Before the load calculation, the first thing to do is to convert the room layer to the layer approved by Hongye software, if it is an architectural drawing directly drawn by Hongye, it is better! Then you can do the following:
1. Select the default project on the left, and select the project location in the meteorological parameters in the data center;
2. Select room 1001, modify the room purpose, room area, and air conditioning heat load in the winter parameters in the basic information in the data center;
3. Select room 1001, click on the detailed load, delete all the personnel, lights, and equipment in it, and then add it yourself.
4. Point the exterior wall, select the wall, enter the area (the area of the whole wall, including the area of the window and the door), modify the orientation, and then determine if the other parameters are not changed.
5. Then select the wall, point to the outer window, select the wall inside, lose the area, the direction, point to confirm, and the window is finished.
6. Then select 1001, point the human body: the number of people, standardized, extremely light labor intensity, select the cluster coefficient, time assignment (the arrow behind the point is selected), and the point is determined.
7. For fresh air, only the time assignment will be changed.
8. The fresh air is over, and the lights and equipment are all assigned to the time.
9. The calculation result of the last point will come out of the calculated value of the load.
10. After the calculation is completed, remember to save, and when all the calculations are completed, you can output excel and word
Note: In the room list on the left, right-click to add rooms, duplicate floors, and add floors.
-
First of all, the landlord needs to make sure that the layer used in the drawings in his hand is a professional layer of Hongye architecture, that is, the so-called Hongye layer, otherwise it will prompt that there is no layer that can be extracted. Then, when calculating the load and the like, you can directly extract the room, that is, click the room with the mouse.
-
First of all, it is necessary to use HVAC load modeling, and most of the building base maps cannot be extracted directly, and it is also necessary to use the modeled tools to draw a drawing and then extract.
-
Hongye can't extract the room, I add it myself.
-
First of all, the building plan should be drawn by Hongye, otherwise it will be converted into Hongye layer.
-
Is it CAD extraction? Use the room export command.
-
Use the room manager under the version,It's very easy to use,And the batch modification and addition is extremely powerful,But CM makes both can't have both.,So for a while I'm using it.,No.,Then I finally thought of a good way.,First use the room manager to enter the envelope structure information.,And update the room information.,Then save the file.,Then open the file with it.,Turn a small corner on it.,The only annoying thing is to insert two locks.,And the load block can't be universal.,Why don't they make it universal., In fact, the load block is much easier to use than the load block, which can be seen under any CAD.
-
The type of winter heat load of the room. The heating heat load is calculated for cold air infiltration, and the fresh air is not calculated. The heat load of the air conditioner is calculated by the fresh air, and the cold air penetration is not calculated.
-
There are a number of situations to deal with:
1.Unable to extract: Hongye load calculation software provides the function of manual modeling, which can be used to establish a building model for load calculation by drawing simple models such as unjudged walls and windows.
2.Unable to identify the room: After the building base map is successfully extracted, the room cannot be recognized, mostly because the solid wall of the room is not closed.
Solid walls can be modified to form an enclosed area room, and it can be recognized normally. In addition, in the latest version, there is a room manager function, which can pull coils on the base map to select rooms, arrange load blocks, and extract solid walls, windows, etc. with unclosed surfaces.
Hongye load calculation software can directly identify Tianzheng, Swell architectural drawings. For other buildings, you can use the 2D condition map conversion to generate doors, windows, walls, axes, and columns by layer.
In the load calculation software, CAD modeling can generate a sub-household entity for multiple rooms belonging to a household, and turn the corresponding interior wall in the room entity into a sub-household hosiery wall.
Hope it helps.
-
Use the room manager under the version,It's very easy to use,And the batch modification and addition is extremely powerful,But CM makes both can't have both.,So for a while I'm using it.,No.,Then I finally thought of a good way.,First use the room manager to enter the envelope structure information.,And update the room information.,Then save the file.,Then open the file with it.,Turn a small corner on it.,The only annoying thing is to insert two locks.,And the load block can't be universal.,Why don't they make it universal., In fact, the load block is much easier to use than the load block, which can be seen under any CAD.
-
In the load calculation, there is an option in the basic parameters of the room, which can choose whether to air the room or not according to the actual situation.
-
No air-conditioning equipment is installed, and the room temperature is more than 3 different from the calculated temperature in the air-conditioned room.
1.If you want to accumulate practical experience in engineering, it is best to go to the construction company. >>>More
doi :
The effect of the opening of the door in displacement ventilation is manifested in a typical office building Zhang Lin, a, . Chowa and. Edifice. >>>More
HVAC workers, if you can't transfer to social security, it is 7000 a year, and if you ask for social security, it will take 1 year. Suspension of social security and transfer to social security are relatively high. The nickname avatar is a mobile phone number.
The difference between the fresh air unit and the air conditioning unit is one: the fresh air unit is used to deal with the fresh air, in a large building, the general fresh air unit is used in conjunction with the fan coil unit, and the fan coil unit + fresh fan is actually similar to the air conditioner. Under normal circumstances, the air conditioner itself has a fresh air outlet, which is used to ensure the quality of indoor air and supplement the indoor exhaust air. >>>More
In English, the article + time can represent the temporal adverbial, and words like the moment, the minute, the instant can also lead to the temporal adverbial clause.