-
Volume I: General Part.
1. Bidding documents.
1. Bid commitment letter 1
2. Power of attorney of the bidder's legal representative 2
3. Declaration letter on the qualifications of bidders 3
2. The bidder's business license, qualification certificate and production license.
1. After the annual inspection of the current year, the business license of the enterprise (copy) 42, the production license and the relevant product inspection report 7
3. Company Profile.
1. Company profile 9
2. Company profile table.
3. Our factory has advanced manufacturing and testing equipment.
4. The main features of our products.
Fourth, the quality management system and quality certification.
1. ISO9001 certification.
2. Certificate of Credit 5. Enterprise Honor Certificate.
1. Various honorary certificates of the enterprise Volume II: Contract Terms.
1. Response and commitment to the terms of the contract.
Technical Agreement... Statement of Achievements.
-
The preparation of the bidding documents is based on the requirements of the bidding documents, and the bidding documents require those contents to be done.
The application for selection consists of a business part (including a reputation part) and a technical part.
The business section mainly includes the following:
Comparison of selections** and budgets;
Certificate of identity of the legal representative;
Power of attorney of the legal representative;
A copy of the copy of the business license of the enterprise legal person;
A copy of the copy of the enterprise qualification certificate;
A copy of the safety production license;
Qualification certificate of project manager or registered construction engineer (level 2 and above qualification) and intermediate and above technical title certificate;
A copy of the certificate of the title of the technical person in charge of the proposed project;
A copy of the receipt of the security deposit;
Then there's the technical part.
Construction organization design, personnel, materials, machinery, construction schedule, etc.
-
Buy bids first.
Then make the bidding documents according to the format behind the bidding documents, and fill in the blanks.
Make a copy of the business license, the organization ** certificate, and the tax registration certificate.
Others shall be done according to the requirements of the bidding documents.
-
Ask the old comrades in your unit, these things are matured by agreement, and it is very simple to do it once.
-
<> engineering design is an activity that comprehensively analyzes and demonstrates the technical, economic, resource, environmental and other conditions required for the construction project according to the requirements of the project, and compiles the design documents of the construction project. So how to bid for engineering design? Here's the answer!
What is Engineering Design Bidding.
Engineering design bidding refers to the tendering unit on the proposed project design task issued a tender announcement, in order to attract the design unit to participate in the competition, the tendering unit review in accordance with the requirements of the bidding documents, in accordance with the requirements of the bidding documents, within the specified time to the tendering unit to fill in the bidding documents, the tendering unit to determine the best design unit to complete the engineering design task activities called engineering design bidding.
How to bid for engineering design.
Bidding for construction engineering design may be open to public bidding or invitation to bid in accordance with the law.
1.Open tender.
According to the "Provisions on the Scope and Scale Standards for Bidding for Engineering Construction Projects" issued by the former State Development Planning Commission in May 2000, the following circumstances must be carried out in addition to obtaining the approval of the relevant departments in accordance with the law to not conduct public bidding:
1) For the procurement of design services with an estimated price of more than 500,000 yuan for a single contract;
2) Bidding for design services for engineering construction projects that use all state-owned capital investment or state-owned capital investment in a controlling or dominant position;
3) National key projects determined by the development and reform department and local key projects determined by the people of provinces, autonomous regions and municipalities directly under the Central Government.
2.Invitation to tender.
For projects that must be tendered in accordance with the law, bidding may be invited under the following circumstances:
1) The technology is complex, there are special requirements or limited by the natural environment, and only a small number of potential bidders can choose from;
2) The cost of using public bidding accounts for too large a proportion of the project contract amount.
If the tenderer adopts the method of inviting bidding, it shall ensure that there are more than three specific legal persons or other organizations with the ability to undertake the design of the bidding project and have the corresponding qualifications to participate in the bidding.
The above internal configuration of the town is about "how to bid for engineering design?" I hope that these internal travel capacity will be helpful to everyone. If you want to know more about the bidding information, please log in to the bidding network to view!
-
The design unit can participate in the construction bidding. The bidder is a legal person or other organization that responds to the bidding and participates in the bidding competition, and any subsidiary of the tenderer that does not have independent legal personality (unit with code), or any legal person and any of its subsidiaries (units) that provide design and consulting services for the preliminary preparation or supervision of the bidding project, are not eligible to participate in the bidding of the bidding project.
Article 25 of the Tendering and Bidding Law.
The bidder is a legal person or other organization that responds to the bidding and participates in the bidding competition. Where only individuals are allowed to participate in the bidding of scientific research projects tendered in accordance with the law, the provisions of this Law on bidders shall apply to the individuals bidding for the bidding.
Article 26.
