What is the difference between a budgeter and a data clerk? Do I need to get a certification?

Updated on culture 2024-06-30
9 answers
  1. Anonymous users2024-02-12

    The budget clerk needs to obtain the budget clerk certificate, also known as the cost clerk certificate. The data clerk does not need to be certified, but there are job requirements.

    First, the work of the budget clerk is: the budget officer of the construction enterprise generally does some budgeting, bidding, cost control, project tracking and measurement work, and will not make budget estimates at all, and the budget estimates are done by the design institute.

    If you take up a post, you just need a budget officer certificate, and you can basically solve it by paying money, not the construction committee, but the personnel bureau, and the unit will directly do it for you, which is useless. If the requirements are in-depth, it is necessary to take the practice qualification certificate, two kinds of cost engineer certificate and cost engineer certificate. The practice qualification certificate is used to show that you are qualified to issue cost documents on behalf of the unit, which has legal effect.

    The cost officer examination is organized by the Construction Committee and is a national examination.

    Master design budget and construction budget management, contract issuance control, claims management, project settlement.

    Second, the main job responsibilities of the material staff is to be responsible for the quality of the incoming materials, do a good job of tracking services, grasp the use of materials, timely statistics of on-site material loss, and ensure the reasonable application of materials.

    3. The main differences between the two:

    The job of the data clerk is to do engineering data, the technical content is not too high, and the speed is fast, so the recruitment is relatively wide, can operate office software, understand a little construction knowledge, correspondingly, there is no greater room for development.

    Budgeters need to have a solid knowledge of construction, and they are directly related to money, so the importance is even more obvious. The initial is the project budget, or cost, and then the cost control, which can be progressed to the position of cost manager, director of control, or even higher.

  2. Anonymous users2024-02-11

    The data clerk is at the construction site, and the budget is not on the site at all, so you need to know some things on the site very well to do it well.

    The most important thing is the collection and sorting of data in the construction process, especially the quality certificate, certificate and retest report of the raw materials used in steel bars, concrete, etc., if it is less, it is very troublesome to make up for the completion of the record, and there are more books such as specifications, and learn more about what work is currently being done on the site, to what extent, when to do the process inspection, etc. Just be mindful of everything.

    The most important thing for the budget officer is to be familiar with the drawings, the current price list, comprehensive and various quotas, building materials must be familiar, in addition to the calculation formula of the engineering quantity, the structural practice of the project, the concealed engineering, the change and other professional to be familiar with the use, analysis of materials and calculation of engineering materials; For the sub-items in the quota, especially the corresponding high ones that should be applied, the ability to convince Party A, the supervision party, the audit department and other departments; When bidding, the budget estimate of the project and the rules of the bidding can be mastered comprehensively; The final accounts are not missing, and how to control the project quantity, fees, sub-items and other aspects is the most critical. and master related professional knowledge such as auditing, accounting, materials, design, etc.; The others are dedication, commuting time, work positivity, etc.

  3. Anonymous users2024-02-10

    Engineering Budgeter.

    It's still relatively easy to test, after all, it's a work certificate.

    Budgeter refers to the detailed or rough statistics on the most basic labor, materials, machinery and other expenses completed by a project, including taxes, profits, etc. Budgeters are also commonly referred to as building budgeters or civil budgeters.

    The specific work contents of the construction project budgeter are:

    First, master the management of design budget and construction budget.

    That is, the management of two calculations. Specifically, it is to do a good job in the preparation and comparison of the second calculation, and to prepare the budget for the increase or decrease of the received design changes, technical approval orders, and materials.

    Second, contract issuance control, contract planning, drafting and initiating the corresponding contract approval process for labor and professional contracting, and evaluating the performance of the contract award.

    Third, claim management, the owner does not perform or fails to correctly perform the obligations agreed in the contract and causes losses to the construction party, and the construction party must submit a claim for compensation to the owner and draft the claim documents.

    Fourth, project settlement.

    According to the completion information, the project settlement statement is prepared to determine the final cost of the project.

    At present, the salary price of the budget clerk is about 3000-8000 yuan per month, and the working years are around.

    The longer it is, the more it will pay.

    It includes the Civil Engineer and the Installation Budgeter, but it has now been renamed as the Estimator (Civil Estimator, Installation Estimator). The five members of the building.

    Yes: constructor, quality inspector, safety officer.

    Material clerk, data clerk. There is no cost officer among these five members, and the cost officer does not belong to one of the five major construction personnel. Compared with the five major members, the salary of the budget clerk is relatively high.

  4. Anonymous users2024-02-09

    I don't think the last thing a girl should choose is a material worker. I am doing warehouse management, and I know that doing this business is very tiring and annoying, and a lot of data and information need to be managed, which is difficult. And you are also a member of the company, there is an urgent item on the rest day, so you can come to the company to issue materials, can you not go?

    Light raw materials are okay, but when heavy raw materials girls can't move, and no one helps what to do? So I've been in warehouse management for many years, and I'm a little tired of this business. Girls don't have to think about it!

    The data clerk is easy, and I don't think the difficulty coefficient is as big as the material clerk, so you can get it right at one time. Generally, there is no holiday day to send materials, <>

    I am the only one who thinks that there is no future, there is no room for growth, and of course the salary is relatively limited. Therefore, self-motivated girls do not have to be just comfortable, taking into account the information clerk. As for the remaining budget staff, I personally feel that there is no data clerk easily, and there is no material clerk cumbersome, but the work pressure is also very high.

    If I were a girl, I would choose a budgeter. Tests are certain, diligence is temporary, and once you get started, you have a sense of achievement. They all say that they are budget officers, and if they are called accurately, the leading cadres will feel that they love you more and more.

