-
It's a bit embarrassing to hear your question, 10 meters in diameter?? Height 103 meters?? 12th floor??
These three data are linked to my inference that it is a structure, the building should be divided into two categories according to the use function, buildings and structures, the building is a residential structure is not inhabited, the building is divided into industrial buildings and civil buildings according to the use, and the civil building is divided into public buildings and residential buildings according to the use function, the general residential building is impossible to do such a high total height, more than 100 meters belongs to the super high-rise, the building fire prevention must be specially fire-fighting demonstration, but also set up a special apron and overhead refuge layerTherefore, the current residential buildings are designed within 100 meters, which is a boundary, and 103 meters of 12 floors, the height of each floor is meters, as a residential is not economical, the general design will not do this, so it is excluded from residential buildings, so what about industrial buildings? Industrial plants are generally low-rise and multi-storey, so please look at the fire code, "high-rise civil building design fire protection code" GB50045-95 in the industrial article, the fire protection design of the industrial heart is only in the "building design fire code" GB50016-2006 in the subsection, so from the code to conclude that industrial buildings are generally not more than 9 floors and 50 meters, so it is also excluded that it is an industrial building, then only the structure is left, or a landmark or something, If you really say that this kind of building is a residential building or an industrial building, then it seems that the fire code is going to be rewritten, and you can reflect this situation to the editorial board of the fire code.
-
You didn't go into detail about that. In the classification of construction projects, it is divided into; Industrial construction engineering, civil construction engineering (also divided into public buildings and residential buildings), structure engineering.
How should the cost be calculated?
Calculate the cost of the project in accordance with the construction contract.
-
Depending on what kind of professional building you belong to, according to what you said, it should not be a building building. Be able to speak clearly and in detail.
-
More than 100 meters is considered a high-rise building, although it only has 12 floors. However, if the condition is greater than a maximum value, the maximum value is calculated.
How to calculate the cost is a bit too big to ask. I don't know how to answer.
-
Superman engineering cost software, as long as you register, you can use it for free! The landlord gives a good one, thank you!
-
A friend recommended Superman engineering cost software to me! It seems that now it is active again, buy steel bar calculation and send construction cost software!
-
Luban is pretty good.
That's what I use.
-
Direct cost: 500 + 100 = 6 million.
Indirect filial piety: 600*15%*900,000.
Profit Hunger: (600+90)*2%=10,000.
The cost excluding tax is combusted: 600 + 90 + million.
-
1.The direct construction cost of foundation works is 10 million yuan.
2.The measure cost is 5% of the direct project cost 1000*5% = 500,000 yuan.
3.The indirect fee rate is 8% (1000+50)*8%=840,000 yuan.
4.The profit margin is 5% (1000+50+84)*5%= 10,000 yuan.
5.The comprehensive tax rate is (1000+50+84+ 10,000 yuan.)
6.The construction and installation cost of the project includes 1000+50+84+ (10,000 yuan).
-
The cost of construction and installation works is the cost of construction and equipment installation. The cost of construction and installation works is made up of direct costs, indirect costs, profits and taxes.
The cost of construction and installation projects should be the so-called construction project cost.
1. Define from the perspective of investors or owners.
The cost of construction projects refers to the cost of all the investment in fixed assets and current assets of the expected or actual expenditure of a certain project in a planned way. That is, the reproduction and construction of fixed assets of a construction project are carried out in a planned manner to form the sum of the one-time investment costs of the corresponding fixed assets, intangible assets and working capital.
2. Define from the supply subjects of contractors, contractors and designers.
The cost of construction projects refers to the project contracting (transaction) formed in the land market, equipment market, technical labor market, contracting market and other trading activities in order to construct a project.
Generally, it refers to the total cost of carrying out the construction of a project, that is, the sum of the one-time expenses of the construction project (engineering project) to carry out the reproduction of fixed assets in a planned way and form the minimum amount of flow**. It is mainly composed of construction and installation costs, equipment and equipment purchase costs, and other construction costs.
