose the products of Oriental Yuhong.

    Water Lipton easy-to-coat waterproofing slurry.

    Lipton easy-to-coat waterproof slurry is a two-component water-based waterproof slurry composed of organic liquid material composed of high-quality acrylic emulsion and a variety of additives, and an inorganic powder composed of special cement and a variety of filler materials in a certain proportion. It has the characteristics of good leveling and easy brushing.

  10. Anonymous users2024-01-29

    It depends, are you in a hurry?

  11. Anonymous users2024-01-28

    3-4 days.

    Among them, it takes about a day to tidy up the base surface of the bathroom, mix the waterproof paint and paint the waterproof paint twice, half a day to wait for the waterproof paint to dry completely, and one to two days to do the closed water test.

    Toilet waterproofing should first be treated with the base layer of the toilet to ensure that the ground is clean and dry, and then the first waterproof coating should be painted, the waterproof coating needs to be full, and the height of the waterproof coating needs to be consistent, and the thickness of the brush should also meet the specified standards.

    Toilet waterproofing practices:

    1. The surface of the base layer of the toilet sedimentation tank should be cleaned and there should be no trace of dust falling on the surface, and the surface should be smooth.

    The uneven surface of the sedimentation tank can be repaired with cement mortar, and there shall be no defects such as hollowing, sanding, and cracking.

    The first step is to do the key to waterproofing, the surface of the base layer is not clean enough, even if the subsequent process is done well, it may cause water leakage, and it will be completely abandoned. Therefore, even a trace of dust cannot be left on the surface, and it must be cleaned before proceeding to the next process.

    2. The waterproofing of the sink brush should extend from the ground to the height of the finished surface of the wall ceiling.

    When painting waterproof, it shall not be less than two times, each time the brush adopts the way of first horizontal and then vertical and then horizontal, and the first time after the brushing must wait for the waterproof to be completely transparent before the next time can be painted. The waterproof surface should be smooth and smooth, and there should be no bubbles, flowing, uneven and uneven phenomena.

    The ground uses K11 general-purpose waterproof coating, which can penetrate into the ground, can effectively resist tensile cracking, plug micro holes and cracks, and play the role of impermeability and waterproofing.

    The wall uses a flexible type, which is a flexible waterproof coating, which can form an elastic waterproof membrane after drying, which can be used for concrete, red brick, light brick base and other base surfaces.

    3. After the sedimentation tank is brushed with waterproofing, 1:3 cement mortar should be used as a waterproof protective layer.

    In case the waterproof layer is damaged. It is also strictly forbidden to destroy the waterproof layer during the construction process. Do a good job of the surface flooding slope, the drainage should be smooth, and there should be no water accumulation.

    The waterproof cement mortar leveling is densely combined with the foundation, no hollowing, the surface is smooth and clean, no cracks, hemp surface, sanding, and the yin and yang angles are made into an arc.

  12. Anonymous users2024-01-27

    The waterproofing of the toilet generally takes about 3-4 days to be done. First of all, the ground must be treated, and the ground must be leveled, because the uneven ground will cause the uneven thickness of the waterproof coating to lead to cracking and leakage. Then there is the waterproof dead end, and it should be noted during construction that the joints between the wall and the ground and the joints between the water and sewage pipes and the ground are the most likely places to cause problems.

    Finally, the closed water test, after more than 24 hours without leakage, it is waterproof success.

  13. Anonymous users2024-01-26

    It takes a total of 3-4 days to make the toilet waterproof, waterproof steps:

    1. Ground treatment.

    Before waterproofing, be sure to level the ground, if the ground is uneven, it may affect the effect of waterproofing, and may also cause cracking and leakage caused by uneven thickness of waterproof coating. Floor drains, wall corners, pipe heels and other joints should be painted with high elasticity and flexible waterproofing, because the joints between the wall and the floor of the bathroom will be displaced, and water seepage is most likely to occur.

    2. Wall treatment.

    If the bathroom has a shower room, the waterproof should be 180cm, and if there is a bathtub, the waterproof height of the wall adjacent to the bathtub should be 30cm higher than the bathtub.

    3.Waterproof dead space.

    During construction, it should be noted that the joints between the walls and the ground and the joints between the water and water pipes and the ground are the most likely to cause problems.

    4.Closed water test.

    After the completion of the waterproof construction, the closed water storage test shall be carried out, and the water at the highest point of the ground shall not be less than 2 cm, and no leakage shall be deemed qualified after more than 24 hours. After the installation of the equipment is completed, the secondary water storage test is carried out.

  14. Anonymous users2024-01-25

    Generally about 4 days. After waterproofing, it is recommended to do it after 24 hours under ventilation conditions, and of course, the water storage test is also 24 hours. Don't be sloppy, or you will suffer some sins.

    Also, if there is no problem, be careful not to let the bricks pierce the waterproof material when laying the floor tiles, which is very thin.

  15. Anonymous users2024-01-24

    In fact, there is no particularly accurate time to give you, only the approximate process and time for you to do waterproofing.

    First of all, you need to do waterproofing in the backfill pit, and then close the water test, the time of the closed water test is 48-72 hours, and then backfill leveling, and then do the waterproofing of the ground, after the ground is waterproofed, you will have to do the closed water test for 48-72 hours, and then you can do the following tiling and other processes after the closed water test is no problem, so it is at least about 5 days to add up.

