What do I need to pay attention to when installing a shower room? What are the advantages and disadv

Updated on home 2024-06-28
10 answers
  1. Anonymous users2024-02-12

    What do I need to pay attention to when installing a shower room? Do a good job in moisture-proof work. It is good to choose two-component energy-saving acrylic coatings for waterproof coatings, which is also the waterproof coating recommended by the Ministry of Housing and Urban-Rural Development at this stage.

    Because architectural coatings can tightly wrap pipes and road surfaces, penetrate into the gaps, and are not easy to close after drying, they are more suitable for pipes such as toilets than rigid materials such as waterproof cement, and there are more gaps in small houses. In order to make the moisture-proof deadline last longer, it is better to brush the architectural paint 3 times, because the architectural paint is allowed to dry thoroughly, so it is not possible to choose to carry out it in rainy or sexual climates. Generally, the drying period of two-component energy-saving acrylic paint is about 3 to 4 days.

    Drainage pipes and anti-odor floor drain solution: due to the need to deodorize and infectious disease protection in the toilet, the state stipulates that there must be a concave pool gooseneck curved pipe design scheme during the construction of the project, and the bathroom floor has been installed with a drainage pipe, but once the water leaks through the road surface or water supply pipe, all the toilet concave pools will be filled with turbid water, and the water is not preventable or crosses the wall to penetrate into the foot of the house or penetrate into the next layer. Therefore, the secondary drainage pipe mouth should be set at the end of the concave pool, and the floor tile joints should be scraped with leak-proof concrete on the ground.

    When applying sealing silicone, it is not necessary to apply silicone rubber to the surface of acrylic sheet sanitary ware. If you don't apply a small amount carefully, remember not to scrub urgently, it is difficult to eliminate, you should wait for it to solidify and gently peel it off, not to scratch it with a hard block, otherwise it will cause the surface to be destroyed. After the basin is assembled, it should be used only after the silicone rubber has been thoroughly solidified (the curing time of the silicone rubber is 24).

    What are the advantages and disadvantages of shower rooms? The hole spacing of the embedded parts of the shower room size should be designed before the bathroom is decorated, and the wiring leakage circuit breaker equipment should be considered before the assembly of the shower room to prevent repair; After the outer packaging of the whole shower room is opened, please place the laminated glass vertically against the wall and stably place, horizontal or uneven placement may cause damage to the glass window, causing economic losses or accidental injury; When transporting, it is very easy to break the glass when transporting the whole shower room horizontally, so it must be transported upright and by two people at the same time.

  2. Anonymous users2024-02-11

    1. For families with small bathroom space, a shower room can be installed without installing a bathtub, which can save a lot of space. After installing the shower room, you don't have to worry about water seepage in your bathroom, and the shower room makes a good partition, when you use the shower head to shower, the water of the shower will no longer splash everywhere, which realizes a dry and wet separation.

    2. The shower room also has the function of keeping warm and decorating. When taking a bath in the bathroom in winter, surrounded by the shower room, the water vapor will condense in the shower room and will not dissipate so quickly, which plays a role in keeping warm. If you have a large bathroom space and don't have a shower room, the moisture will quickly disperse and the air around you will drop rapidly, and you will feel very cold.

  3. Anonymous users2024-02-10

    Pay attention to the environment, but also pay attention to moisture, but also pay attention to waterproof, pay attention to prevent water leakage, but also pay attention to sewer pipes. The advantage of the shower room is that it can be done, it can be a dry bath, and the area is relatively large, and the disadvantage is that it is more troublesome to clean, and it will cause the dampness of the wall, and it will also lead to blockage.

  4. Anonymous users2024-02-09

    The quality of the material of the shower room determines its safety and durability, and we must choose the material with excellent quality, so that it can be used with confidence after installation. Advantages: Take a bath in winter, the shower room has less space, it is warmer, and it will not be too cold when taking a bath. Speaking of disadvantages, it may be that some small apartments may not be suitable for installing shower rooms, and they are not allowed in space

  5. Anonymous users2024-02-08

    The overall shower room is a kind of non-steam generating device, a sanitary unit composed of a sprinkler device, a shower room, a shower screen, a top cover, a bottom basin or a bathtub, which can realize the separation of dry and wet in the bathroom, and also has the advantages of rich modeling, space saving, heat preservation, etc., but it is higher, and consumers can refer to the following methods when installing the overall shower room:

    1. Install the basin first to ensure that the basin is waterless, otherwise it will affect the next installation, and when the basin is connected to the pipeline, it is necessary to pay attention to its firmness to prevent water leakage.