Construction project investment, also known as construction project cost, refers to all the costs required for the construction project from preparation to completion and delivery, that is, the sum of the one-time costs of the construction project to reproduce fixed assets and form the corresponding intangible assets and working capital in a planned manner. China's current system stipulates that the cost of construction projects is composed of construction and installation costs, equipment and equipment purchase costs, other construction costs, and preparatory costs.
-
Installation mainly refers to the installation of some facilities such as plumbing, wiring, lighting, etc.
Civil works are mainly the cost of the house to be built as a whole.
There is a difference between the two in detail, and as for the difference in calculation, it means that they are different in type. The object of reference is different, and the difference is naturally very obvious.
-
Installation cost, HK and foreign called mechanical and electrical engineering, domestic called installation, including a very wide range of professional, involving many specialties, water supply, drainage, reclaimed water, fire water, fire alarm, ventilation, air conditioning water, cooling water, power, lighting, lightning protection and grounding, weak current system (more), gas, heat, purified water system, sewage treatment system, power distribution system, boiler, generator set, elevator and so on.
Mechanical and electrical engineering is general, there are many majors, and public buildings are particularly complex and expensive, even more than civil engineering and decoration.
Civil engineering, including earthwork, foundation, structure, doors and windows, waterproofing, etc., also includes curtain wall, decoration, landscaping, roads, outdoor and other projects.
The calculation of the two is mainly due to the difference in measurement rules, and at the same time, the quota used and the fee are naturally different.
However, after switching to GB50500, the pricing of mechanical and electrical engineering should be more market-oriented.
If you have any questions, talk to them.
-
One is installation. One is civil engineering.
-
This kind of question is really speechless, you ask something small, such as how to calculate the amount of concrete engineering on the staircase, come up and ask directly how to calculate the cost of the project, who can answer for you, turn the quota yourself, it's all written.
-
The question ...
You can go to the training center. But、You can apprentice.。。
-
Depending on whether you are making estimates, budget estimates, or budgets, each stage requires this very complex and specialized knowledge. I can't tell you what to say at once. I've studied cost for a year, and it's more complicated. You can go and see the special information is different.
-
This is to calculate according to the design drawings to get the approximate amount of money required for the project.
-
This is very complex and belongs to professional knowledge. I can't tell you what to say at once. I've studied cost for a year, and it's more complicated. You can go and read professional books.
-
Depending on whether you are making an estimate, an estimate, or a budget, the information required for each stage is different.
-
No one can provide you with an accurate cost.
Labor costs, material costs, machinery costs and even tax and measure project costs are different in each place, and it is impossible to achieve the unilateral cost you want.
-
There are regional differences, and there is no reference.
-
No, it seems to belong to the category of market research, you need to conduct in-depth research in your place by yourself, and no one can help you here.
-
Knowing this will not do anything in practice, and practicing more will greatly improve your level.
The diameter and height of the circle can calculate the volume of the circle, and in order to calculate the weight of the circle, it is necessary to know what material the density of the cylinder is made of, otherwise the weight cannot be calculated.
In accordance with China's "Code for Fire Protection Design of Buildings". >>>More
The key to raising good fish is filtration, and filtration is mainly to filter fish feces, and the toxins in the water are produced by fish feces. At present, the general aquarium filtration system is mainly upper filtration, drip flow, bottom filtration, filter barrel, side filtration, and back filtration, which are different in form, but essentially the same, all of which are filtration systems for cultivating nitrifying bacteria outside the tank. That is to say, the fish feces must be extracted into those filters before nitrification, and the ammonia in the fish feces can be removed. >>>More
A new Buddha statue imitated in the form of an old Buddha statue!! Open face modern, no antiquity! The casters are also rough! >>>More
According to the design code, the diameter of the base bolt of the street lamp should be determined according to the height and weight of the street lamp. For a 10-meter-high street lamp, generally speaking, the base bolt diameter should be selected within a certain range. >>>More