What are the steps and processes for renovating a new house? What are the steps of a new house renov

Updated on home 2024-03-24
10 answers
  1. Anonymous users2024-02-07

    1.Determine the decoration style and layout, that is, find a decoration company to do a good job of interior layout planning.

    2.The wall is demolished and modified, and the wall is demolished and built according to the design drawing, and the indoor area is preliminarily divided.

    3.Hydropower transformation, according to indoor water, electricity and other wiring, slotted buried pipes.

    4.Waterproof measures require leveling and waterproof construction of kitchen and bathroom walls and floors.

    5.Tiles, kitchens, bathrooms and balconies and other walls and floors, living room and dining room floors.

  2. Anonymous users2024-02-06

    Main body demolition and reconstruction, water and electricity transformation, riser package, bricklayer tiling, oiler wall paint, door, cabinet, kitchen and bathroom ceiling installation, floor installation. [To decorate, find Hujia].

    1. Demolition and alteration of the main body.

    The first project of new house decoration is the main body demolition and renovation, including wall demolition, wall masonry, shoveling wall skin, plastic steel door and window replacement, etc.

    2. Hydropower transformation.

    Hydropower renovation is a very important project in the renovation of new houses, which affects the safety of our lives. Problems found during hydropower construction should be solved in time to avoid potential safety hazards in the future and bring unnecessary trouble to yourself.

    3. Wrapping riser.

    Use decorative materials to package the sewer pipes, which are generally only available in kitchens and bathrooms, which can increase the aesthetics and sound insulation.

    4. Bricklayer tiling.

    Tile paving is mainly for living rooms, kitchens, balconies, toilets, etc., which is an important construction process of masonry, and we must be meticulous.

    5. Oilers brush wall paint.

    When the wall paint is constructed, it is necessary to carry out the construction in accordance with the painting process standards, otherwise the surface is prone to bulging, falling off, cracking and other phenomena.

    6. Doors, cabinets, kitchen and bathroom ceiling installation.

    Decoration companies generally install the ceiling first, and then install the cabinets and doors after the ceiling installation is completed.

    7. Floor installation.

    The floor can be installed on the second day after the installation of the wooden door, and the floor should be installed to ensure that the ground is dry, and the garbage should be cleaned up to avoid unevenness.

    Decoration is looking for Hujia decoration. Hujia adheres to the tenet of customer satisfaction and the brand reputation as the guide; Based on outstanding talents, based on green home decoration; With excellent project quality as the guarantee and honest service as the basis, we will create a high-quality living environment for the decoration owners. )

  3. Anonymous users2024-02-05

    1. Demolition and alteration of the main body.

    2. Hydropower transformation.

    3. Wrapping riser.

    4. Bricklayer tiling.

    5. Oilers brush wall paint.

    6. Doors, cabinets, kitchen and bathroom ceiling installation.

    7. Floor installation.

    8. Install the switch socket.

    9. Installation of lamps and hardware sanitary ware.

    10. Curtain rod installation.

    11. Clearing and cleaning.

  4. Anonymous users2024-02-04

    1. Basic decoration.

    The basic decoration is also hard decoration, and the soft decoration design should be completed on the basis of hard decoration. Hydropower engineering, waterproofing engineering, ground leveling, wall and floor tile laying are these processes are very important parts of basic decoration. Once there is something wrong in a certain link, it will directly affect the comfort of staying in the future.

    2. The main part of the decoration.

    Once the foundation is complete, the next step, which is also very crucial, can be implemented. The installation of doors, windows, floors, customized wardrobes, kitchen cabinets and other decoration processes are the main body.

    3. Soft decoration part.

    For the decoration of new houses, basic decoration is the key, and after the main decoration such as door and window installation is completed, the final step can be carried out - soft decoration. Soft decoration can further beautify the space environment and make the space effect more refined.

  5. Anonymous users2024-02-03

    1.Negotiate a new home renovation plan.

    2.Before decorating a new house, owners need to make relevant preparations, usually they should negotiate with the designer or decoration company to decorate the decoration plan of the house, and determine the design plan and budget table of the house.

    3.The owner needs to determine the construction project, design drawings and other items one by one, and it should be noted that when negotiating the construction cost, see the implementation clearly.

    4.Signed a contract for the renovation of a new house.

    5.When decorating the house, if the owner chooses to clean the package for repair, that is, the decoration company is responsible for the construction, and the owner is responsible for purchasing decoration materials and other matters. This requires the owner to sign a contract with the renovation company.

  6. Anonymous users2024-02-02

    Pre-design: First of all, we must find a reliable designer, and let the designer design the house according to your own preferences and living habits.

    Plumbing renovation: Before that, you should carry out a kitchen cabinet.

    The mason tile renovation process also involves sill stones, floor drains, marble window sills.

