  1. Anonymous users2024-02-11

    The installation precautions for the color steel tile roof bracket installation system can be summarized as follows:

    Clarify the form and laying method of photovoltaic modules, as well as the roof form and structural form of the original building.

    According to the structural form of the original building, the main structural stress components are calculated to ensure the safety of the support system.

    The installation of the bracket system should take into account the problems of water accumulation and dust accumulation, as well as the impact of high temperature on power generation efficiency, and take corresponding measures to solve it.

    When building a distributed photovoltaic power station, the slope of the roof color steel tile can be used for evaluation, and it should be taken into account that the high temperature of the color steel tile in summer may affect the power generation efficiency.

    Case diagram of Kesheng color steel tile roof photovoltaic bracket.

    When installing the bracket, pay attention to the position and number of fixings to ensure the firmness of the bracket. The location and number of fixtures are determined according to the design of the bracket and carefully calculated before installation.

    Before installing the first steel plate, the fixing parts should be installed first, and then the first steel plate should be placed on the fixed fixings, and then the middle rib of the color tile should be locked with a special lock edge.

    Before installing the second plate, a line should be drawn at the bottom of the steel plate to check whether the two ends of the steel plate are in a straight line. Then the second plate is squared on the second row of fixings, and the operation method of the first plate is repeated, and the installation is carried out in turn.

    During the installation process, attention should be paid to protecting the color steel tile roof to avoid problems such as damage or water leakage. At the same time, it is necessary to pay attention to safety and avoid accidents.

    In a word, when installing the color steel tile roof bracket system, you need to pay attention to details and safety issues. The installation of the bracket system can only be guaranteed if the relevant specifications and requirements are followed.

  2. Anonymous users2024-02-10

    Stop working in stormy weather. Solar modules can get caught in the wind and make you fall.

    Never step or sit on a glass surface of a solar module. Glass can break, causing shock or bodily harm. The module can also stop generating electricity.

    Always attach the solar module bracket with parts**. Using weaker parts, such as screws that are too short, is dangerous and may result in solar modules or up and down.

    Always use the prescribed tools. Solar modules or installations may fall if the installation is not strong enough, for example when parts are not tightened enough.

    Parts will not be modified or cut. It is dangerous to do so. Security cannot be guaranteed.

    Products should be installed and maintained by personnel. Prevent unauthorized persons from staying away from the solar module.

    Point checks. Determine the on-site installation of wind loads. Please check with your local building and safety department for special requirements. Ensure that the roof structure can support the installation of photovoltaic arrays caused by live and dead loads.

    Install the solar modules facing south, if possible. It is also possible to install something, although the amount of electricity generated will be lower.

    Installation Steps. Determine the location of the roof hooks, according to your design.

    Roof hooks must not be pressed against roof tiles. Flatten it. If necessary, gasket roof hooks with wood.

    If necessary, using an angle grinder, hammer cut the concave tile to cover the point of the roof hook at which the roof hook is passed. (Warning!) Fixed roof hook ladders cannot be used, this extreme point load may damage the tile below.

    Installation of rail roof hooks. Your tracks include different lengths and always start with the shortest piece. Install the rail hook loose on the roof, using a T-Screw.

    Install the fixture. Mounting joints connect multiple rails together. Pre-assembled rails on the rear side of the sliding joint.

    Put the first bolt firmly. Then slide down the rails and splice it into. When coming together, tighten the bolts.

    The connection is complete. Widening the gap in the rail joints is proposed. Leave a notch, the width of a finger.

    Place the bottom row of the first module. The sliding end clamps the module and tie. Install the end clip in the middle clip.

    Clip mounting. Slide down the mounting module of the module. Speed up the middle clamp. Install other components and clips in this way. Even keep the module.

  3. Anonymous users2024-02-09

    Summary. Pro, the roof of the plant with color steel tile installation and fixing method:

    Pro, the roof of the plant with color steel tile installation and fixing method:

    1. Prepare the color steel structure material first, separate the two halves, press it on the roof to cover the tile ridge, and then fix it with nails.

    2. The junction of the side tiles of the house should be fixed with cement and then directly covered with the tile ridge, and the bottom should be finished with a small tile file.

    3. Then at the lower end of the tile, that is, the place where the cornice cover is installed, it should be fixed with screws.

    4. Finally, at the junction of the tile ridge, cover a layer of color steel tile, and then seal it with glass glue.

    The installation of colored steel plates is very convenient, because the material of the steel plates is relatively light, and it can be installed into a steel dismantling and searching structure travel workshop. Moreover, it can be used as a roofing and overall system, which can save construction time when installing.

  4. Anonymous users2024-02-08

    For the installation tutorial of the color steel tile roof, you can refer to the following steps.

    The first step is that after the construction of the wall of the color steel house has been completed, the bolts between the wall panel and the main frame should be connected.

    The second step is to erect the wall panel, since the draft has been completed, then the wall panel should be erected and erected, and the vertical panels on both sides should be simply fixed.

    The third step is to make a diagonal rotation of the vertical wall panels on both sides to form stability and fixation.

    The fourth step is to start on the roof of the color steel house, generally after the top of the composite board is installed, the ridge plate is treated, and the uneven places need to be simply dealt with and fixed.

