I would like a copy of the table and order to be used by the civil engineer Rush 15

Updated on workplace 2024-05-13
12 answers
  1. Anonymous users2024-02-10

    One. Subgrade fill.

    1.Construction pay-off measurement record.

    2.Soil (stone) subgrade compaction inspection report.

    3.Subgrade excavation step quality report.

    4.Stone subgrade quality inspection report.

    5.Stratified engineering inspection form.

    Two. Soft base treatment.

    1.Ground elevation measurement table.

    2.Quality inspection report of replacement stone muck, kaishan stone and stone powder slag.

    3.Fill in the bottom elevation joint test sheet.

    4.Compaction report.

    5.Inspection forms for projects at all levels.

    Three. The top of the roadbed.

    1.Subgrade top surface measurement test table.

    2.Roadbed refurbishment quality inspection report.

    3.Subgrade rebound deflection test sheet.

    4.Engineering inspection form.

    Four. Pavement subbase, base layer.

    1.Construction survey pay-off.

    2.No side limits. Various test reports of deflection value.

    3.Raw material certificate and test report.

    5.Grassroots quality inspection report form.

    6.Engineering inspection form.

    Five. Acceptance of pavement slabs and curbs.

    1.Measurement data.

    2.Mortar specimen strength inspection report.

    3.Quality inspection reports for all kinds of prefabricated parts.

    4.Curb quality inspection report.

    5.Engineering inspection form.

    Six. Concrete pavement construction.

    1.Construction survey pay-off record.

    2.Template installation check records.

    3.Concrete mix ratio design single.

    4.Concealed acceptance records of steel bars and embedded parts.

    5.Concrete watering order.

    6.Concrete construction checklist.

    7.Raw material certificate and test report.

    8.Concrete pavement quality checklist.

    9.Engineering inspection form.

    That's all for now.

  2. Anonymous users2024-02-09

    Do you mean the table in the as-built data?

    Civil construction or industrial buildings.

    Let's talk about it in detail.

  3. Anonymous users2024-02-08

    You find a book of information in the province to fill in the specifications, which is complete in construction, construction, and supervision.

  4. Anonymous users2024-02-07

    There are too many to do, and I recommend you to read these two books.

    How to be a good data clerk. pdf (Q&A format, suitable for beginners) Technical Management Manual for Top 10 Personnel on the Construction Site Data ClerkpdfIf it is helpful to you, please adopt your post best and explain the specific needs, I will send you an email according to your needs after receiving the notification.

  5. Anonymous users2024-02-06

    The first floor and the second floor are very good, I will summarize it a little, whether it is right or not, you can decide for yourself.

    The content of the first floor, it is estimated that he will not say, you will have this information in your hands at that time, the current construction companies have, a software only, how to do it, I think you still don't know very well.

    The content of the second floor: I will explain the first content, be familiar with the process, keep up with the site situation of the construction site, and do which part is inspected which part, so the order is generally not wrong (then you will ask me how to know which one to inspect, look at my last text).

    The second article I will also explain: about building materials, you need to use the building materials used in the project, see someone deliver them, you tell the consignee, ask for product certificate, product test report. They will ask the seller for it when the time comes, and you will collect this material in time and file it.

    As for product sample delivery, this is generally the job of the sample delivery person, if you need to do it, first you go to the local building materials testing center to get a booklet, which tells you which needs to do material testing, how to do it, how much to do, what kind of size to do, how much to do a group, etc. By the way, bring a small notebook, if there is anything you don't understand, by the way, ask the staff of the testing center, they will tell you how to do it.

    Fourth, and most importantly, you need to check with the archives about what materials are needed for archiving. They will also give you a list of the materials you will eventually submit to the archives. The materials needed by the construction unit should have been handed over to them during the construction process.

    If they have a data clerk, you will connect with the data clerk.

    The rest is not your job. The visa is the business of the construction staff, and if they hand it over to you after the visa is completed, you will collect it, and it will be your business to provide it to the budget and final account personnel in time. Or you can build a visa file box and hand it over to the budget and final accounts staff at the end.

    Construction organization design and special construction plan, you generally don't get it, and these are all things that the construction staff makes, you can practice writing, but it is not your novice's responsibility. It's useless to write it out, because some plans from people who have no construction experience, do you think they can be used as a reference? Hehe.

