The site and facilities of the kindergarten meet the standards stipulated by the construction department and the education department; Have an independent financial institution, separate bank accounts; There are sufficient funds for running the kindergarten and the funds required to maintain the daily education; There are normal teacher channels and teachers who meet the requirements of the educational administrative department; There are professional managers of preschool education in accordance with the provisions of the administrative department of education and preside over the daily management of kindergartens; There is a clear plan for running a kindergarten, including the objectives, principles and types of kindergartens, the object and scope of enrollment, the teaching staff and the educational curriculum and teaching materials in line with national regulations; There is a kindergarten name, the name of the kindergarten should reflect the characteristics of nationality and children, and the name shall not contain words that are inconsistent with the actual situation or are easy to mislead.
-
Tell me, what project started?
-
When designing engineering projects, the design unit must implement the provisions on fire protection design in the national fire protection technical standards and other engineering construction standards.
Construction projects designed by relevant foreign units must comply with the provisions of China's fire protection technical standards.
National and provincial key projects and other construction projects that set up automatic fire protection facilities shall not be prepared for fire protection design, which includes the design basis, project overview and relevant drawings.
The design unit shall revise the fire protection design drawings in accordance with the "Opinion on Fire Protection Design Review of Construction Projects".
The design unit shall establish a responsibility system for fire protection design. The legal representative is responsible for organizing the fire protection design management of the unit and inspecting the quality of the fire protection design; The technical person in charge shall include the fire protection design in the scope of engineering design review, and the engineering design that does not meet the fire protection technical standards shall not be issued; The design unit shall organize engineering designers to study and master the national fire protection technical standards, and conduct regular assessments.
-
First of all, it is necessary to pre-approve the enterprise name, and then the capital verification by the accounting firm will be carried out, and then the corresponding pre-examination and approval procedures will be carried out, and finally the business license (industrial and commercial bureau) will be applied.
Company Law of the People's Republic of China
Article 7 A business license shall be issued by the company registration authority to a company established in accordance with the law. The date of issuance of the company's business license is the date of incorporation of the company.
The company's business license shall indicate the company's name, domicile, registered capital, business scope, name of legal representative, and other matters.
If there is a change in the items recorded in the company's business license, the company shall go through the change registration in accordance with the law, and the company registration authority shall renew the business license.
Article 23 The following conditions shall be met for the establishment of a limited liability company:
1) The shareholders meet the quorum;
2) There is a capital contribution subscribed by all shareholders in accordance with the provisions of the articles of association;
3) The shareholders jointly formulate the articles of association;
4) Have a company name and establish an organizational structure that meets the requirements of a limited liability company;
5) Have a company domicile.
-
Legal analysis: The preliminary design acceptance institution is the Construction Bureau, and the Ministry of Housing and Urban-Rural Development, referred to as the Construction Bureau, is a component department.
Legal basis: Tendering and Bidding Law of the People's Republic of China Article 65 Bidders and other interested parties believe that the bidding and bidding activities do not comply with the relevant provisions of this Law, and have the right to raise a congratulatory objection to the tenderer or complain to the relevant administrative supervision departments in accordance with the law.
-
1. The planning department shall review the planning requirements of the preliminary design.
2. The fire department shall review the fire protection design of the preliminary design.
3. The traffic police detachment reviews the traffic conditions of the preliminary design.
4. The Civil Air Defense Office shall review the preliminary design of the civil air defense design.
5. The Bureau of Land and Resources conducts a pre-examination of land use.
6. Municipal departments, environmental protection bureaus, health bureaus, ** bureaus and other relevant departments shall review the relevant professional content of the preliminary design.
7. The Construction Committee formulates and issues the preliminary design approval, and reviews the requirements for the implementation of the preliminary design approval documents.
8. The construction committee shall conduct a policy review of the construction drawing design documents, and issue a technical review entrustment notice according to the opinions of the owner.
9. The Construction Committee shall issue the "Construction Drawing Design Document Review Approval" according to the "Construction Drawing Design Document Review Report" issued by the construction drawing design document review agency.
Volume I: General Part.
1. Bidding documents. >>>More
My dream is to be a designer, because my mom and dad are both in the construction industry. Sometimes when my parents are at work, they take me with them. When I first went there, there was still a ruin outside my mother's construction site, but after a year or two, it became a high-rise building. >>>More
Building lighting project is an important part of urban lighting project, and excellent building lighting design plays an important role in enhancing the image of the city. The following seven issues need to be considered when doing the design of building lighting engineering: >>>More
1) The technical person in charge of the enterprise has no less than 6 years of experience in building decoration and decoration engineering, and has the professional qualification of registered construction engineer (registered structural engineer, architect, project manager) or intermediate or above professional and technical titles. >>>More
Quality EngineerThe following conditions are required to apply for the certificate >>>More