How many steps does the home renovation process take?

Updated on home 2024-04-16
7 answers
  1. Anonymous users2024-02-07

    The home renovation process generally consists of the following main steps, which may be adjusted on a case-by-case basis:

    You might as well use the decoration calculator to calculate how much it will cost to decorate the house, click here: [Get local decoration in 3 seconds**].

    Just enter the area of the house + the city where it is located, and the detailed renovation cost will be listed for reference.

    1.Planning & Design Phase:

    Communicate with the owner about the needs and budget, and determine the decoration style and functional layout.

    Surveys and measurements are carried out to obtain accurate dimensions and floor plans of the house.

    Develop a renovation plan and design, including layout, material selection, and décor style.

    2.Indoor Foundation Works:

    Carry out hydropower works, including the installation of water pipes, wires, switches and sockets.

    Carry out wall treatments such as plastering, wall painting and tiling.

    Ceiling treatment, installation of suspended ceilings and lighting fixtures.

    3.Ground decoration:

    Carry out ground leveling treatment, such as leveling, grinding, etc.

    Laying and installation of floor and floor tiles is carried out.

    4.Wall decoration:

    Carry out wall treatments such as painting, wallpaper or tiling.

    installation of moldings and murals, etc.

    5.Interior Door and Window Installation:

    Install interior doors, door casings, door locks, etc.

    Install window and curtain tracks.

    6.Interior decoration:

    Installation of lighting fixtures and electrical switches, etc.

    Install decorations such as wallpaper, curtains, and floor baseboards.

    Install custom furniture such as cabinets, wardrobes, and bathroom cabinets.

    7.Kitchen and bathroom renovation:

    Install cabinets and countertops.

    Install kitchen appliances and dishwashers, etc.

    Install restroom equipment, including toilets, bathtubs, and showers.

    8.Final details work:

    Carry out cleaning and acceptance to ensure the quality and effect of the decoration.

    Installation and commissioning of air conditioning and heating equipment.

    Completion of the final finishing touches on the renovation works.

    The above is the general process of rough house decoration, and the specific decoration process will vary according to the owner's needs, budget and design scheme. Before carrying out the renovation of the rough house, it is recommended to communicate with the decoration company or renovation team in detail to develop a decoration process and schedule that suits your needs.

    As the largest decoration platform in China, Tuba Rabbit has a total of more than 41 million owners, cooperating with more than 110,000 decoration companies, covering more than 300 cities across the country, and the user reputation is very good, not only to meet your decoration needs, but also to provide local professional decoration companies according to your budget, a variety of decoration services for you to choose, you can click here to make an appointment if you have needs: [Tuba Rabbit Decoration Official Website].

    Kunming - [Kunming Decoration Strategy Guide].

    Suzhou - [Suzhou Decoration Strategy Guide].

    Hefei - [Hefei Decoration Strategy Guide].

    Fuzhou - [Fuzhou Decoration Strategy Guide].

    Beijing - [Beijing Decoration Strategy Guide].

    Dalian - [Dalian Decoration Strategy Book].

    Hangzhou - [Hangzhou Decoration Strategy Guide].

    Shanghai - [Shanghai Decoration Strategy Guide].

    Tianjin——[Tianjin Decoration Strategy Guide].

  2. Anonymous users2024-02-06

    First of all, let's understand the specific process steps of house decoration: 1. Preliminary design -- 2Main body demolition --3

    Hydropower Renovation --4Carpentry --5Tiling --6

    Painting the walls --7Water Heater Installation --8Kitchen and bathroom ceiling --9

    Cabinet Installation -- 10Smoke machine stove installation --11Wooden Door Installation --12

    Floor installation --13Paving wallpaper --14Switch socket installation --15

    Luminaire installation --16Hardware and sanitary ware installation --17Curtain rod installation --18

    Pioneer cleaning --19Furniture approach --20Appliance Installation --21

    Home accessories. Every step of the house decoration and decoration is very important, you can't be careless, you must decorate it with heart, but you find that many owners are particularly confused about the preliminary design, the main body demolition and water and electricity transformation, don't worry about it, and then look down, your problem may be solved!

    First, the preliminary design.

    1. Clarify the area involved in the decoration process. In particular, the area of tiling, wall paint, wallpaper, and flooring;

    2. Clarify the main wall size. In particular, it is necessary to design the wall size for the furniture in the future. By the way, remind everyone that before the start of construction, don't forget to go to the property to go through the construction procedures and pay the decoration deposit.

    3. The design fee includes planning, which generally accounts for 5%-20% of the entire decoration cost. The planning and design process needs to be rationally arranged, appropriately allocated funds, and not to reuse labor and materials for subsequent construction.

    Second, the main body of demolition and reform.

    Nowadays, the original design of many houses is not ideal, so the design is designed to the main transformation, mainly including wall demolition, wall masonry, shoveling wall skin, plastic replacement steel windows and so on. To put it bluntly, the main demolition and reform is to build the framework of the construction site first. Remember to be clear about which are load-bearing walls and which are non-load-bearing walls, and load-bearing walls must not be demolished.