    Finally, I'll give you a trick: you look at it, you can check the company's previous success information (archives for the record of successful information), this is of the greatest significance to your guidance, any novice who does data, the quality supervision part will give you a software, which has electronic **, you generally see, you feel that there is no direction in your heart, so how to do your own responsibility in place, I also came from this step, I just looked at the information that the predecessors had done before, and compared the current status of the project, What information should be filled, how they fill in, which words can be modified as long as they are modified, and then it will basically become clear, because the building information is the same across the country, even if it is a little different, it is estimated that the shape is different, and the content is almost the same. There are some things that you don't understand, so you need to be humble and ask the masters around you.

  6. Anonymous users2024-02-05

    There are so many things to say upstairs**, I guess you're dizzy.

    What does the civil data clerk need to do is very simple

    First, you must understand every process of building construction, especially not in the wrong order.

    Second, understand the types and varieties of materials required for buildings, focusing on the work content of engineering sampling and delivery, such as the sampling rules for steel bars, test blocks, and other materials.

    Third, be familiar with the construction blueprint and do a good job of the content of the corresponding as-built drawings of the visa form;

    Fourth, understand the content of some of the construction materials included in the local archives and the materials required by the construction party after completion.

    Fifth, prepare the corresponding construction organization design and construction special plan of the project.

    Well, if you get the above five points, you won't be wrong in the general direction of being a data clerk.

    I hope you can understand it after reading it!

  7. Anonymous users2024-02-04

    The data is divided into: quality control, technical management and quality acceptance. At present, the data is mainly processed by the data software and the data software. In addition, take a look at the acceptance specifications, all the information is based on the acceptance specifications.

    Quality Control Information (Volume A).

    Steel product certificate, factory inspection report and entry re-inspection report, steel connection test report, welding rod (agent), connector certificate, cement product certificate, factory inspection report and entry re-inspection report, brick factory certificate, test report.

    Fine aggregate test report.

    Coarse aggregate test report.

    Admixture, admixture product certificate, test report.

    Waterproof material certificate, test report.

    Component certificate and test report.

    Concrete test block test report.

    Mortar test block test report.

    Concrete trial order.

    Mortar trial matching order.

    Soil tests. Concealed engineering acceptance records.

    Adhesion and pull-out tests.

    Quality accident and accident investigation and handling data.

    Indoor environmental test report.

    Technical Management Information (Volume B).

    On-site quality management system.

    Quality responsibility system.

    Certificate of operation of major professional work.

    Subcontractor qualifications and subcontractor management system.

    Review of construction drawings.

    Geological survey data.

    Construction organization design, construction plan and approval.

    Technical standards for construction.

    Engineering quality inspection system.

    Mixing plant and metering settings.

    On-site storage and management of materials and equipment.

    Construction contracts. Construction permits, planning permits.

    Report on the commencement and completion of the project.

    Drawing review, design changes, negotiation records.

    Technical disclosure. Engineering positioning records, axis elevation review records.

    Witness sampling filing form.

    Witness sampling program.

    Retention plan for the same condition maintenance test block.

    Inspection Lot Partition Planning.

    Construction records. Construction diary.

    As-built drawing quality acceptance data (Book C).

    Pile foundation quality acceptance data.

    Quality acceptance data of deep foundation pit support.

    Foundation and foundation quality acceptance data.

    Quality acceptance data of the main structure.

    Building decoration and decoration quality acceptance data.

    Building roof quality acceptance data.

    Steel structure quality acceptance data.

    Curtain wall quality acceptance data.

    Comprehensive form of construction project quality acceptance supervision.

  8. Anonymous users2024-02-03

    For the workflow of civil engineering data clerks, it is recommended that:

    1. Collect relevant information.

    For example, national and local policies, regulations, regulations, technical standards, design documents, contracts, including relevant materials or contracts between relevant parties and their own parties. All information during the implementation of the project.

    2. Be familiar with the relevant situation.

    1. Be fully familiar with the characteristics of the proposed project.

    2. Fully familiar with the specific requirements and forms of the technical standards involved in the proposed project.

    3. Fully familiar with the approved implementation plan of the proposed project.

    4. Fully familiar with the national and local policies, regulations, regulations and other document requirements for the proposed construction project.

    3. Basis. 1. The situation and requirements of the first and second should be filled in and compiled on time for a full set of civil engineering information. and report to the person in charge to review and improve the signature and seal, and provide it to all parties who need it.

