  1. Anonymous users2024-02-12

    First of all. You have to see what kind of project it is

    If it is a new infrastructure, then if you break ground, no matter what the nature of the funds you have, then before entering the bidding process, you must have a planning permit (regulation) Otherwise, you will not be able to enter the bidding process. Then if you are a construction unit, you will win the bid for the construction. There must be a notice of winning the bid and a signed construction contract.

    Then you have to go to the construction committee to file the contract. The purpose of filing is to obtain a construction permit, which is a "construction permit" in the conventional sense. With a construction permit, it is necessary to procure the relevant materials in accordance with the contract and the relevant design (drawings, bills of quantities, and the project of the frame structure is more complicated), and then enter the construction process.

    As for the superintendent's commencement order, it's not as important as the construction permit, right?If it is the contractor, then you must communicate with the general contractor, otherwise even if the supervisor does not speak, the general contractor will card you, you will be finished Drawings and design you have to confirm the good Oh, everything is in accordance with the drawings and the bill of quantities to work Otherwise, it will be a trouble when the acceptance is in the future

    Hope mine is helpful to you!

  2. Anonymous users2024-02-11

    In accordance with the preliminary preparation conditions required in the contract (mainly the preparation of the system improvement, manpower and machine), if it is a contracted team, answer the instructions of the project department.

    After the conditions are met, you can start work after getting the supervisor's start instruction.

  3. Anonymous users2024-02-10

    Legal Noise Analysis: Before the start of the construction project, the construction unit shall, in accordance with the relevant provisions of the state, apply to the people's ** construction administrative department at or above the county level where the project is located to obtain a code for a construction permitHowever, the exception is for minor works below the limit determined by the construction administrative department. In accordance with the authority and procedures specified in the first place, the construction project shall be approved and the construction permit shall not be obtained.

    Legal basis: "Construction Law of the People's Republic of China" Article 7 Before the start of the construction project, the construction unit shall, in accordance with the relevant provisions of the State, apply to the people's ** construction administrative department at or above the county level where the project is located to obtain a construction permit;However, the exception is for minor works below the limit determined by the construction administrative department. Construction projects that approve the commencement report in accordance with the authority and procedures specified in the *** will no longer receive a construction permit.

  4. Anonymous users2024-02-09

    1.Measurement pay-off records, including planning fixed-point diagrams.

    2.Construction organization design (prepared according to the site), and the technical plan of the first phase of the project.

    3.Construction management personnel table and qualification certification materials.

    4.The qualification certificate of the construction unit, the business license, and the safety production permit (copy).

    5.Migrant worker safety, technical disclosure and safety education registration form (including special types of work).

    6.Machinery entry records, maintenance records.

    7.Project construction management organization diagram, poor quality control measures, safety control measures.

    8.Commencement application report.

  5. Anonymous users2024-02-08

    The following documents are required:

    Planning permit for construction works (including annexes);

    Construction Project Commencement Review Form;

    construction permit for construction projects;

    Notice of inspection of the building line issued by the planning department;

    specific supervision procedures to be carried out at the designated supervisory authority;

    The design drawings and design documents reviewed and approved by the construction administrative department.

    Classification of construction project use:

    Residential buildings: buildings used for people's daily life, such as residences, dormitories, hotels, and guest houses.

    Public buildings: buildings for people to engage in social public activities and various welfare facilities, such as various schools, libraries, theaters, etc.

    Industrial building: a general term for all kinds of buildings and structures used by people to engage in various industrial production activities. These production buildings are often referred to as industrial plants. Including workshops, substations, boiler rooms, warehouses, etc.

  6. Anonymous users2024-02-07

    1. Comply with national industrial policy, development and construction planning, land policy and market access standards. 2. The approval, approval or filing procedures have been completed. Among them, the first investment project that implements the approval system has been approved for the feasibility study report, and the project that needs to be approved for preliminary design and budget estimation has been approved for preliminary design and budget estimate; Enterprise investment projects that implement the approval system have been approved and the project application report has been approved; The filing procedures have been completed for the investment projects of enterprises that implement the filing system.

    3. The site selection and layout of the project in the planning area must conform to the urban and rural planning, and go through the relevant planning permission procedures in accordance with the relevant provisions of the urban and rural planning law 4. The project that needs to apply for the use of land must obtain the approval procedures for land use in accordance with the law, and has signed a contract for the paid use of state-owned land or obtained a decision on the allocation of state-owned land. Among them, industrial, commercial, tourism, entertainment and commercial residential and other operational investment projects shall acquire land by way of bidding, auction or listing for sale in accordance with the law. 5. The examination and approval of environmental impact assessment has been completed in accordance with the provisions of classified management and hierarchical examination and approval of environmental impact assessment of construction projects.

    6. The energy-saving assessment and review of fixed asset investment projects have been completed in accordance with the regulations. 7. Before the commencement of the construction project, the construction unit has obtained the construction permit or the commencement report in accordance with the relevant provisions of the "Construction Law", and has taken specific measures to ensure the quality and safety of the construction project of the investment project. 8. Comply with other relevant requirements of national laws and regulations.

  7. Anonymous users2024-02-06

    The construction unit needs to handle: 1. Construction project planning permit (including attachments); 2. Construction project commencement review form; 3. The construction is accompanied by the construction permit of the project; 4. Notice of inspection of the red line of the building issued by the planning department; 5. Specific supervision business procedures handled by the designated supervision agency; 6. Design drawings and design documents reviewed and approved by the construction administrative department; 7. Construction drawing review and filing certificate for construction work; 8. Minutes of drawing review; 9. Construction contract (copy); 10. Original data such as leveling points and coordinate points; 11. Engineering geological survey report and hydrogeological data; 12. Power of attorney of the representative of the construction unit on the construction site; 13. The agreement signed between the construction unit and the relevant departments. The legal basis is the Building Act.

  8. Anonymous users2024-02-05

    The construction unit needs to handle: 1. Construction project planning permit (including attachments); 2. Construction project commencement review form; 3. The construction is accompanied by the construction permit of the project; 4. Notice of inspection of the red line of the building issued by the planning department; 5. Specific supervision business procedures handled by the designated supervision agency; 6. Design drawings and design documents reviewed and approved by the construction administrative department; 7. Construction drawing review and filing certificate for construction work; 8. Minutes of drawing review; 9. Construction contract (copy); 10. Original data such as leveling points and coordinate points; 11. Engineering geological survey report and hydrogeological data; 12. Power of attorney of the representative of the construction unit on the construction site; 13. The agreement signed between the construction unit and the relevant departments. The legal basis is the Building Act.

Related questions
5 answers2024-06-25

The requirements for each ** entry are different, and the qualification requirements of the merchant enterprise require that the registered capital of the company must be 500,000 or more than 500,000 yuan. >>>More

7 answers2024-06-25

1. Online verification name (provide company name, business scope, ID card of corporate shareholders, proportion of allocated shares, registered address); Qianhai company has this: Qianhai business secretary's address is hosted for one year. >>>More

7 answers2024-06-25

Register a company, keep accounts and file taxes, open an account without a lease contract, and apply for a full set of high-quality handling for general taxpayers. . . >>>More

6 answers2024-06-25

Application materials: 1. Application form for housing ownership inspection (replacement); >>>More

8 answers2024-06-25

First of all, it is necessary to go to the notary office to notarize the legal representative who has died, and there is no need to notarize the property. >>>More