Decoration process: 1Accept the house.
2.Order a security door.
3.Fundraising, visit the netizen sample room, make an overall plan for the entire decoration budget, style, furniture placement, etc., and determine the decoration method (half package).
4.Obtain the consent of the property or management to consult which walls cannot be hit.
5.Use a pen to record your own decoration sketches on paper, including furniture placement, electrical socket and switch arrangement, broadband cable layout, basin and faucet location, and make 5 copies to show workers at any time. And buy a few pieces of chalk or coarse colored pencils to draw marks on the wall later.
6.Find a knocker.
7.Find a kitchen cabinet master to go to the house to determine the kitchen cabinet style, measure the size, and after the set, the kitchen cabinet master will use chalk to draw the location of the socket cassette and the position of the faucet on the wall. The kitchen cabinet master goes back to make kitchen cabinets, and if he enters the site to do it, he usually has to wait until the muddy water is withdrawn.
8.Find a plumber.
9.The plumber looks at the scene, listens to his high opinions, modifies his shortcomings, and after negotiating, the plumber issues a procurement list (must ask him to indicate the specifications, what is the best origin, and the quantity should be asked to count him carefully, the gross estimate is not good, although it can be refunded and supplemented, but after all, it troubles himself. JS doesn't like to return money and can only exchange it for other materials.
The circuit of electricity should also be made clear to him at this time.
10.Purchase hydropower materials by yourself (generally buy in the three links and Jiangtou, don't buy hydropower materials in Tuofu, it is very expensive, but the best things are still OK).
11.Buy a tape measure and prepare chalk. Set the position of the socket and switch on the wall, and draw a box of the same size on the wall.
Indicate the function at the top of the box, such as "5-hole socket", "one open three eyes", "**", etc. The words can't be put in the box, and they are shoveled out as soon as they are slotted. (The tape measure should be bought with a magnet on the head, and when buying materials in the future, when the profiteer latte is mixed with stainless steel and copper, it will be accurate and tried repeatedly).
12.Plumbers enter the site, first do the circuit, then the waterway. Open the wire duct, wire through the pipe, buried in the wall. When grooving, be sure to tell him to pay attention to the level, and ask him to use a horizontal tube (or level) to hit the level, not crooked or uneven.
Plumbers seal the grooves with cement. Note that the cement sealing groove must not be higher than the original wall, otherwise the paint batch putty below will be difficult to shovel, and your wall will be uneven.
-
First, dry water and electricity, workers and you first carry out hydropower positioning, according to the positioning to buy wires (flat or 4 flat), conduits, wire boxes and network cables, ** lines, etc. Plumber worker, buy water pipe, elbow, tee, inner wire elbow, angle valve, hose, floor drain.
Second, after the completion of water and electricity, it is a bricklayer, first of all, the bathroom needs to be waterproofed, you need to buy a tarp, cement sand, waterproofing agent, first do waterproofing, and then the kitchen and bathroom tiles! If the floor outside is uneven, you also need to level the ground!
The third carpentry construction, board (if you need to paint, you need to buy veneer) do not paint to buy paint-free board, board sub-veneer and blockboard, gypsum board, 9 cl board, wood square, gypsum line, PVC ceiling, PVC gusset, hardware (such as door hinges and handles, etc.)! All kinds of nails! As for the cabinet, if you are looking for a worker to do it, it is the construction of carpentry!
-
1.Find two or three companies to measure the house, tell your renovation into the decoration ideas, let the budget and preliminary plan. 3.
Look at the scheme and **4Use the time market to inspect the decoration materials 5Identify a company, and then determine the decoration plan, negotiate the details6
Sign the contract for the renovation 7The decoration company enters, the construction of hydropower concealed projects, bricklayers, carpenters, oilers, finished product installation doors, kitchen cabinets, hardware, lamps, sanitary ware, cleaning. 8. Acceptance.
Sign the warranty!
-
Before construction, the decoration design will be carried out, and when looking for a good decoration company, there will generally be a designer to design the door, and then the contract is signed, and the contract is signed.
