Scaffolding occupational hazard measures, scaffolding safety protection measures?

Updated on society 2024-06-12
3 answers
  1. Anonymous users2024-02-11

    1. The material specifications and support standards of scaffolding should strictly implement the relevant provisions in the "Safety Technical Regulations for Construction and Installation Engineering", and the scaffolding structure must be firm and stable.

    2. Before all kinds of scaffolding are put into use, the person in charge of the construction must organize the erection and use of the scaffolding and the safety officer to jointly inspect, perform the handover and acceptance procedures, use new and self-made tools, and must have a factory certificate and assembly instructions, which can only be used after being identified by the superior safety technology department and approved and approved.

    3. During the construction period, when using scaffolding above 3m, a firm protective railing must be set on the outside of the working face, and a 13cm high sail slow riser should be set up, a protective net should be set up without a foot guard, the scaffold should be more than 1m higher than the parapet wall, the slope roof exceeds the cornice, and the part above the roof should be tied with a protective railing and other protective measures.

    4. The vertical rod of the steel pipe scaffold should be placed vertically and stably on the metal base or skid, the spacing between the vertical rods shall not be greater than 2m, the spacing of large crossbars shall not be greater than, and the spacing of small crossbars shall not be less than.

    5. Every 10m of scaffolding pole foundation must be tamped and smooth.

    6. Every 10m steel pipe scaffold pole must be provided with a base and skids.

    7. Scissors and struts should be set at both ends of the scaffolding, corners and every 6 7 poles, scissors braces and struts and the angle between the ground and the ground should not be more than 60 degrees, the bottom end of the strut should be buried in the ground not less than 30cm, and when the height of the shelf is more than 7m or the strut cannot be set up, every 4m high and every 1m horizontally, the scaffold must be firmly connected with the building.

    8. The ramp and platform on the outside of the scaffold should be tied with a 1m high protective railing and a nail-high foot board with a protective vertical net.

    9. At the openings of doors and windows, erect oblique rods against the pick-up frame, and a section of the wall is not more than 30 degrees, and should be supported in the firm part of the building.

    10. The thickness of the bamboo foot board shall not be less than 5cm, the spiral hole shall not be greater than 1m, the bolt must be tightened, the length is generally to, and the width is 30cm.

    11. The width of the shelf shall not be less than, the scaffold board shall be fully paved, and the distance from the wall shall not be greater than 20cm, and a double row of small crossbars shall be erected when the head is connected, and the spacing shall not be greater than 20cm.

    12. The scaffold should be a steel pipe with an outer diameter of 48 51cm and a wall thickness of 3.

    13. Scaffolding safety net protection, see the organizational design of safety net erection for details.

  2. Anonymous users2024-02-10

    <>What is the specific content of scaffolding protection safety measures, the following Zhongda Consulting will answer for you.

    1. The steel pipe scaffolding is made of steel pipe with an outer diameter of 48 51mm, a wall thickness of 3, and no serious rust, bending, flattening or cracking.

    2. The rod connections of the steel pipe scaffold are all qualified Margang fasteners, and steel wires or other materials shall not be used for binding.

    3. The spacing of the vertical rods of the structural scaffold is not greater than that of the passenger transport, the spacing of the large crossbars is not greater than that of the large crossbars, and the spacing of the small crossbars is not more than 1m. When decorating, the scaffolding pole is not larger, the spacing of large crossbars is not greater, and the spacing of small crossbars is not greater.

    4. The scaffold is firmly connected to the structure according to the layer, the vertical distance of the pull joint is not more than 4m, the horizontal distance is more than 6m, the strength of the material used in the pull joint is not lower than the strength of the double-strand No. 8 steel wire, and the high-rise frame does not use flexible materials for pulling the joint, and according to the current situation, a reliable support is set at the pull joint.

    5. The operating surface of the scaffold is covered with qualified scaffolding, and the distance from the wall is controlled within 200mm, without gaps, probe boards and flying springboards. The lower layer of the scaffold board is provided with a horizontal net, and two protective fences and a foot guard are set on the outside of the operating surface, and the safety net is hung vertically, and the lower mouth is tightly sealed, and the protective height is not less than 1m.

    6. To ensure that the overall structure of the scaffold is not deformed, where the height of the scaffold is more than 20m, the longitudinal scissor brace is arranged, the width of which is not more than 7 vertical rods, the angle between the scaffold and the horizontal plane is controlled at 450 600, and the height is below 20m, and the positive and negative oblique supports are set.

    7. Draw up the design scheme of special scaffolding and tall scaffolding with a height of more than 20m.

    8. The load of the internal and external load-bearing scaffolding used in the structure shall not exceed 2646n m2. The use load of the interior and exterior scaffolding for decoration does not exceed 1960N.