    Precautions for installing color steel tiles:

    1. The advantage of color steel tile is that its weight is lighter, and the structure is exquisitely designed, and the installation is more convenient. In the process of installation, the construction personnel try not to walk around casually on the color steel tile. Unless the situation requires it, when you must walk on it, you should take protective measures in advance, and you should also pay attention not to walk along the edge of the color steel tile, which is likely to be in danger of breaking.

    2. When installing color steel tiles, the weather conditions should also be taken into account, and if the weather is more bad, do not carry out construction to avoid accidents. And it is best to hire professional construction personnel with technical qualification certificates, not only to ensure the quality of installation, but also to consider the safety of construction personnel.

  5. Anonymous users2024-02-07

    Special attention should be paid to the following points during the installation process:

    1) the purlin used for support, its top must be on the same plane, can be used according to the actual situation, use the way of beating or relaxing, adjust its position to meet this requirement, must not directly row the lower part of the fixed support to try to adjust the slope or position of the roof, the roof panel is correctly placed, can ensure its effective buckle, on the contrary, if the roof panel is not properly aligned when placed, the buckle effect of the roof panel will be affected, especially the part close to the center point of the support.

    2) In order to avoid the roof panel forming a fan or spreading out or making the lower edge of the roof uneven due to improper construction, check whether the roof panel is correct and proper at any time when placing the roof panel, and measure whether the distance from the edge of the upper and lower ends of the roof panel to the gutter is equal at any time to avoid the roof panel being oblique.

    3) Immediately after installation, remove the metal debris such as water debris, rivet rods, and waste fasteners that remain on the roof, because these metal chips will cause corrosion of the roof panel.

    Construction of accessories such as corner wrapping and flashing.

    1) The neatness of the board surface must be clean, flat, cornered, flashing and other accessories is particularly important for the appearance of the building.

    2) Use chalk lines to ensure that the attachments are straight.

    3) Use plumb lines to ensure that the attachments are vertical.

    4) Clean up the construction site frequently.

    5) Be familiar with the corners and fixed nodes of the construction drawings provided, pay attention to the specifications and spacing of self-tapping nails and rivets, and construct in strict accordance with the requirements of the drawings.

    6) Check whether all the seals are installed, and seal the places that need to be sealed.

    7) Be familiar with the description of the drawings, which is an important factor affecting the construction.

    8) Use connectors and seals correctly according to the manufacturer's guidance. , roofing, enclosure plate installation.

    The roof is made of double-layer panels, and glass wool is laid in the middle;

    a. Roofing: 1. The outer layer of the roof is an aluminum-zinc profiled steel plate made in Taiwan.

    2. The inner layer of the roof is an aluminum-zinc profiled steel plate made in Taiwan.

    3. The middle is 75mm ultra-fine thermal insulation glass wool.

    4. The node is a concealed buckle type.

    B. Enclosure: 1. The outer layer of the enclosure is an aluminum-zinc profiled steel plate made in Taiwan.

    2. The inner layer plate of the enclosure is an aluminum-zinc profiled steel plate made in Taiwan.

    3. The middle is 75mm ultra-fine thermal insulation glass wool.

    4. The node is penetrating.

    In the roofing system of insulation cotton in the double-layer profiled steel plate, the roof concealed buckle waterproof node has a good waterproof effect, and this roofing system has good heat preservation, fire prevention and sound absorption functions.

  6. Anonymous users2024-02-06

    The solar color steel tile roof installation system has great flexibility for the design and planning of commercial or residential rooftop solar systems. It is used to install common framed solar panels in parallel on pitched roofs. The unique aluminium alloy extruded rails, diagonal mounts, various clamps and a variety of roof hooks can be highly pre-assembled to make installation quick and easy, saving you labor costs and installation time.

    Customized lengths eliminate the need for on-site welding and cutting, ensuring high corrosion resistance, structural strength and aesthetics from the factory to the installation site.

Related questions
8 answers2024-05-20

You use the system disk to boot,Delete the c,d disk,Merge into a new partition,Then load the system in,Okay,Bring up the icon of my computer,Right click my computer,Manage,Disk management,Right click on the E disk,Change the driver name and path,Change the drive letter to d on it,The rest of the disks are the same。

5 answers2024-05-20

**Xingyuli cloud U disk system xylyupxt from the Internet**Installation has full functions, what can be installed, this occupies a small memory U disk can also be mass-produced into the form of optical drive, to **image files, but also**U disk detection tools and corresponding mass production tools, and then mass production of image files into U disk, the same as the optical drive when installed, just set to U disk optical drive start, set up U disk HDD boot or U disk ZIP boot when starting.

8 answers2024-05-20

One of the easiest ways is to extract the ISO and run the installer, which is how some computers can install the system. You try.

7 answers2024-05-20

First, enter the pure DOS state ......You first have to install the virtual floppy drive or dwarf DOS toolbox in your system, or you can take a Windows 98 installation CD, choose to boot from the CD, and you can enter the pure DOS. (You're now .......)) >>>More

16 answers2024-05-20

It should be a bad sector in the hard disk, and I personally feel that unless there is a big mistake in the hard disk, such as the damage of the platter, it is necessary to be cautious and low-level operation, and the damage to the hard disk is too great. It is recommended to use the XP2 disk to install and format normally, the formatting of the XP system is a format with the least damage to the hard disk (VSTAR has not been studied), install the operating system normally, and use fast FAT32 to format it once before installation and then install it directly.