  16. Anonymous users2024-01-23

    1. Cement mortar waterproof materials.

    This is a commonly used paint in the bathroom, which should be matched with cement mortar in a certain proportion, so that it can form a uniform liquid use. When batching, be sure to use a stirrer to stir, and you have to slowly add powder to mix and stir when stirring, you must fully stir and disperse, in order to achieve a uniform and no dough phenomenon, you must remember that the prepared material should be used up within 2-3 hours.

    2. Polymer polymer waterproof materials.

    This material is composed of a variety of water-based polymers, and then when you use it, you must remember to add various additives to the composition of high-quality cement, you must know that the flexibility of the polymer and the rigidity of the cement are integrated, so that it can be formed in terms of impermeability and stability. The advantages of this material are that it is easy to construct and relatively low in cost, and it is also a non-toxic and environmentally friendly product.

    3. Acrylic toilet waterproof material.

    What material is good for toilet waterproofing, acrylic waterproof coating It says that its advantages are: for example, after you finish the paint, this material will form a conjunctiva, and such a conjunctiva It also has strong elasticity and ductility, it can be said that it is also very suitable for a waterproof material for the bathroom. Moreover, this product does not have high requirements for construction, it can be constructed on a wet base layer, with high bonding strength, and it is also a green and environmentally friendly product.

  17. Anonymous users2024-01-22

    The bathroom is a relatively large place in the home that needs to be waterproofed, so let's introduce you to the relevant knowledge of bathroom waterproofing, and how many times should the bathroom floor waterproof be done What need to be paid attention to in the bathroom waterproofing.

    1. The waterproofing of the bathroom floor should be done several times.

    1. When brushing waterproof materials on the bathroom floor, you can basically do it twice, first of all, you need to clean up the ground and wall, including the pipes of the bathroom, especially the pipe mouth should be blocked first. At the same time, the dust on the wall and the ground should be removed, if the ground is uneven, it is necessary to do a leveling, and use cement mortar to block the groove at the groove of the pipeline.

    2. When everything is ready, brush the waterproof material for the first time, be sure to paint it all over, and the height of the brush is consistent. Brush the wall first, then brush the ground, according to the direction of brushing from the inside to the outside, the waterproof layer must not be stepped on.

    3. After the first part is dry, brush it for the second time, and the second time can take the direction perpendicular to the first time, so as to avoid missing coating, and then form a protective layer. When everything is dry, do a closed water test again. You can also use cement mortar to lay a protective layer on the surface of the waterproof layer, so that it will not be destroyed by the later construction.

    4. It is also possible to do a closed water experiment after that, and irrigate to a certain water level. If the water level does not drop or there is no leakage downstairs after a day, it means that the waterproofing is qualified.

    Second, what need to be paid attention to in the waterproofing of the bathroom.

    1. Before painting the waterproof coating, you need to check whether the ground meets the requirements of clean, dry, dust-free, sand-free and gravel, and then do the waterproof coating construction after confirming that there is no problem. When applying waterproof coating, it needs to be full of slurry, evenly painted, and there can be no omission or thick coating. The waterproof coating needs to be combined with a solid base surface, and there can be no cracking, bubbles, delamination, etc., and the thickness of the coating needs to be consistent to meet the construction requirements.

    2. After the waterproof construction is dry, the second waterproof coating can be painted, and the specific painting construction needs to be determined according to the waterproof coating, if the brushing interval is too short, the quality of the waterproof construction will be greatly reduced.

    3. Laying the protective layer, mainly to prevent the subsequent construction can avoid damaging the waterproof layer, it is necessary to lay a protective layer on the surface of the waterproof coating, and all the waterproof layers need to be covered when the protective layer is laid, and it is necessary to ensure that there is no omission, and it is firmly combined with the base layer.

    4. Closed water test, after the completion of construction, you need to do a closed water test, the waterproof height of the closed water test can not be less than 20 cm, the time of the test needs to be kept for more than 24 hours, and after 24 hours, check whether there is leakage on the wall and ground. If there is no leakage, it means that the waterproof construction is qualified, and if there is leakage, the waterproof construction needs to be redone.

    The above is how many times the bathroom floor waterproofing should be done, what are the all the contents of the bathroom waterproofing that need to be paid attention to, I hope it can help you understand what relevant knowledge you need to pay attention to the bathroom waterproofing, more decoration knowledge, decoration company evaluation, decoration cases, please continue to pay attention.

Related questions
16 answers2024-03-24

Bathroom leakage generally does not involve the wall, if you knock on the wall, you only need to pay attention to whether it is a load-bearing wall. However, the waterproofing of the ground should be expanded. The location of the bathroom after expansion must be waterproof!

6 answers2024-03-24

The first step, before the waterproof treatment of the bathroom, the first thing is to level the floor level of the bathroom, the ground is uneven, when the waterproof paint is painted, it may be uneven, or the ground is easy to crack because of unevenness, which will crack with the ground even if the waterproof paint is applied. >>>More

10 answers2024-03-24

The slope of the bathroom is a problem that needs to be paid attention to at the beginning, the best way is to rework, of course, it is recommended to do a little more if you can't rework now, and the following are a few treatment measures. >>>More

22 answers2024-03-24

The waterproof coating is applied coldly twice, and the second scraping direction is perpendicular to the first. The perimeter of the wall extends from the ground up to a height of not less than 30 cm.