The bidder shall have the ability to undertake the bidding project; If the relevant provisions of the state have provisions on the qualifications of bidders or the bidding documents on the qualifications of bidders, the bidders shall have the prescribed qualifications.
-
Bidding generally refers to the act of being entrusted or authorized by the tenderer to handle the bidding matters in accordance with the relevant laws and regulations. The bidding agency is to help the tenderer who does not have the ability to prepare bidding documents and organize bid evaluation to select bidders with strong ability and good credit to ensure the smooth implementation of the project and the realization of the construction goal.
Project bidding refers to the survey, design, construction, supervision, and important equipment (except imported mechanical and electrical equipment) and material procurement bidding related to the construction of the project. Organize bid opening, bid evaluation, bid awarding, etc.
It follows that the architectural design tenders are provided by the tenders**.
-
Article 1 in order to standardize the construction engineering design market, optimize the design of construction engineering, and promote the improvement of design quality, according to the People's Republic of China Bidding and Bidding Law, these measures are formulated.
Article 2 in line with the "engineering construction project bidding scope and scale standards provisions" of all kinds of housing construction projects, the design of the bidding and bidding shall apply to these measures.
Article 3 Where the design of a construction project adopts specific patented technology or proprietary technology, or if there are special requirements for architectural art modeling, the contract may be directly awarded upon approval by the relevant departments.
Article 4 construction administrative departments are responsible for the supervision and management of national construction engineering design bidding and bidding.
The local people's construction administrative departments at or above the county level are responsible for the supervision and management of construction engineering design bidding and bidding within their respective administrative areas.
Article 5 Bidding for construction engineering design may be open to the public or invite bidding in accordance with the law.
Article 6 the tenderer has the following conditions, can organize the bidding: (A) with the scale and complexity of the bidding project to adapt to the engineering technology, engineering cost, financial and engineering management personnel, with the ability to organize the preparation of bidding documents; (2) The ability to organize bid evaluation. If the tenderer does not meet the conditions specified in the preceding paragraph, it shall entrust a tendering agency with corresponding qualifications to conduct bidding.
Article 7 construction projects that must be tendered in accordance with the law, the tenderer shall organize the bidding on its own, shall be issued 15 days before the tender announcement or the invitation to tender, with the relevant materials to the local people's ** construction administrative departments at or above the county level for the record; If the tenderer entrusts the bidding agency to conduct the bidding, the tenderer shall, within 15 days after the signing of the entrustment of the joint sales slag smile, hold the relevant materials to the local people's construction administrative department at or above the county level for the record. Several forms of tendering:1
Public bidding refers to the tenderer inviting unspecified legal persons or other organizations to bid in the form of tender announcements.
2.Invitation to bid refers to the tenderer inviting a specific legal person or other organization to bid in the form of a bid invitation letter. To sum up, the management measures for bidding and bidding for construction engineering design are shown above, which standardize the management of bidding and bidding for construction engineering design, and it is recommended that bidding and bidding be strictly implemented in accordance with the measures.
Legal basis: The term "engineering construction project" in Article 2 of the Regulations for the Implementation of the Tendering and Bidding Law of the People's Republic of China and Article 3 of the Tendering and Bidding Law refers to the project and the goods and services related to the construction of the project. "Project" as used in the preceding paragraph refers to construction projects, including new construction, reconstruction, and expansion of buildings and structures, as well as related decorations, demolitions, repairs, etc.; The term "goods related to the construction of the project" refers to the equipment, materials, etc., which constitute an inseparable part of the project and are necessary for the realization of the basic functions of the project; The term "services related to engineering construction" refers to the survey, design, supervision and other services required for the completion of the project.
My dream is to be a designer, because my mom and dad are both in the construction industry. Sometimes when my parents are at work, they take me with them. When I first went there, there was still a ruin outside my mother's construction site, but after a year or two, it became a high-rise building. >>>More
Building lighting project is an important part of urban lighting project, and excellent building lighting design plays an important role in enhancing the image of the city. The following seven issues need to be considered when doing the design of building lighting engineering: >>>More
1) The technical person in charge of the enterprise has no less than 6 years of experience in building decoration and decoration engineering, and has the professional qualification of registered construction engineer (registered structural engineer, architect, project manager) or intermediate or above professional and technical titles. >>>More
What you mean is to do the plan for review, and I am the supervisor, who specializes in reviewing this. First of all, the company's qualifications should be complete, the on-site environment should be included, the arrangement of personnel, the arrangement of schedule, the on-site management system, safety and fire prevention measures, measures after the delay of the construction period, and so on.
There are 3 common versions;
There are three common types: construction organization design in the design report. >>>More