-
1. The remote bid evaluation management personnel at the project location shall enter the project information into the remote bid evaluation coordination system at the same time as the project bidding documents are sold.
2. The remote bid evaluation management personnel of the remote bidding management agency shall log in to the coordination system every day to check the application submitted by the field to use the local judges for remote bid evaluation, and confirm the application or request an extension in a timely manner according to the vacancy of the bid evaluation room on the day of bid evaluation.
The provincial and municipal construction engineering trading centers shall provide at least 12 remote bid evaluation slots for off-site bid evaluation every working day, and in principle, off-site bid evaluation applications shall not be rejected without reason. The proportion of applications and rejections accepted by CFETS for remote bid evaluation will be included in the annual assessment of CFETS and the evaluation indicators of CFETS' classification and grading.
3. After the remote administrator confirms the application, the project manager shall use the remote bid evaluation expert selection and notification system of Jiangsu Province to randomly select and notify the experts within the specified time.
4. When the project is opened, when the bidder's technical bid is imported into the bid evaluation system, the bidder shall be required to confirm the correctness and completeness of the imported bidding documents, and the tenderer shall make the corresponding written record.
5. After the remote experts arrive at the trading center, a special person should be responsible for printing the expert login password, verifying the identity of the expert, keeping the expert communication tools in a unified manner, guiding the expert to the remote bid evaluation room, and assisting the expert to enter the remote bid evaluation system and the monitoring system.
6. Start the bid evaluation at the specified time. The on-site supervision of the off-site bid evaluation experts shall be supervised by the bidding supervisors at the location of the project through the remote bid evaluation monitoring system, and the off-site administrator shall transmit the image of the bid evaluation site to the main venue of the project through the remote monitoring system, and assist the off-site bid evaluation experts to conduct remote inquiries and project manager defenses. According to the actual needs, the off-site administrator can also assist in on-site supervision;
7. After the bid evaluation is completed, the system automatically generates a scoring summary table, and local and remote experts must confirm it in the bid evaluation system before the bid evaluation is over.
This material can help you understand that bidding in different places is beyond the geographical limit, and units from other provinces can bid for it, which increases the difficulty of bidding, but improves the quality of bidding.
-
Legal analysis: off-site bidding is legal. The required documents are as follows:
1. Application for registration of branch establishment; 2. A copy of the articles of association; 3. A copy of the Business License of Enterprise Legal Person stamped by the company registration authority; 4. The original employment document and a copy of the identity certificate of the person in charge of the branch; 5. Proof of use of business premises; 6. Those who are engaged in processing and production projects, production and operation of flammable, explosive and dangerous goods, and apply for entertainment service venues, tourism, printing and other industries, must submit the "Enterprise Site Investigation Form" issued by the industrial and commercial office where the branch is located with slag; 7. If the establishment of a branch must be submitted for approval by laws and administrative regulations, or if there are projects within the business scope of the branch that must be submitted for approval according to laws and administrative regulations, the relevant approval documents shall also be submitted; 8. Other leather matching files required to be submitted by the company registration authority; 9. The above materials shall be in duplicate, and if they are not indicated as photocopies, the originals shall be submitted, and if they are indicated as photocopies, the originals shall be provided for verification.
Legal basis: Article 45 of the Regulations of the People's Republic of China on the Administration of Company Registration A branch refers to an institution established by a company outside its domicile to engage in business activities. A branch office does not have the status of a corporate legal person.
-
1 Not required.
2 According to Article 10 and 2 of the Regulations for the Implementation of the Procurement Law, state-owned enterprises investing in other places may conduct public bidding locally or in other places.
3 However, it should be noted that if a state-owned enterprise invests in a different place and chooses to conduct public bidding in a different place, it needs to meet certain conditions, such as having been registered in a different place for one year and having the ability to independently bear civil liability.
To sum up, it is not necessary to invite local public tenders to invest in state-owned enterprises in other places, but they need to be selected in accordance with relevant laws, regulations and conditions.
-
Domestically, investment projects by state-owned enterprises (SOEs) are usually subject to a public bidding process. If you invest in a project of a state-owned enterprise in another place, whether you need local public bidding may be affected by local regulations and actual conditions. Generally speaking, local ** will require local tenders to ensure that local banquet enterprises and residents have more opportunities to participate in investment projects and promote local economic development.
However, there may be exceptions if the project is of a special nature or involves a major national strategy.
It is recommended that you understand the relevant local policies and regulations before investing, and consult the corresponding professionals to avoid unnecessary risks and problems.
-
Legal Analysis: No. The tenderer shall not restrict or exclude potential bidders or bidders with unreasonable conditions.
If the tenderer has any of the following behaviors, it is a restriction of unreasonable conditions and reprimands potential bidders or bidders: (1) providing different project information to potential bidders or bidders for the same bidding project;
B) set qualifications, technology, business conditions and the specific characteristics and actual needs of the bidding project is not suitable or has nothing to do with the performance of the contract;
3) Projects that must be tendered in accordance with the law are based on the performance and awards of specific administrative regions or specific industries as bonus points or conditions for winning bids;
4) Adopt different qualification or bid evaluation standards for potential bidders or bidders;
5) Limiting or designating specific patents, trademarks, brands, places of origin or merchants;
6) The project that must be tendered in accordance with the law is not limited by the law to the potential bidder or the bidder's form of ownership or organization;
7) Restrict or exclude potential bidders or bidders with other unreasonable conditions.
Legal basis: Article 790 of the Civil Code of the People's Republic of China The bidding and bidding activities of construction projects shall be carried out openly, fairly and impartially in accordance with the provisions of relevant laws.
-
Legal Analysis: No. The bidder shall not restrict or exclude potential bidders or bidders with unreasonable conditions.
If the tenderer has any of the following acts, it is an unreasonable restriction or exclusion of potential bidders or bidders: (1) providing different project information to potential bidders or bidders for the same bidding project; (B) set qualifications, technology, business conditions and the specific characteristics and actual needs of the bidding project do not adapt to the letter or have nothing to do with the performance of the contract; (C) in accordance with the law must be tendered for the project to a specific administrative region or specific industry performance, awards as a bonus or bid conditions; 4) Adopt different qualification or bid evaluation standards for potential bidders or bidders; 5) Limiting or designating specific patents, trademarks, brands, places of origin or merchants; (F) the project that must be tendered in accordance with the law, illegally limiting the ownership or organizational form of potential bidders or bidders; 7) Restrict or exclude potential bidders or bidders with other unreasonable conditions. [Legal basis for this article]::
Article 790 of the Civil Code of the People's Republic of China The bidding and bidding activities of construction projects shall be carried out openly, fairly and impartially in accordance with the provisions of relevant laws.
1. Collection of bidding information and bidding documents. >>>More
Wow,,, you love her so much? Dizzy...
It's fake that the Internet doesn't let go of feelings. Maybe she likes the husband she has online right now. >>>More
The main content of the tender can be divided into three parts: procedural terms, technical terms, and commercial terms. It mainly contains the following nine contents: >>>More
If the long-distance relationship has not progressed like this, or there is no way to change the status quo for the time being, then people will burn out and break up easily.
It should be released in early September, so I hope you can be patient.