    3. Hydropower transformation.

    Before the water circuit transformation, the main structure should be basically completed. Between the two links of hydropower renovation and main body demolition, the first measurement of the cabinet should also be carried out. In fact, the so-called cabinet is measured for the first time and there is no actual content, because the wall and floor are not treated, and the cabinet designer cannot give a specific design size, but only put forward some relevant suggestions on the location of the water outlet and range hood socket reserved by the developer.

    It mainly includes: 1. See if the position of the range hood socket affects the installation of the range hood in the future;

    2. Check whether the position of the water meter is appropriate;

    3. See if the location of the water outlet is convenient for installing the sink in the future.

  3. Anonymous users2024-02-05

    Step 1: Decorative design.

    Whether you ask a professional designer to design or design yourself, the design should serve the subsequent interior decoration. When carrying out decoration design, we need to accurately measure the size of the house, and then design the design effect we want according to the preset style and actual needs.

    Step 2: Demolition and modification.

    In fact, the real start of home renovation construction is demolition and renovation. Normally, decoration and demolition is an independent decoration process, whether our home is a new house renovation or second-hand housing renovation to carry out demolition and modification, the decoration and demolition includes the interior wall demolition and rebuilding the wall. If it is a second-hand house, it is necessary to remove wall tiles, floor tiles, etc.

    Step 3: Hydropower transformation.

    The importance and cost of hydropower renovation is increasing, including the renovation of all waterways and electrical circuits in the house. Waterway renovation refers to the installation of water supply pipes from the original water point to the new water point, and also includes the installation of indoor sewer pipes; Circuit transformation refers to the installation and arrangement of wires from the indoor distribution box to the sockets, lamps and lanterns, conduits, and wires.

    Step 4: Suspended ceiling.

    The ceiling usually refers to the light steel keel gypsum board used in our living room, that is, the shape of our indoor ceiling is roughly done with gypsum board, but at this time there is no need to scrape putty, it is recommended that the construction period node of this link is set before the construction of the bricklayer after the hydropower transformation in the decoration process.

    Step 5: Bricklayer and oilman construction.

    Home decoration bricklayer construction should first do a good job of wall tile veneer, you can first paste the kitchen or balcony wall tiles, in the process of waterproofing the bathroom, and then pave the wall tiles and floor tiles after the bathroom is waterproofed. About a week after the bricklayer is completed, the oilman can carry out the construction. The oiler first has to scrape putty on the wall and roof, and then scrape the putty from the top to the wall, and then paint the latex paint after the putty is finished.

    Step 7: Furniture installation.

    All installed furniture needs to be measured in advance so that there is no mismatch between the furniture and the interior layout. When installing, it is necessary to install wood products first, including the installation of cabinets in various areas; secondly, it is necessary to install integrated ceilings in bathrooms, kitchens and other areas; Finally, there is the installation of areas such as toilets.

  4. Anonymous users2024-02-04

    1. Preliminary design.

    The first step in decorating the house is to design, in fact, it can be carried out before the delivery of the house, of course, it should also be carried out according to the actual needs and living habits of the individual, provided that there is detailed data, then you need to measure the area of the house yourself, to put it bluntly, it is clear that the decoration area. For example: tiling, wall paint, wallpaper, furniture placement and other sizes.

    2. Demolition and modification of the main body.

    This is the first project of the new house, which is mainly carried out according to the design plan, including: knocking on the wall, shoveling the wall, removing the heating, replacing the plastic steel windows, etc.

    3. Hydropower transformation.

    After the above work is completed, the next step is the hydropower retrofit. But before the hydropower renovation, we still have a very important thing to do, and that is the first measurement of the cabinet. Although it is not possible to give a specific design size, it is only possible to make relevant suggestions on the location of the reserved water outlet and range hood socket.

    After the measurement, you can start the hydropower transformation, and it is best to make the waterproofing as well.

    4. Tiling. From the whole decoration process, tiling is a very important construction step, including the paving of wall and floor tiles, and at the same time to complete the installation of door stones and marble window sills.

    5. Carpentry. In terms of the whole renovation process, there are relatively many things to do at this stage, but it also depends on the situation of each family. Carpentry includes wardrobes, cabinets, lockers, shoe cabinets, and more.

    6. Paint. Painting is also a very important construction step in the whole decoration process. Before painting, the dust on the wall must be cleaned, and the painting process must be uniform, and after it is dry, the next step can be carried out.

    Generally, the interval between each session is more than 2-4 hours; During the period, we must pay attention to waterproof and sunscreen, so as to prevent problems with the paint film.

    7. Installation part.

    The decoration is here, and the basic decoration has been basically completed. The next step is to get into the installation. It mainly includes: cabinets, wooden doors, flooring, hardware sanitary ware and other installations.

    8. Furniture and household appliances enter the market.

    Now the renovation is in the final stages, and all kinds of items have been purchased. This is followed by cleaning, and after it is completed, it is the installation of furniture and appliances that should be installed. Remember: be sure to leave it for a few months before moving in.

