How to take the budget officer exam and the conditions for applying for the budget clerk exam

Updated on workplace 2024-06-30
4 answers
  1. Anonymous users2024-02-12

    Because there are really too few certificates in interior design, but now there are very few people who do fine decoration budget, you can do this. If you search for local budget officer training, there are many such institutions, but most of them are not of much practical use if you take a "job certificate". There are also some professional training institutions (very few), which can be obtained from the "National Cost Engineer Qualification Certificate".

    But no matter which one, you also have to have knowledge of budgeting, according to what you said you should not have budget experience, so it is recommended that you go to a training school to learn, in fact, you are just a beginner after learning, so that you know what budget is, and you need to study on your own in this area in the future. If there is anything you don't understand, you can ask me again.

  2. Anonymous users2024-02-11

    0531-8953313 Now many companies now require employees to take the national unified cost qualification certificate, simple theoretical knowledge can be seen by themselves, but there is a preparation and application of their own can not understand, it is best to learn.

  3. Anonymous users2024-02-10

    The requirements for applying for the budget officer certificate are:

    1. Technical secondary school or above in engineering cost;

    2. Have technical secondary school degree or above in other majors and have been engaged in cost work for one year. The budget clerk certificate is a qualification certificate required for the work of a budget engineer. Its work is as follows:

    1. Responsible for organizing and preparing the construction drawing budget of the development project;

    2. Review the completion settlement and audit of the development project;

    3. Participate in project construction, material and equipment bidding, and investment control;

    4. Review the subject matter in the bidding activities and contract terms;

    5. Participate in the inspection and inquiry of materials and equipment, and check the audit of raw material procurement;

    6. Review the design drawings and grasp the progress of the construction site;

    7. Continuously establish and improve the completion settlement system of construction projects.

  4. Anonymous users2024-02-09

    1. Primary (with one of the following conditions).

    1) Technical secondary school degree or above in this major or related major.

    2) Engaged in the profession for more than 2 years.

    2. Intermediate (with one of the following conditions).

    1) College degree or above in this major or related major.

    2) Continuously engaged in the profession for more than 4 years.

    3) Obtain the primary certificate of the profession and have been engaged in the profession for more than 2 years.

    3. Advanced (with one of the following conditions).

    1) Bachelor degree or above in this major, and engaged in this profession for more than 2 years.

    2) College degree or above in this major, and engaged in this profession for more than 4 years.

    3) Obtain the intermediate certificate of the profession and have been engaged in the profession for more than 3 years.

Related questions
7 answers2024-06-30

Budgeter refers to the detailed or rough statistics on the most basic labor, materials, machinery and other expenses completed by a project, including taxes, profits, etc. Budgeters are also commonly referred to as building budgeters or civil budgeters. >>>More

13 answers2024-06-30

So many questions·· If you still want to learn all at once about civil engineering, garden installation, steel structure and water conservancy!! >>>More

8 answers2024-06-30

Manual and software are parallel, and any amount can be calculated by software, and of course it may be calculated by hand. Otherwise, how did people work in this area before the arithmetic software came out? Hehe, as for the name of the take-off project of the software upstairs is too vague, it may be that you are not proficient in the use of software. >>>More

14 answers2024-06-30

At present, the application in terms of cost is probably in such a situation: the first type is also the most basic and technically the most mature application, that is, the budget software, which generally needs to enter the quota number and engineering quantity; The second type of software is specifically for the calculation of engineering quantities, the calculation of reinforcement, such as engineering quantity auxiliary calculation software, reinforcement auxiliary calculation software, although this kind of software also needs to manually input the characteristics and dimensions of the drawing, but not only greatly saves the workload, but also improves the accuracy of the results. With the implementation of the "quantity and price separation", "physical method" and the valuation method of the bill of quantities, the calculation of the quantity of the project is becoming more and more complicated, and the workload has also increased greatly, and the application of computers and these software has been inseparable from the work. >>>More

9 answers2024-06-30

The budget clerk needs to obtain the budget clerk certificate, also known as the cost clerk certificate. The data clerk does not need to be certified, but there are job requirements. >>>More