-
In accordance with the provisions of the supervision specification.
The construction stage supervision information should include the following contents:
1. Construction contract documents and entrusted supervision contracts;
2. Survey and design documents;
3. Supervision and planning;
4. Supervision implementation rules;
5. Qualification application form for package units;
6. Design disclosure and drawing review minutes;
7. Construction organization design (case) application form;
8. Resumption of work report form and project suspension order;
9. Measurement and verification data;
10. Project schedule;
11. Quality certification documents of engineering materials, components and equipment;
12. Check the test data;
13. Engineering change information;
14. Acceptance data of concealed projects;
15. Certificate of payment of project payment for project measurement sheet;
16 Supervising Engineer Notice;
17. Supervision work contact form;
18 Application Form for Inspection;
19 Minutes of the meeting;
20 correspondence;
21 Superintendent's Record;
22 Supervision monthly report;
23. Quality defect and accident handling documents;
24 projects, unit projects and other acceptance materials;
25 Claim documentation;
26. Completion settlement review opinion;
27. Special reports such as quality assessment reports in the construction stage of engineering projects;
28. Summary of supervision work.
-
I'm in a hurry to answer the elective questions.
-
The supervision plan prepared by the owner in the process of entrusting the supervision is a detailed supervision plan, including the scope of supervision, content, requirements, methods, procedures, and detailed descriptions of the responsibilities of the supervision personnel. The supervision plan is the basis of the supervision work, and is an important basis for the supervision unit to supervise the whole process of the project. The preparation of the supervision plan is of great significance for standardizing the supervision work, improving the efficiency of supervision and ensuring the quality of the project.
The preparation of the supervision program has the following purposes:
1.Standardize the supervision work to ensure the quality of the project. The supervision plan systematically plans the whole process of the supervision and leakage work, clarifies the responsibilities and supervision requirements of the supervision personnel, and provides a strong guarantee for ensuring the quality of the project.
2.Improve the efficiency of supervision. The supervision plan clarifies the methods and procedures of supervision, guides the supervision personnel to carry out supervision work, and improves the efficiency of supervision work.
3.Protect the interests of property owners. The preparation of the supervision plan fully considers the interests of the owner, ensures that the supervision personnel can comprehensively, fairly and objectively supervise the project in the supervision process, and provides a guarantee for the owner to safeguard the legitimate rights and interests.
-
Answer: "Construction Engineering Supervision Code" GB50319-2000 supervision planning.
Supervision planning procedures and basis should comply with the following provisions:
1, the supervision plan should be signed after the signing of the entrusted supervision contract and the receipt of the design documents began to prepare, after the completion of the supervision unit must be reviewed and approved by the technical person in charge of the supervision unit, and should be submitted to the construction unit before the first site meeting;
However, whether the supervision rules should be submitted to the owner, there is no provision in the construction project supervision specification, and I think the supervision rules can not be submitted to the owner. FYI.
-
Summary. Hello dear, happy to answer your <>
The owner's requirements for the supervision work: 1. Before the start of construction, the supervision party urges the construction party to submit the application for the start of construction, 2. Before the start of construction, the supervision party urges the construction party to declare the list of management personnel of the project department and the work certificate, 3. Before the start of construction, the supervision party urges the construction party to declare the mechanical equipment certificate, 4. Before the start of construction, the supervision party urges the construction party to declare the list of special types of personnel and the work permit, 5. Before the start of construction, the supervision party urges the construction party to provide the construction organization design and safety construction organization design, construction electricity safety plan, 6. The supervision party urges the construction party to provide the construction plan and the general schedule, and 7. The supervision party urges the construction party to carry out inspection and testing before the use of materials and components, including material lists, test reports, etc.
The owner's requirements for the supervision work.