  7. Anonymous users2024-02-01

    The renovation of a new house is a very complex project, so let's take a look at the steps of the renovation of a new house.

    Step 1: Change water, electricity and heating, including the location and layout adjustment of kitchen and bathroom water pipes. According to the principle of ergonomics, the height and position of the water pipe often have to be changed greatly, for example, the water pipe access height of the toilet may not be the same as the reserved height.

    electricity, mainly considering the transformation of energized lines. Change the location and number of switches and sockets to make them more rational.

    warm, heated or underfloor heating. It needs to be designed in advance.

    The reason why water, electricity and heating are listed as the first step is that if the early stage is not well considered, it will lead to inconvenience in construction.

    Step 2: Floor tiles and wall tiles.

    In the first step, after the water, electricity and heating are adjusted, the floor tiles and wall tiles need to be paved.

    Step 3: House ceiling.

    Suspended ceilings for living rooms, bedrooms, study, dining rooms, kitchens, bathrooms, and balconies.

    Step 4: Wrap the door and mouth.

    The decoration of doors and windows, as well as the production of some furniture accessories, such as entrance treatment, TV background wall production, etc.

    Step 5: Painting the walls.

    Wall painting, you can use painting, wallpaper, wall covering, etc.

    Step 6: Primer topcoat.

    Priming and topcoat of doorways, windows, and parts of furniture.

    Step 7: Lighting installation.

    Install all the lamps in the room, including all kinds of ceiling lights, downlights, chandeliers, spotlights, etc.

    Step 8: Ventilation and cleaning.

    Maintain good ventilation conditions and sufficient ventilation time.

  8. Anonymous users2024-01-31

    When decorating a house, it needs to be based on certain processes and steps. What are the process steps of new house decoration? PChouse will take you to find out.

    First, the decoration preparation stage.

    During the preparation phase, you will also need to take detailed measurements of your room, including:

    1. Clarify the area designed in the decoration process, which is the area of tiling, wallpaper, and flooring;

    2. Clarify the main wall size. It is the size of the wall that needs to be designed to place the furniture in the future.

    Second, the demolition and reform stage.

    The demolition and renovation process is an important stage in the preparation of decoration, mainly including wall demolition, wall building, shoveling wall skin, dismantling heating, replacing plastic steel windows, etc. In the demolition and renovation stage, a framework for the construction site will be erected.

    Third, the stage of hydropower transformation.

    Observe whether the position of the range hood socket will affect the future installation; Observe whether the position of the water meter is appropriate; Observe whether the nozzle is located to facilitate the installation of the sink in the future;

    Fourth, the completion stage.

    After the painting work is completed, the next step is to start planning the installation process of finished products such as lamps, switches, hardware pendants, cabinets, bathrooms, wooden floors, bedroom doors, etc. In addition, it is also necessary to carry out a comprehensive and meticulous standardized acceptance of the decoration project, so far, the hard decoration settlement has basically been completed. ​​

  9. Anonymous users2024-01-30

    First, the preparatory stage.

    1.Looking for renovation companies and designers – 2The designer measures the room design and issues drawings - 3The owner makes a renovation budget - 4Sign a renovation contract.

    Decoration experience: At this stage, the owner can visit the home building materials market, determine that he wants main materials such as doors and windows, latex paint, etc., shop around, and find suitable building materials merchants.

    Second, the main body demolition and reform stage.

    1.Remove unwanted walls according to the design drawings - 2Wall Reconstruction - 3Hydropower positioning - 4Preparation of relevant decoration main materials.

    Decoration experience: load-bearing walls cannot be dismantled. Make sure that the demolished wall is not missing. When positioning water and electricity, do not rush to buy furniture and appliances, the size will change during the construction process.

    3. Hydropower transformation stage.

    1.Hydropower master elastic line positioning - 2Wall and floor slotting - 3Pipe laying, trough laying - 4Water Suppression Test - 5Draw a drawing of the waterway circuit for later maintenance.

    Decoration experience: When purchasing wires before decoration, plan according to the use of electrical appliances at home, and the wire specifications used in electrical appliances of different power are different.

    Fourth, the bricklayer construction stage.

    1.Do a good job of waterproofing - 2Tile approach - 3Kitchen, bathroom wall tile paving - 4Floor drain, squatting, etc. installation - 5Kitchen and balcony floor tile paving - 6Threshold stone installation.

    Decoration experience: waterproof should be tested for 48 hours. After the kitchen wall tile is paved, it is necessary to contact the cabinet merchant to come to the door and measure the cabinet size twice.

    Fifth, the carpentry construction stage.

    1.The owner made a woodwork disclosure on the spot - 2Installation of suspended ceilings – 3Cabinets and other furniture are made on site.

    Decoration experience: For some complex furniture or other carpentry projects, the owner had better confirm on site to avoid problems and be difficult to find later.

