First find a cooperative decoration company to measure the house, reach the intention and sign a decoration contract with the decoration company, after the start of construction, the plumber enters the site, the plumber finishes the concealed project, the bricklayer begins to enter, and the bricklayer finishes the basic things, and then enters the carpenter, and so after the carpenter and bricklayer are completed, the painter and the painter finishes the installation, and finally the plumber installs (lamps, sanitary ware, switch panels).
-
Construction process of decoration:
1. Enter, tear down the wall, build the wall.
2. Bathroom, kitchen floor for 24-hour closed water test (the developer needs to complete this task).
3. Drill the trunking, hydropower transformation and acceptance.
4. Concealed hydropower renovation project of buried trunking, and waterproof engineering began to be done without leakage in the closed water experiment.
5. Bathroom, kitchen wall magnets, floor tiles, solid wood or composite wood flooring, waterproof marble strips, baseboards (pay attention to protect the floor after this step).
6. Carpentry entry, hanging ceiling, gypsum corners.
7. Cover the door and the window. Make a wooden cabinet frame.
8. Synchronous production of various wooden doors, modeling doors and flat pressing.
9. The wooden panel is brushed with dustproof paint (clear oil).
10. The window sill marble countertop is leveled and laid.
11. Wood veneer paste, line production and fine installation.
12. Wall base treatment, grinding and leveling.
13, household goods, stickers (protective edges) are pasted at the seams of the door.
14. The wall oil ici is at least three times.
15. Furniture paint into the field, nail holes, paint.
16. Deal with the corners.
17. Installation and debugging of lamps, sanitary ware, handles, and door locks.
18. Clean up and sanitize, repair the floor tiles, and withdraw from the site.
19. Preliminary acceptance within the decoration company.
-
Brothers......**Yes, if I can introduce you to a few private renovation teams in Wuhan, it is not bad ......
-
The content comes from the user: Miao Miao.
1.Pre-design --2Main body demolition --3
Hydropower Renovation --4Carpentry --5Tiling --6
Painting the walls --7Kitchen and bathroom ceiling --8Cabinet installation --9
Wooden Door Installation --10Floor installation --11Paving wallpaper --12
Radiator installation --13Switch socket installation --14Luminaire installation --15
Hardware sanitary ware installation --16Curtain rod installation --17Pioneer cleaning --18
Furniture Approach --19Appliance Installation --20Home Accessories -
The renovation is roughly done in accordance with these 20 steps. Below, I will do my best to explain in as much detail as possible what I know about the renovation process and the many details that need to be paid attention to throughout ......the process
1. Analysis of 20 links in the whole process of decoration.
1) Preliminary design.
The difference between humans and bees is that the construction of bees is a reflection of instinct, and before people build, ideas and frameworks are first formed in their minds. Therefore, if home improvement is compared to a battle, then the early design of home improvement is the "battle plan" of this battle and the "soul link" of home improvement. Therefore, in the last part of "Made by Tang Liang", the whole article is about the problems that need to be paid attention to in the early design, so I will not repeat it here.
In the early stage of design, students must also do one thing, that is, to make a detailed measurement of their room, don't be lazy, it is best to measure it yourself, the content of the measurement mainly includes:
1. Clarify the area involved in the decoration process. In particular, the area of tiling, wall paint, wallpaper, and flooring;
2. Clarify the main wall size. In particular, it is necessary to design the wall size for the furniture in the future.
-
Preparation for commencement of construction: property registration matters |Reference |Renovation schedule |Material acceptance Demolition and modification Concealed engineering structure demolition and modification |Load-bearing wall renovation |Hydropower Renovation |Waterway construction |Circuit Construction |Strong and weak current construction switch socket purchase |Floor base construction |Parapet base construction |Door and window cover installation |Ceiling base construction carpentry engineering: carpentry construction process |Plate |Keel |Top corner baseboard |Drywall |Adhesive glue |Glass |Gusset |Mid-term acceptance of doors and windows:
Mid-term acceptance content |Mid-term Acceptance Criteria |Acceptance of concealed works |Carpentry acceptance Masonry engineering: masonry construction process |Ground waterproofing |Ground leveling |Tile paving|Stone paving |Masonry Engineering Acceptance Paint Engineering Coatings Paint Construction Technology and Process |Acceptance of painting project hard finishing project wallpaper wallpaper |Flooring |Fixture installation |Luminaire Installation |Hardware purchase and installation supervision acceptance: decoration supervision process |Completion Acceptance |Accounting for decoration |Home Improvement Warranty Service |Contamination detection.
-
1.Business negotiation: (1) Explanation of the design operation process; (2) Discussion of basic customer requirements; (3) Proposal of charging methods.
2.Signing of the commissioned design contract (preliminary discussion): 1) Conduct field measurement records. (2) Draw the preliminary plan of the plane and the top surface. (3) Communication and finalization of the preliminary design plan.
3.A full set of scheme design (in-depth discussion): 1) Draw design details; (2) Communication and finalization of design drawings; (3) Prepare a budget.
4.Budget and materials finalization (detailed discussion): 1) Discussion on the applicability of building materials; (2) Confirmation of project budget; (3) Preparation of building materials table.
5.Sign the project contract: (1) Sign the formal contract; (2) Drawings are transmitted to the engineering department for the record; (3) Material preparation.
6.Preparation for entering the site: (1) Inspect the living room, test the flatness of the wall, ground and roof, and the smooth flow of water supply and drainage pipelines, electricity and gas, and make a record and deliver it to the owner (**person) for signature and approval.
2) Material preparation, list of materials, and coordinate with the material preparation department. (3) Personnel scheduling, determine the construction personnel, and clarify the person in charge of the construction site.
7.Start work on time: (1) Start work on the date determined in the contract; (2) On-site guidance of designers, constructors, and hydropower specialists.
8.Construction in progress: (1) Material distribution site; (2) Construction in strict accordance with the drawings; (3) Constructor supervision and acceptance; (4) Designer on-site coordination.
9.Completion of the general acceptance: (1) The decorated room by room is cleaned and cleaned item by item; (2) Acceptance according to the relevant acceptance standards (if rectification is required, then inspection); 3) According to the actual amount of decoration and decoration work for the total settlement, 10After-sales service: (1) Issue a decoration warranty. Provide pipeline circuit diagrams, equipment and product warranty cards. (2) Set up home decoration project files, and arrange regular contact visits to users.
Trust me, the answer will be yes
The negotiation owner finds a suitable decoration company, tells the other party the requirements, and then listens to the other party's opinions for effective communication and negotiation. >>>More
1.Determine the decoration style and layout, that is, find a decoration company to do a good job of interior layout planning. >>>More
1. The design of industrial standard plant must implement the relevant national guidelines and policies, so as to be technologically advanced, economically reasonable, safe and applicable, ensure quality, and meet the requirements of energy conservation and environmental protection. >>>More
The home renovation process generally consists of the following main steps, which may be adjusted on a case-by-case basis: >>>More