-
The rough room is also known as the "initial decoration room", most of such houses only have door frames and no doors, and the walls and floors are only treated with foundation without surface treatment. The decoration process refers to the process required for house decoration, including the civil engineering stage, the grassroots treatment stage, the detail treatment stage, etc. The specific decoration process of the rough room is as follows:
1. Preliminary design - 2 main body demolition and modification - 3 water and electricity renovation - 4 carpentry - 5 tiling - 6 wall paint - 7 kitchen and bathroom ceiling - 8 cabinet installation - 9 wooden door installation - 10 floor installation - 11 wallpaper - 12 radiator installation - 13 switch and socket installation - 14 lamp installation - 15 hardware and sanitary ware installation - 16 curtain rod installation - 17 pioneer cleaning - 18 furniture entry - 19 household appliances installation - 20 home accessories. I hope it helps you, I wish you a smooth renovation and a happy life.
-
1. Change the wires and waterways first. 2. Re-lay the floor 3. Do carpentry 4. Re-do wall paint.
-
Enter the area and get the decoration for free**].
After the house is bought and burned, the most troublesome thing is the decoration, so you must follow the steps in the decoration process, or it will not affect the later construction. Let's introduce to you the process of decorating a house. What is the process of decorating the house, first of all, the design of the new house - the removal of the old wall - the rebuilding of the new wall - the transformation of water and electricity - the entry of carpentry - the paving of tiles - painting - ceiling installation - cabinet installation - wooden door installation - wallpaper - the installation of switches, lamps and hardware accessories - the entry of furniture and household appliances.
What do you need to pay attention to in decoration 1, the decoration style is more determined Home decoration style, you can set according to your own preferences, then you must have a clear direction before decoration, so as to know what style of decoration you want. 2. Most of the family rooms are paved with wooden floors, so when paving, remember to leave about 2 gaps around, or it is easy to appear some people shouting empty drums, which will affect the overall aesthetics. In addition, when setting the wardrobe, the door gap should not be too small to prevent the plate from swelling and tightening in the hot summer, resulting in the phenomenon of unreal door closing.
3. Most of the living rooms and restaurants will be paved with floor tiles, in addition to the cement slurry to be adjusted when paving, we should also pay attention to its thermal insulation, and in summer, it will not be affected by the high temperature, so in winter, when the temperature drops, it will be susceptible to the wall and ground, and the strength of the cement will also be reduced. 4. Hydropower transformation needs to be cautiousHydropower transformation can be said to be a particularly important place in the home, before installation, we must check and measure whether its position is appropriate, after the transformation, the waterproof work can not be forgotten, to avoid troubles in the future. Summary:
The relevant content of what the process of decorating the house is introduced here, you can follow the above process, and there are some details that should be paid special attention to. If you want to know more about related knowledge, you can consult Qijia.com.
Calculate how much it will cost you to renovate your home
-
According to the relevant provisions of China's laws, the main process of house decoration is:
1. Find a regular and legal decoration company. Determine the specific decoration plan with the company, and explain the requirements and details in detail on both sides;
2. Divination and measurement room. The designer goes to the house that needs to be decorated to measure the size and lighting in detail, accurately measure the room, design the graphic design plan to meet the customer, and negotiate and communicate the details of the modification between the two parties;
3. Sign the contract. After the design plan and various materials for construction are determined, the contract will be signed after the two parties reach a consensus;
4. Decoration construction. After the contract is signed, each step of the decoration team is carried out in accordance with the requirements, and after the completion of the implementation, the owner needs to sign and approve the acceptance, and the next step of the process can be carried out with the hole, so as to ensure the quality of construction, and if the acceptance is unqualified, immediately rectify.
Article 2 of the Interpretation of the Supreme People's Court on Issues Concerning the Application of Law in the Trial of Cases Involving Disputes over Construction Contracts.
Where a party requests confirmation that a construction contract is invalid on the grounds that the employer has not obtained a planning permit for a construction project or other planning approval formalities, the people's court shall support it, except where the employer obtains a planning permit for the construction project and other planning approval formalities before filing a lawsuit. Where the employer is able to go through the examination and approval formalities but fails to do so, and requests confirmation of the invalidity of the construction contract on the grounds that it has not gone through the examination and approval formalities, the people's court shall not support it.
-
01 The steps of decorating the house are: design drawings, construction preparation, hydropower engineering, masonry engineering, painting, finished product installation, and soft decoration engineering. The house is the harbor where we anchor after a day's journey, it occupies an extremely important place in a family, and it is also the soul of the steps we begin to decorate the house, which directly determines the final shape of the house.