    The data clerk is very easy to get started and simple; Material workers do not make mistakes frequently, usually in vain, physically and mentally exhausted. Okay, that's it, I hope I can help you, <>

    Learn the materials first, because it is easy to find a job, the work of the data clerk is simple, but it is complicated, and it is much better after learning and sorting it out by yourself. It is not necessary to go out to read the book and test the cost of the time, because there are many items involved in the test, and the materials are full of norms and standards, you will remember it if you open more, which is conducive to the test. After not love to dry materials, you can bring a certificate to the cost, that than directly do the cost of the road is much wider, girls learn the cost of better than the data clerk is not only a star and a half, I think the cost of a large number of construction enterprises is the budget staff to manage the cost, generally can not be the construction site, the natural environment is better, the salary is able, if it is a hand or rich experience, the income is also considerable, and then the cost of the test is also quite rich.

    It would be better if you could enter the cost department and distribution department of the enterprise work department, <>

    The key is to grasp the situation of mobile phone software and work initiative. Good data staff income is also good, naturally can have some connections to receive private orders is better, now most of the materials are contracted, if you can be a place of material engineering acceptance and archiving provisions are familiar with the relationship work is a lot, if into a larger company is not allowed to take orders, let full-time, relative cost staff slightly relaxed, but often maintain a situation, maintain the construction data and engineering construction at the same time, not like the cost budget sometimes day and night to fight out of the data information, But there are also technical professional package materials, there are some environments, some connections are very strong, and the benefits are considerable.

  5. Anonymous users2024-02-08

    The data clerk is better, this job is done with delicate people, and the pressure is not particularly great.

  6. Anonymous users2024-02-07

    I think the data clerk is the first choice, the data clerk, as the name suggests, is to do some engineering backup data, need to sort out the project, and also need to have a certain understanding of the site, is a comprehensive position, in this position can learn a lot of things, the development and improvement of self-ability is of great help.

  7. Anonymous users2024-02-06

    For women, whether it is a data clerk, a budget clerk or a material clerk, these three types of work are very good, the work is simple, and very decent.

  8. Anonymous users2024-02-05

    The data clerk has the most unpromising future, mainly to do the data at ordinary times, in order to pass the completion and acceptance; The budget clerk is mainly working in the Ministry of Industry and Economic Affairs or the Ministry of Commerce, mainly responsible for the measurement of the upper and lower levels, as well as the bidding and bidding matters, which has a lot of oil and water, after all, the following construction team hopes to do the measurement early every month; The construction staff is mainly based on the site, and the ability to communicate and read the drawings is relatively high, of course, the main thing is that the head is flexible, and the construction team will not make much money if they do not cut corners. There is also a little better in addition to housing construction, other architectural professions are widowed marriages, of course, you have a relationship in the family does not count, after all, after being powerful and powerful, a few wives are not a problem But still look into the pit when you think more.

    Budgeter prospects: Every construction project needs a cost budget, and cost positions are indispensable in construction enterprises. China's construction industry is booming, and a huge project like the Beijing Olympics requires a large number of professional cost budget talents.

    The cost of the project is a matter related to people's livelihood, which is important and rigorous. The cost of talent because of its importance and considerable income, market demand is large, but the talent is insufficient. Cost budgeting professionals are an indispensable part of construction projects, which cannot be replaced by other professions, and are an important part of whether a project can successfully obtain maximum profits.

    Engineering cost personnel are in the core competitive positions in the enterprise, and the construction industry has a huge talent gap in the domestic cost budget.

  9. Anonymous users2024-02-04

    Summary. Hello Qinqin is very happy to answer for you: **Quorum is a more difficult profession than budgeters, constructors, materials and data clerks, mainly to examine the close grasp of construction costs and construction periods, and make a reasonable ** quota.

    Hello kiss is very high crack or happy to answer for you: ** Dingfu Wu Engineer is more difficult than the budgeter, constructor, material and data clerk more difficult to test the profession, mainly to test the construction cost and construction period of the close grasp, to make a reasonable ** quota.

    In general, the difficulty of burying the eight certificates is not very great, and the difficulty is also comparable, and the laws and regulations of the exam content and their related knowledge, professional basic knowledge, and professional general knowledge are all basic knowledge of Youzhao, as long as you do enough preparation, the pass rate is very high.

Related questions
5 answers2024-06-30

1) The two levels are different: the cost engineer is intermediate, and the budget clerk is junior. >>>More

14 answers2024-06-30

At present, the application in terms of cost is probably in such a situation: the first type is also the most basic and technically the most mature application, that is, the budget software, which generally needs to enter the quota number and engineering quantity; The second type of software is specifically for the calculation of engineering quantities, the calculation of reinforcement, such as engineering quantity auxiliary calculation software, reinforcement auxiliary calculation software, although this kind of software also needs to manually input the characteristics and dimensions of the drawing, but not only greatly saves the workload, but also improves the accuracy of the results. With the implementation of the "quantity and price separation", "physical method" and the valuation method of the bill of quantities, the calculation of the quantity of the project is becoming more and more complicated, and the workload has also increased greatly, and the application of computers and these software has been inseparable from the work. >>>More

12 answers2024-06-30

Technicians, constructors, and data clerks are all very good positions. It mainly depends on the efforts of the individual. >>>More

13 answers2024-06-30

The budget clerk certificate is registered in March every year, and the examination is carried out ten days after registration, and the certificate is issued within 5-10 working days after passing the examination. >>>More

13 answers2024-06-30

Examination supervisor conditions:

Citizens of the People's Republic of China, law-abiding, with the following conditions, can apply for the supervision of the engineer qualifications: >>>More