When dividing the construction section, the following points should be taken into account:
The boundary between the construction section and the structural boundary of the construction object (temperature joint).
settlement joints and building units, etc.), as consistent as possible;
The amount of labor consumed on each construction section is as close as possible;
The number of sections divided should not be too much, so as not to extend the construction period;
There should be enough working surface for each construction process;
1. Factors to be considered before compilation.
It needs to be based on the location of the project, the type of project, and the bidding documents.
Contract documents, design documents, on-site conditions, relevant specifications, the company's production capacity, technical strength and mechanical equipment, and the selection of the implementation plan.
2. Factors to be considered in the preparation.
When the construction organization design plan is specifically prepared, the following elements should be considered:
1 Basis for compilation.
2 Project Overview.
3 Construction deployment.
4 Construction schedule.
5. Construction preparation and resource allocation plan.
6 Main construction schemes.
7. Layout of the construction site.
8 Schedule Management Plan.
9 Quality Management Plan.
10 Safety Management Plan.
11 Environmental Management Plan.
12 Cost Management Plan.
13 Other Management Plans.
Contract Management Plan.
Information management. Plan. Communication management plan.
Risk management plan.
Closure management plan.
Green Construction Management Plan.
New Technology Application Management Program.
-
That is, the precondition, so the condition needs to meet the result.
-
Answer]: c The construction schedule includes: time scheduling plan, resource requirement plan, and construction preparation plan.
-
Answer]: According to the construction characteristics and process flow of the project, the organization of the project construction can be divided into: Sequential construction, which is to decompose the proposed project into several construction processes, and complete each Shizhong Jinggong process in turn according to the process order.
The amount of resources invested per unit time is small, which is beneficial to the organization of resources. Parallel construction, it is the organization of multiple professional teams of the same type, at the same time, on different working faces in accordance with the construction process draft, and at the same time to complete the construction of each construction object (building). The amount of resources invested per unit time has increased exponentially, which is not conducive to the organization of resources, and the project cost has increased.
Flow construction, it is to decompose the proposed construction object (building) into a number of construction processes, and set up the corresponding professional team in accordance with the construction process, each professional team completes the construction process of each construction object (building) in turn in accordance with the construction sequence, and ensures that the construction is continuous, balanced and rhythmic in time and space, and enables the two adjacent professional teams to maximize the overlap construction. The resources such as labor and machinery and equipment invested per unit time are relatively balanced, which is conducive to the organization of resources.
1. Any party claiming the existence of a right or legal relationship only needs to bear the burden of proof for the legal facts that give rise to the right or legal relationship, and does not need to bear the burden of proof for the fact that there is no obstacle to the occurrence of the right or legal relationship, and the burden of proof for the existence of facts that hinder the occurrence of the right or legal relationship shall be borne by the other party. >>>More
Air transport has the advantages of fast speed, low investment, not limited by local terrain conditions, and can carry out long-distance transportation, but also has the disadvantages of small carrying capacity, high transportation cost, and susceptibility to climatic conditions, and is suitable for long-distance passenger transportation and high-grade, foreign trade goods and urgently needed goods transportation. >>>More
The main considerations: 1. Whether the innovation of the channel can support the sales contribution. 2. Whether the channel is sustainable. 3. Whether the characteristics of channel competition can match the company's own advantages. 4. Whether the channel is reproducible. 5. Whether the mode of channel cooperation is exclusive.
Not to mention the risks of quality and safety in the construction process, in fact, the biggest risk is the capital risk, and the construction unit has no money is the biggest risk.
The basic way of flow construction.
First, wait for the rhythm of the flow of construction. >>>More