    4. Classification and consolidation, sorting and archiving.

    What information is required? Or what specific information do you want to do? This depends on the civil construction content of the project to be undertaken and the specific requirements of the local competent authority where the project is located. Recommendations:

    1. Generally, if there are regulations in various places, it should be filled in or compiled according to the specific civil engineering archival data catalog issued by the place where the project is located (generally provincial or municipal). For example, Guangdong Province has specific guidelines such as the current "Unified Table of Technical Data for Completion and Acceptance of Construction Projects in Guangdong Province" (2010 Edition) and the regulations on the filing of project acceptance, as well as specific format tables.

    2. Civil engineering data generally include: quality certification documents of the main materials of the project; Construction process quality control data (engineering quality inspection batch acceptance records, sub-division engineering quality acceptance inspection records, concealed engineering inspection and acceptance records), main engineering materials sampling test records or test reports, engineering entity function testing or safety performance inspection reports, unit project completion acceptance and filing data.

  9. Anonymous users2024-02-02

    There is an engineering data clerk workflow. pdf

    How to be a good data clerk. pdf

    The data clerk fills in the data specification tutorial. rar

    Civil Engineering Data Clerk Tutorial. doc

    JGJT 185-2009 Construction Engineering Data Management Regulations. pdfhi I explain or adopt the post best to pass it to you.

  10. Anonymous users2024-02-01

    I don't have this information, your list is very detailed, if you are engaged in this industry, it is recommended to buy a set of data software, which basically has these information.

  11. Anonymous users2024-01-31

    The things that the data clerk does in each area are not very different.,Last year there was a new version of the general book.,It is recommended that you buy a new general evaluation of the site is to be new.,The answer above is very detailed.,Generally don't use all of them.。。。

  12. Anonymous users2024-01-30

    The detailed process of the work of the building data clerk:

    1. Pre-construction information.

    2. Quality acceptance data.

    3. Test data.

    4. Materials, products, components and other certification materials.

    5. Construction process data.

    6. Information that should be supplemented if necessary.

    7. Completion information.

    8. Archive data for construction project quality supervision.

    Note: The whole set of data storage quality supervision station for curtain wall, steel structure and grid.

    The work of the construction engineering archivist is a complex professional work integrating engineering construction management and archives management knowledge, and must have certain professional knowledge of construction, archives and the ability to operate computer construction application software.

Related questions
6 answers2024-05-13

Commencement data, foundation division, main body division, roofing division, decoration division, energy-saving division, completion information, (household acceptance). >>>More

12 answers2024-05-13

Traditional snacks of Shanghai.

Sweet and light soybean milk 3 yuan Ice and salted soy milk 4 yuan Colorful pearl ice soy milk 5 yuan Fritters 3 yuan Sweet and salty rice balls 4 yuan Sweet and salty tofu flowers 4 yuan Roast cake oil bars 5 yuan Pork ribs rice cake 10 yuan Fried dumplings 3 yuan Radish shredded shortbread 3 yuan Pumpkin cake 3 yuan Crab shell yellow 4 yuan Shrimp siu mai 5 yuan Crab roe siu mai 5 yuan Beijing-style scallion pancake 4 yuan Egg cake 5 yuan Preserved egg lean pork porridge 5 yuan Fresh meat, sesame glutinous rice balls 5 yuan Wine-stuffed dumplings 5 yuan Small spring rolls 5 yuan Small wontons 5 yuan Large wontons 6 yuan Xiaolong soup bun 6 yuan. >>>More

14 answers2024-05-13

The full name is the French Republic, now the French Fifth Republic, is a highly developed capitalist country located in Western Europe, the largest country in Western Europe, now the French Fifth Republic, bordering Belgium, Luxembourg, Germany, Switzerland, Italy, Monaco, Andorra, Spain, and the United Kingdom across the English Channel. France was the second most powerful country in the world after the British Empire from the 18th century to the early 20th century, and was also one of the main victorious countries in the two world wars. France is a member of the European Union and NATO, a member of the G8 and the Schengen Convention. It is a country famous for its fashion and wine; It is also a country with elegant women and romantic feelings. >>>More

5 answers2024-05-13

Lebron James, full name: Lebron Raymone James, was born on December 30, 1984 in Akron, Ohio, USAAmerican professional basketball player, playing as a small forward, nicknamed "Little Emperor", plays for the Los Angeles Lakers in the NBA >>>More

3 answers2024-05-13

Automobile procurement bidding refers to the bidding unit in accordance with the conditions and requirements of the tender, to the tendering unit submitted to the first and fill in the tender documents. It requires that it be sealed and mailed or sent to the tendering unit, so it is also known as the bid letter. >>>More