  5. Anonymous users2024-02-03

    Basic knowledge engineering.

    Foundation engineering includes waterproofing, wall and floor tile paving, as well as the foundation of the ground to find equal, etc., these basic engineering parts, is a very important part of the overall home decoration steps, and the decoration can be done very well, with a professional foundation, there is a foundation guarantee, you can make the decoration effect better, but also a very important foundation in the decoration.

    Main project. To do a good job in decoration, the basic project must be guaranteed, and not to save money, to pay attention to quality. The overall design and construction of home decoration steps, the most important thing is still the main body, such as the foundation project is laid, that is, the wall, the ground, furniture and windows, etc., this general order is easy to grasp, but each step is very important.

    Decorate the target. In the process of home decoration, after the main body and foundation are laid, there is finally a decoration process. The last step of the home decoration step is to use the decoration design to brighten the point, and make the overall decoration part exquisite enough, then you can let the decoration finish and form a perfect back work, and the decoration should be placed at the end, without rushing in the morning.

    Step by step. Pay attention to the goal of decoration to perform well, we must consider before the decoration, clear goals, in the process of decoration, to ensure quality, but also to consider in accordance with strict procedures, step by step to achieve the guarantee of decoration. The three main steps of this are that there can be a good effect in the process of home decoration steps, and the effect of decoration can be better. After learning about the steps and processes of home renovation, it is guaranteed to be very good.

  6. Anonymous users2024-02-02

    First of all, the renovation steps can be roughly divided into three stages: the foundation stage, the installation stage and the end stage.

    1. Construction period: preliminary design, main demolition and decoration, water and electricity decoration, carpentry, murals, kitchen and bathroom ceilings.

    2. Installation cycle: cabinet installation, wooden door installation, floor installation, wallpaper laying, radiator installation, switch and socket installation, lamp installation, curtain rod installation, hardware installation.

    3. End period: including pioneer cleaning, furniture entry, household appliance installation, household accessories.

  7. Anonymous users2024-02-01

    Home renovation is a very complex project, so let's take a look at the process of home renovation.

    Step 1: Change water, electricity and heating, including the location and layout adjustment of kitchen and bathroom water pipes. According to the principle of ergonomics, the height and position of the water pipe often have to be changed greatly, for example, the water pipe access height of the toilet may not be the same as the reserved height.

    electricity, mainly considering the transformation of energized lines. Change the location and number of switches and sockets to make them more rational.

    warm, heated or underfloor heating. It needs to be designed in advance.

    The reason why water, electricity and heating are listed as the first step is that if the early stage is not well considered, it will lead to inconvenience in construction.

    Step 2: Floor tiles and wall tiles.

    In the first step, after the water, electricity and heating are adjusted, the floor tiles and wall tiles need to be paved.

    Step 3: House ceiling.

    Suspended ceilings for living rooms, bedrooms, study, dining rooms, kitchens, bathrooms, and balconies.

    Step 4: Wrap the door and mouth.

    The decoration of doors and windows, as well as the production of some furniture accessories, such as entrance treatment, TV background wall production, etc.

    Step 5: Painting the walls.

    Wall painting, you can use painting, wallpaper, wall covering, etc.

    Step 6: Primer topcoat.

    Priming and topcoat of doorways, windows, and parts of furniture.

    Step 7: Lighting installation.

    Install all the lamps in the room, including all kinds of ceiling lights, downlights, chandeliers, spotlights, etc.

    Step 8: Ventilation and cleaning.

    Maintain good ventilation conditions and sufficient ventilation time.

Related questions
11 answers2024-04-16

1.Pre-design.

Before decoration, it is necessary to clarify the tiling area, wallpaper area, floor area and tiling area of the house, and at the same time, measure the wall size of the furniture placed in the decoration design. >>>More

27 answers2024-04-16

Are you referring to wires or? Wires are generally set according to the location of lamps, sockets, and switches at home, mainly according to the needs of the family. The cable is slotted horizontally and vertically, and the strong and weak currents are separated and kept at a distance.

17 answers2024-04-16

A comfortable and comfortable villa house life is inseparable from the comfortable and warm decoration design, villa design and decoration is more complex than you imagined, not only involving the transformation of the building structure, but also covering the indoor and outdoor environment supporting systems, large area, more space, complex structure leads to the whole decoration process is not simple. >>>More

12 answers2024-04-16

Flame retardant materials are used for wall grooves, threading, and wiping pipes. The lower tube of the ceiling is firmly fixed with clips to ensure that it is horizontal and vertical, and the wire box is installed where there are lamps and lanterns, and the cover is buckled outside. Interior decoration must first consider fire prevention, the pipelines used must be flame retardant, and ensure that each line has a protective casing.

16 answers2024-04-16

After reading it, if you have anything to say, welcome netizens to complain, if you like to see the articles you want to see, you can also tell them, I will try my best to find them for you when I see them, and I will wait for you in the comment area below! >>>More