    Sixth, the painting construction stage.

    1.Brush the wall solid - 2Batch of plaster - 3

    Brush the putty for the first time - 4Door and window cover installation - 5Brush the putty for the second time - 6

    Sand Wall – 7Wallpaper construction - 8Latex paint construction - 9

    Floor paving - 10Baseboard mounting.

    Decoration experience: When brushing the putty for the first time, you can only carry out construction after the plaster is all dry. The second putty should be leveled on the wall. The latex paint painting process is one primer and two topcoats.

    7. Installation stage.

    1.Installation of lamps, switch panels - 2Drying rack – 3

    Bathroom bath bombs, hardware - 4Doors and windows - 5Stair slab - 6

    Bathroom cabinets, washbasins – 7Air conditioning, kitchen appliances – 8Shower room - 9

    Curtains – 10Furniture comes in.

    Decoration experience: If the balcony uses an ecological wood ceiling, then the drying rack needs to be determined in advance. Before installing curtains and furniture into the site, do a good job of clearing and cleaning.

    If you still have questions about decoration, environmental protection, home decoration pollution, home design and layout, customization, etc., you can consult Litian Decoration, and all decoration problems can be answered for you!

  10. Anonymous users2024-01-29

    Renovating a new home is a complex and tedious process that requires multiple steps to complete. First of all, we need to determine the decoration style and design scheme. This includes choosing the style of the interior, the color scheme, and the furnishings, among other things.

    According to the local market price, generally speaking, the cost of the design scheme is between 5,000-10,000 yuan.

    With the decoration device, you only need to enter the area + city, and calculate the most affordable local market in 3 seconds**: [Tuba Rabbit Big Platform Counts**].

    No longer worry about the company's price increase, omission and price increase.

    Next, we need to prepare for construction. This includes cleaning and removing old renovation materials, inspecting the structure of the house and utilities, etc. According to the local market price, the cost of construction preparation is between 5,000-10,000 yuan.

    Then, we need to carry out the hydropower renovation and wall treatment. This includes the arrangement of water and electricity pipelines and the painting and tiling of walls. According to the local market price, the cost of water and electricity renovation and wall treatment is between 10,000-20,000 yuan.

    Next, we need to lay the floor and renovate the ceiling. This includes the selection and laying of floors, as well as the decoration of ceilings and suspended ceilings. According to the local market price, the cost of floor laying and ceiling decoration is between 10,000-20,000 yuan.

    Finally, we need to buy furniture and decorate it. This includes buying furniture and decorations, as well as furnishing and placing them. According to the local market price, the cost of furniture purchase and decoration is between 10,000 and 20,000 yuan.

    In general, the cost of renovating a new home will vary according to different renovation requirements and local market prices. It is recommended to fully understand the local market price before the renovation, and communicate with the decoration company in detail to ensure that the decoration process goes smoothly. In addition, it is also very important to choose a regular decoration company and construction team to avoid some unnecessary troubles and disputes.

Related questions
10 answers2024-03-24

Steps to clean a new house:

1. Clean the bathroom first, because this place may be the first thing you need when cleaning the room; Then clean the kitchen, because it is a "big water user", so it is better to clean it first, and this is related to health, so it must be thoroughly cleaned, 360 degrees without dead ends. >>>More

22 answers2024-03-24

3,4,5,6 months decoration is better, decoration cost is not luxury decoration, 100 square meters or so 150,000 or so. Please comment on me, thanks.

10 answers2024-03-24

1. Some chemicals will be emitted from decoration materials and furniture, such as formaldehyde, benzene, lead, etc., which will definitely have an impact on the growth and development of the fetus. The second to third month after conception is the most sensitive period to foreign chemicals, as this period is the stage of development of the fetus's various systems. Paints, coatings, adhesives, etc. in decoration materials can release harmful gases, and if pregnant women are regularly exposed to these harmful substances during the third trimester of pregnancy, there is a possibility of causing malformations in the fetal body system. >>>More

8 answers2024-03-24

1. Deal with the base layer of the wall.

The base treatment of the wall is very important in the painting step, sloppy, you must know that the base treatment of the wall is not done, it will affect the subsequent process, so we must level the base before painting, in addition, because most of the rough houses are not flat, so it is necessary to carry out the leveling and cleaning process, when painting the wall, the old paint should be removed, if it is an old house of more than five years, the putty must be removed. >>>More

17 answers2024-03-24

In my opinion, the style of Naikan is a style that is convenient for things to be put in place, easy to take care of, and looks clean and tidy; Don't buy carpets, don't buy replicas, don't dry flowers, don't want toilet covers, the fewer bits and pieces the better, decorate with curtains, bedding or wallpaper; Useless, space-taking things are bought less, and they are all things that are hoarded with dust.