    2. Adjust the position of the hose according to the need, check it with water to ensure that the water can flow away normally, and then carry out a perforation operation to fix the aluminum material against the wall.

    3. Insert the jujube particles and other components of the rock bench for fixation, fix the aluminum strip on the wall, and then fix the glass at the place where the bottom basin is drilled, and connect the pipe jacking.

    4. Install the movable door, do a good job of waterproof fixing between the glasses, and put glass glue on the places that need to be sealed and fixed.

    5. Ensure that the installed shower room is waterproof, drains smoothly and can be used normally.

    In general, when the space is large enough and the budget is sufficient, the overall shower room is also a good choice, and you can pay attention to the above matters when installing.

  6. Anonymous users2024-02-07

    1.The size of the shower room must be designed before installing the shower room. The location of the embedded holes, the design of the water supply system and the drainage system should be pre-set before installation.

    Secondly, the shower room needs electricity, wiring, leakage protection switches and other equipment, which should be considered as soon as possible to avoid rework. Finally, in addition to the hard decoration of the bathroom, the soft decoration is also very important, and the style of the shower room to choose depends on the layout and style of the bathroom. Common shower rooms are diamond-shaped, straight, arc-shaped, etc.

    For smaller spaces, the diamond shower room is easy to use and the door opening method saves space. If the renovation budget is low and the space is long, it is more comfortable to choose a straight simple shower room.

    2.After the installation position of the shower room is determined, the chassis is installed, assembled, and placed in the corresponding installation position. It was found that there was a problem of water accumulation at the bottom, which was caused by the tilting of the bottom basin during installation.

    So after placement, check whether the bottom basin is flat according to the horizontal line. After fully adjusting the position of the bottom basin, connect the water pipe and test the water. If there is a water leak or a blocked sewer, it should be solved in time before the next installation.

    Mark the corresponding wall location at the opening in the aluminum wall, drill a hole in the marked position with an electric drill, the hole should be slightly larger than the bolt or diameter, and drive the bolt into the hole.

    3.Finally, use fastening screws to lock the aluminum alloy frame on the stone base. Nowadays, many shower room manufacturers have decorative covers with fastening screws for the sake of aesthetics, so that the overall style of the bathroom is coordinated.

    Insert the sealing strip into the gap between the glass and the frame on both sides, clamp the tempered glass, and lock the drill bit in the position of the inner hole of the bottom basin; Install the sliding door and handle, assemble it, seal it with glass glue, then connect the hot and cold water pipes, and finally drain the water to check whether the water supply is normal, and then carry out the waterproof test again. If there is no leakage or blockage, the shower room is installed successfully.

    4.Debugging and fastening: check whether the parts are comfortable and smooth to use, and adjust them in time if problems are found.

    After adjustment, tighten the corresponding screws to make the whole shower room more firm. The shower room needs to be decorated later before it can be installed, but the water retaining strip of the shower room should be embedded with floor tiles when laying tiles, so as to achieve a good water retention effect. After the installation of the shower room is completed, the entire shower room needs to be wiped clean with a rag, and it is best to let the shower room stand for 24 hours before use.

    The shower room also needs to be cleaned and maintained frequently during use, so as to ensure that every bath is a warm enjoyment.

  7. Anonymous users2024-02-06

    When installing, we must do the corresponding waterproof measures, the ground must be flat, and the floor drain must be installed, and the wiring in the shower room must be best protected to avoid serious leakage, and the switch device should also be placed in a specific position and designed in advance.

  8. Anonymous users2024-02-05

    Before installation, we must measure the size, determine the floor area, make a good plan, do a good job of dry and wet separation, and install it very firmly.

  9. Anonymous users2024-02-04

    Before installation, it is necessary to pay attention to the treatment of wall seepage, drainage and floor drainage, and ensure safe use during installation.