Therefore, a good upfront home design is crucial.
The steps to decorate your house are as follows:
1. Design drawings.
The design drawings of the house are the most important steps in decorating the house, so that you can know what the house is going to be, and you have a certain understanding of the overall layout and style of the house.
2. Construction preparation.
Before preparing for construction and decoration, it is necessary to confirm the relevant progress with the designer and the construction team leader and a series of work, in the process of construction, do not only pay attention to the total number of materials, but pay attention to the details of the materials, so as not to be shoddy, spend a lot of materials that are not good.
3. Hydropower engineering.
Hydropower engineering can be said to be the first step of house decoration, to carry out water, electricity, coal, exhaust pipes and other embedded work, water pipes and wires are best to choose better quality products, so as not to increase the cost of maintenance in the later stage.
4. Masonry engineering.
This step is mainly to rebuild the wall, carry out tile paving and other work, check the flatness of each wall and do waterproof testing on the bathroom and balcony, and the exterior wall of the house should be treated with multiple waterproofing treatments to avoid water seepage on the exterior wall, resulting in moldy wallpaper.
5. Carpentry engineering.
This step is mainly for the production of the ceiling of the house, various wardrobes and lockers, the material of the board must be environmentally friendly, and the size must be determined in advance when making the furniture of the wardrobe.
6. Paint. Paint is mainly putty whitewashing, latex paint, furniture painting, etc., when painting paint, pay attention to maintaining indoor humidity, so as not to cause pittings or small particles on the surface of the wall, the position to ensure the firmness of the wall, you can add a wall base film in the putty, which can prevent the wall from falling powder.
7. Finished product installation.
The main thing is to install wooden doors, floors, baseboards, sockets, etc., when installing switch sockets, do not install panels first, so as not to scratch the switch panel during wallpaper construction.
8. Soft decoration engineering.
This is the last step in the decoration of the house, let the sofa, bed and other furniture enter, these soft decoration must match the wall, floor, etc., the overall look will be beautiful and coordinated.
-
Hello! The approximate renovation process is:
1) Main body renovation and demolition(2) Hydropower renovation(3) Pipe wrapping(4) Tiling(5) Carpentry (passes, etc.)(6) Brushing oil(7) Painting wall paint or wallpaper(8) Installing socket panels(9) Kitchen and bathroom ceilings(10) Cabinets(11) Installing finished doors(12) Installing lamps, sanitary ware, bathroom hardware(13) Installing drying racks and window rails(14) Flooring(15) Radiators(16) Clearing and cleaning(17) Furniture, home appliances(18) Curtains, bedding.
There are details in this, what should we do and what should we pay attention to in each process? Search Shijiazhuang green home decoration (the first is), detailed knowledge, when I decorate, is in accordance with the map provided step by step.
-
First change the water and electricity, then do the second waterproofing, then lay the bricks, then carpentry, then painters, and finally install doors, cabinets, lamps, and finally furniture, household appliances, and finally dry for two months to live in.
You go to the building materials market to see, see more, don't blindly listen, the general specifications are very important, he determines your ** per square, to calculate yourself, with 1 point tile specifications multiplied by the unit price, (such as 300 times your 600 specifications is 1.)3รท.6 times the unit price) generally pay special attention to the waist line and flowers, some of which are almost hundreds, you can ask for only one waist line, which will be cheaper. >>>More
Diatom mud as a new generation of environmental protection wall material, in recent years by everyone's love, as far as I know, diatom mud has the function of adsorbing formaldehyde, and even some diatom mud brands also have the effect of decomposing formaldehyde and other toxic gases, the home environment is very important, which is also responsible for the health of the family. Due to the wide variety of brands of diatom mud, after many times of comparison and screening, the new generation of liquid diatom mud was finally used as the new home decoration material. Lemang is the drafting unit of China's "Diatom Mud Industry Standard", and its core patented product "Lemang Net Aldehyde Treasure" is a point that I particularly value, which can achieve efficient purification of formaldehyde, benzene, ammonia, radon, TVOC and other free harmful substances produced in decoration, and can also play a decomposition role. >>>More
The decoration company can find decoration materials to buy by themselves.
Household appliances should be determined according to their own economic strength. In addition, the budget is not only an approximate estimate of the cost of various materials, but also the budget for some decorations in the interior.