Hello dear, happy to answer your <>
The owner's requirements for the supervision work: 1. Before the start of construction, the supervision party urges the construction party to submit the application for the start of construction, 2. Before the start of construction, the supervision party urges the construction party to declare the list of management personnel of the project department and the work permit, 3. Before the start of construction, the supervision party urges the construction party to declare the mechanical equipment and socks certificate, 4. Before the start of construction, the supervision party urges the construction party to declare the list of special types of personnel and the work permit, 5. Before the start of construction, the supervision party urges the construction party to provide the construction organization design and safety construction organization design, and the construction electricity safety bridge call plan, 6. The supervision party urges the construction party to provide the construction plan and the general schedule, and 7. The supervision party urges the construction party to carry out inspection and testing before the use of materials and components, including the material list, test report, lead excitation, etc.
The following is the relevant expansion content for you, I hope it will help you: supervision is a call for spring foreign words, which is not clearly defined in China's Chinese dictionaries, how to completely and accurately explain and understand its meaning, need to be further studied and **, China's construction supervision system is introduced from abroad, among them"Supervision"The term is borrowed from the name of Japan and other countries, Japan's Building Standards Law and the Architect Law both clearly stipulate the construction supervision system, where private owners must entrust qualified architects (that is, the so-called architects in our country) to serve as project supervisors, otherwise the project shall not be carried out sensitively.
-
Supervision planning is an important basis for the owner to confirm whether the supervision unit fully and conscientiously performs the project construction supervision entrustment contract.
As the entrusting party of supervision, the owner needs and has the right to understand, confirm and supervise the performance of the project construction supervision contract by the supervision unit. Supervision planning is the supervision unit whether the full performance of the supervision contract of the main explanatory documents, it fully reflects the supervision unit how to implement the owner entrusted by the supervision work, is the owner to understand, confirm and supervise the supervision unit to perform the supervision contract important information.
The basic role of supervision planning is to guide the project supervision organization to carry out the supervision work in an all-round way, its content is gradually adjusted, supplemented and improved with the progress of the project, it truly reflects the whole picture of the project supervision to a certain extent, and is a comprehensive record of the supervision process. Therefore, the supervision unit and the owner regard them as important archival information.
-
a, the supervision outline is prepared at the time of bidding, the beginning of the performance of the supervision contract, the first document is for the project and according to the content of the supervision outline to prepare the supervision specification, the owner can check its commitment to the bid according to the supervision plan.
-
Comprehensively and conscientiously perform the project construction supervision contract.
-
b. Comprehensively and conscientiously perform the supervision contract;
-
The answer is: b
Topic analysis: the role of construction project supervision and planning.
-
The owner provides the following facilities to meet the needs of the supervision work:
1) Office facilities.
2) Transportation facilities.
3) Communication facilities.
4) Living facilities.
According to the type, scale, technical complexity, and environmental conditions of the construction project, according to the agreement of the entrusted supervision contract, it is equipped with conventional testing equipment and tools to meet the needs of the supervision work.
Summary. Listening to myself in this noisy little town, the silence of the late night kept me in a peaceful bliss. The single song loops a soothing light**, listening to other people's stories, passing by other people's stories, and experiencing the stories you will have. >>>More
Female name: Xiao Xiaoxuan, Han Lin, Zhao Wushuang, Zheng Ruoxi, Chen Xi. >>>More
Blood donations are charged to others.
If you want to say that the benefits, the main thing is the hospital. But it is also beneficial for the patient, after all, if there is a shortage of blood in urgent need and there is no blood, it is bad. >>>More
The original Douyu sales text and translation notes of "The Burrow" are as follows: >>>More
Crying, making trouble, laughing, anyway, I was in a depressed mood, and I had to choose a way to counteract this emotion to deal with such a problem, I was at that time, I really wanted to cry, there was a feeling of abandonment, thinking that I should be able to carry it, but as a result, I couldn't do it. So I found a place where no one was around, and I cried out loud, and I felt really better after crying, because my mood was relaxed. Or just call my friends, not a single friend is left behind, even if I can't say two words, but at least I feel the care and understanding of my friends, I am not abandoned by this world, I still have friends and family. >>>More