  10. Anonymous users2024-02-03

    First, the installation of the shower room method.

    1. Prepare the necessary tools to use. Install the basin: Assemble the basin parts, adjust the level of the basin, and ensure that there is no water accumulation in the basin and at the bottom of the basin. The hose expands and expands with distance, connecting the basin floor to the floor drain securely.

    2. Test and protection: After installation, it is necessary to test the water to ensure that the water is unimpeded. Fourth, find a position, punch:

    Use a pencil and a level to determine the drilling position of the aluminum against the wall, and use a percussion drill to punch the hole. Install the aluminum: Hammer in the rubber particles at the drilled hole and lock the aluminum strip to the wall with screws.

    3. Fixing the glass: clamp the glass and lock it at the hole in the bottom basin, and then fix it with screws.

    4. Install pipe jacking: find the corresponding position above the fixed glass and drill holes, install (straight and bevel) fixing seats and connect the pipe jacking. It is fixed to the top of the glass with a bent sleeve.

    Installation of the shelf: Install the Zenbi shelf in the right position, tighten the shelf nut, fix the shelf glass, and keep it vertical and horizontal. Pay attention to waterproofing under the aluminum material that holds the glass in place.

    5. Install the movable door: install the hardware of the movable door and install the hinge at the reserved hole of the fixed door. After installation, adjust the position of the shaft core of the lotus leaf until the door feels the best.

    Do a good job of waterproofing: Install suction strips or water-retaining adhesive strips on the side or under the glass as required. Use silicone to make tight joints between aluminum and the wall, glass and basin.

    6. Debugging and fastening: check whether each part is comfortable and smooth, and adjust it in time if problems are found. After adjustment, tighten the corresponding screws to make the whole shower room more firm.

    7. Finishing work: Insert the decorative aluminum strip into the aluminum material attached to the wall to ensure that its appearance is neat and generous. Finally, wipe the entire shower room clean with a rag.

    2. Precautions for installation of shower room.

    1. The embedded hole of the shower room should be designed before the bathroom is decorated. It is best to have a custom-made shower room with a water supply system and tiles installed. Wiring leakage protection switch devices, etc. should be considered before installation in the shower room to avoid rework.

    The style of the shower room depends on the layout of the bathroom, and the common ones are corner type and straight line.

    2. When installing the bathing room, it should be installed in strict accordance with the assembly process. The shower room must be firmly connected to the building structure and must not be shaken. The open shower room must be fixed with expansion bolts, fixed with a non-hollow wall, and drained, with no more than 500 grams of water in the bottom basin.

    The appearance of the shower room after installation should be neat and bright, the sliding door and the sliding door should be parallel or perpendicular to each other, the left and right symmetry, the sliding door should be opened and closed smoothly, without gaps, no water seepage, and the shower room and the bottom basin should be sealed with silicone.

Related questions
15 answers2024-06-28

The following three points should be paid attention to: 1. In order to ensure the smoothness of the overall shower pulley, lubricant or peanut oil can be added appropriately. 2. When the pulley of the track-type shower room is loose or falling off, it is necessary to find maintenance personnel in time to adjust it to ensure that the pulley is effectively bearing the movable door, and then use a paper towel dipped in peanut oil to clean the foreign matter in the track to ensure smooth sliding; Avoid hitting the movable door too hard to avoid causing the movable door to fall off. >>>More

14 answers2024-06-28

Custom-made shower rooms need to pay attention to the following points: >>>More

3 answers2024-06-28

Top 10 famous brands for your reference.

1 Deli shower room (shower room top ten brands, shower products large-scale production enterprises, Zhongshan Deli sanitary ware). >>>More

5 answers2024-06-28

1. Consider how to open the door. The door opening method is generally divided into external opening, casement opening (sliding left and right), and internal opening. Generally, when the door is opened, it occupies a large space, and the actual area should be considered to be sufficient. >>>More

13 answers2024-06-28

1. Tool removal method.

Glass water, watering can, scouring pad, glass scraping and rubbing with a watering can to replenish glass water at any time. Among them, if the scouring pad can be replaced with a sponge with better water absorption, the effect is better. Because it doesn't take much friction to remove scale, as long as the glass is full, the scale is very easy to dissolve. >>>More