It's a technical disclosure, but it's just going down from the leader and grading. In addition, the construction technology disclosure includes the technical disclosure and safety disclosure, and the technical disclosure includes the construction technology and method, technical requirements, quality requirements, safety requirements and other requirements. Safety disclosure refers to the technical safety measures that may be proposed for major risks during the installation of equipment.
It includes design disclosure, design change disclosure, construction plan disclosure, and construction organization design disclosure. 1. Generally, the hierarchical disclosure is adopted, and the first-level disclosure is presided over by the technical person in charge, and the construction leader, the technical responsible person, the quality inspector, the safety officer, and the operation team leader participate; The second-level disclosure is presided over by the person in charge of construction, and all personnel involved in the construction participate.
2. A written disclosure must be taken, including the general situation of the project, technical precautions, quality requirements, key parts and their precautions, and other matters that should be clarified or required.
3. After the disclosure is completed, all the personnel involved in the disclosure must sign in writing.
4. The method of disclosure is the same as that of holding a general meeting. Hope it helps.
-
The technical disclosure includes the following:1. The scale of the project and the content of the project contract.
2. During the construction process, there are clear provisions on safety.
3. In the construction process, the processes, cross-work, and main construction schemes involved.
4. The main arrangement of the construction content, as well as the relevant arrangements of personnel.
5. Relevant requirements and standards for project quality.
6. The arrangement of construction technology.
The content required by the design unit to disclose the bottom generally includes:1. Design intent, design characteristics and problems that should be paid attention to.
2. Design changes and related requirements.
3. The adoption of new equipment, new standards, new technologies and special requirements for construction technology.
4. Opinions on construction conditions and problems in construction.
5. Other construction precautions.
-
Answers]: a, c, e
2022 edition textbook p327
2) The main content of the technical disclosure.
The main content of the second-level disclosure is the construction plan of the sub-project project, including construction details and processing drawings; experimental parameters and mix ratio; Measuring lofting piles, measuring control networks, monitoring and measurement, etc.; blast design; specific measures for the implementation of the construction plan and methods for the implementation of the construction plan; Collaboration and precautions for cross-work; Construction quality standards and inspection methods are in accordance with the law; emergency rescue measures for major hazards; Methods and measures for the protection of finished products; Shi Cong Xi Gong precautions, etc.
Option B: Seasonal construction measures, and option D: The overall construction plan belongs to the first-level disclosure.
-
Technical disclosure and drawing review, and notify all parties of the place and time of review in advance.
There are construction units, design units, construction units, and supervision units participating in the triage.
The main thing to do in the triage is: before the triage, the technical personnel of the construction party check the drawings and write out the drawing problems. Party A's representative and supervisor can also put forward.
Submit it to the designer during the triage or before the triage for the designer to prepare. During the triage, the designer replied to this one by one. During the triage, the representatives of all parties have a routine conversation, and the triage minutes are recorded, and the triage personnel sign them.
Routine tea and fruit reception during the triage, and routine dinner banquet after the triage. After that, the design unit makes modifications or changes to the drawings, writes a reply to the review opinions, etc.
The representative of Party A shall review the drawings and put forward the opinions of Party A, and the representative of Party A shall confirm whether the requirements of the construction party for the modification and change of the drawings are reasonable, and prevent the modification requirements that may be detrimental to the interests of Party A. Usually major modifications are required, and the construction party needs to discuss with Party A's representative in advance.
There are no conditions for registering a normal company of this type. >>>More
The following three conditions are required for the second level of construction enterprises to be upgraded to one level: >>>More
Answer: There are no restrictions on age, occupation, education, region, ethnicity, nationality, school or not, etc. >>>More
First-time applicants are required to provide the following materials: corresponding academic certificates; ID card; Proof of valid business employment; 2 recent photos of myself with 1 inch and bareheaded at the same bottom; Truthfully filled in the registration form for the current year's Class II Constructor Qualification Examination; Truthfully filled in the provincial personnel examination registration information card; For some subjects exempted from the examination, intermediate and above professional and technical qualification certificates and copies of corresponding majors are required, and qualification certificates and copies of first- and second-level project managers are required.
Classification and scope.
1. Scope of practice of construction engineering. >>>More