    9. The horizontal and vertical distance between the outer edge of the construction in progress (including scaffolding with ballast ear frame) and the edge of the external power overhead line shall not be less than 3m.

    10. Before all kinds of scaffolding are put into use, the person in charge of the construction shall organize the person in charge of supporting and using the scaffolding, as well as the technical and safety personnel to conduct joint inspection and acceptance, and perform the inspection procedures.

    11. Before the special scaffold is erected and disassembled, the technical department shall prepare a safety construction plan and submit it to the superior technical leader for approval before construction.

  3. Anonymous users2024-02-09

    1. Scaffolding erection personnel must be professional scaffolding workers who have passed the assessment according to the current national standards (safety and technical assessment and management rules for special operation personnel).

    2. Personnel who erect scaffolding must wear safety helmets, safety belts, and non-slip shoes.

    3. The quality of the scaffolding components and the quality of the erection must be inspected and accepted according to the regulations, and it is allowed to be used only after it is qualified.

    4. The construction load on the working layer shall meet the design requirements, shall not be overworn, and shall not be fixed on the scaffold such as the formwork support, the cable wind rope, and the conveying pipe for pumping concrete and mortar. It is strictly forbidden to hang lifting equipment.

    5. When there is strong wind, fog, rain and snow, the scaffolding erection and dismantling operations should be stopped. Anti-skid measures should be taken for shelf operations after rain and fog, and snow should be swept away.

    6. Safety and quality inspection of scaffolding.

    Scaffolding and its foundation shall be inspected and accepted at the following stages:

    After the foundation is completed and before scaffolding is erected.

    Before a load is applied on the work level.

    After each pole (6m high).

    After reaching the design height.

    After strong winds and heavy rain, the cold area is frozen.

    Taken off for more than a month.

    Scaffolding inspection and acceptance should be carried out according to the following technical documents:

    Construction Specifications. The construction team is the first to weave design and change documents.

    Technical disclosure documents.

    In the use of scaffolding, the following items should be checked regularly:

    Whether the setting of the rods and the structure of the connecting rods, connecting wall pieces, supports, door opening trusses, etc., meet the requirements.

    Whether the foundation is waterlogged, whether the base is loose, and whether the pole is suspended.

    Whether the fastener bolts are loose or not.

    Whether the deviation between the settlement and the verticality of the upright rod meets the requirements of the code.

    Whether the safety precautions meet the requirements.

    Whether it is overloaded. 7. During the use of the scaffold, it is strictly forbidden to dismantle the following rods:

    The longitudinal and transverse horizontal rod at the main node, the sweeping rod.

    Connecting wall pieces. 8. Excavation operations shall not be carried out on the scaffold foundation and its vicinity, otherwise safety measures shall be taken. and report to the competent department for approval.

    9. When erecting scaffolding on the street, there should be protective measures on the outside to prevent falling objects from injuring people.

    10. When electric and gas welding operations are carried out on scaffolding, there must be fire prevention measures and special guards.

    11. The erection of temporary power lines and scaffolding grounding and lightning protection measures should be complete.

    12. When erecting and dismantling the scaffold, fences and warning signs should be set up on the ground, and people should be assigned to guard them, and non-operators are strictly prohibited from entering.

Related questions
8 answers2024-06-12

Scaffold refers to a construction site.

A variety of brackets erected for workers to operate and solve vertical and horizontal transportation. A general term used in the construction industry to refer to the construction site used in the exterior wall, interior decoration or high floor height where direct construction is not possible. Mainly for the construction personnel to work up and down or perimeter safety net enclosure and high-altitude installation components, etc., to put it bluntly, it is to build a shelf, scaffolding production materials usually have: >>>More

8 answers2024-06-12

1. The backing plate and base should be accurately placed on the positioning line, and the backing plate must be laid smoothly and not suspended. >>>More

14 answers2024-06-12

Reinforcement Train the entire scaffold into one to prevent collapse.

10 answers2024-06-12

And mobile scaffolding is not too difficult to find now, I suggest you go here to see mobile scaffolding, the value in use is more perfect, the surface does not need maintenance, and the mobile scaffolding net in other places. The main processing technology is to determine that mobile scaffolding can be found anywhere, which may not be as comprehensive as mobile scaffolding here. So when using mobile scaffolding accessories, you should pay attention to maintenance, so that its service life can be more, mobile scaffolding nets in other places, and the elimination period of use, I suggest you go here to see mobile scaffolding, the surface does not need maintenance. >>>More

10 answers2024-06-12

Full house of scaffolding.

Also known as a full house. >>>More