How to deal with the wall of the rough room? What is the process? Is it to approve the wall first, a

Updated on home 2024-06-29
7 answers
  1. Anonymous users2024-02-12

    The construction process of the blank house is as follows: first check whether there are cracks in the house, hollow a large area, determine the location, and then roll a layer of hardener on the wall (function: mainly to solidify the cement sand of the wall to prevent loose cement sand from falling off in the future), and then treat those cracks, and then touch the putty 2---3 times, and then polish and paint.

  2. Anonymous users2024-02-11

    First batch mortar, then putty powder (all over. If you want to be pretty, then paint the wall, and if you want to be pretty, make LCD wallpaper.

  3. Anonymous users2024-02-10

    1.Anti-crack treatment. 2.Leveling. 3.Scrape putty. 4 dozen sandpapers. 5.Roll coating.

  4. Anonymous users2024-02-09

    The original walls of the rough house were cement walls! The process is not completed in one or two! Let me talk about it briefly!

    One. Clean the original wall and apply plaster once or twice.

    Two. Full wall patches or mesh tapes.

    Three. Scrape putty, two to three times, four. Smooth with sandpaper!

    Fifth, clean the wall, brush the wall primer, and polish and level locally.

    Sixth, paint the wall, once or twice! Looking for the corner, my suggestion is that the first few processes still have to find a professional master to do, and when you paint the wall, you can try it yourself under the guidance of a professional master!

    Finally, I wish you a long decoration!

  5. Anonymous users2024-02-08

    Most people will choose a rough house when buying a house, which is cheap and can be decorated in their favorite style. When decorating the walls of the rough house, some people want to paint directly. In fact, it is not possible to paint the wall of the blank house directly, and the wall must be treated first.

    It is not possible to paint the wall of the rough house directly, and the wall needs to be treated first, otherwise the effect will be very poor.

    Wall Treatment Process:

    Step 1 Check.

    Situation 1: Cement wall. Comprehensively check whether the cement wall that needs to be painted in the blank room is solid and smooth.

    If the plastering layer on the wall is not strong enough or there are large cracks and holes, it is advisable to complain to the developer or the property and ask it to be redone. Individual holes can be filled with plaster if repaired by yourself. If the flatness of the wall is poor (the error is greater than plus or minus 5mm), then it should be considered to do plaster leveling first.

    Situation 2: Putty wall. Be sure to check whether the wall putty is qualified water-resistant putty, if not, you must shovel off and redo the water-resistant putty. Other projects are the same as in case 1.

    The process of brushing latex paint:

    1.First use water to mix latex paint, the proportion of water added to the roller coating is generally controlled to 20% to 30% according to the volume ratio is the appropriate ratio, if there is too much water, it is easy to cause poor film formation of latex paint.

    2.Stir the paint and water evenly and then stand for 20 minutes to achieve the purpose of defoaming, so as to avoid needle holes or small bubbles after the latex trace shed is painted on the wall.

    3.Still time passes. It's time to paint. Then moisten your tools with water, such as the wool brush and roller at the corner of the shade, first moisten with water, and then dip the material. The next step is painting.

    4.Latex paint is painted according to the standard process, which is applied in a bottom-to-bottom and two-sided way.

    1) first brush the primer to close the alkalinity and increase the mechanical bite (adhesion) of the bottom coat, the painting process is the living room and then the bedroom, the top plate (ceiling board) and then the wall.

    2) If you feel that the wall is not delicate enough, you can also gently remove some small particles on the wall with water sand before brushing the second topcoat.

    3) After each painting, the interval is 2 to 4 hours before painting, or you can feel it with your own empty fingers, if the paint surface pressed with your fingers does not feel sticky (acupressure dry), then it means that you can paint.

    4) The position of the switch box and door cover and window cover should be covered with masking paper before painting. Masking paper can be bought together with a roller and a wool brush.

    The wall surface of the blank room before direct painting is treated, so that it can be more convenient when painting, and the treatment effect of painting will be better. There is a lot of knowledge about wall painting, and when you want to paint the wall when you do decoration, you should find a good decoration master to complete it for you.

  6. Anonymous users2024-02-07

    With the development of society step by step, in the process of decorating a new house, the wall is very important. Many first-time decorations are not so familiar with the painting process and wall requirements. So today, I will answer it for you.

    Friends who want to know may wish to share it with us. So, let's take a lookRough house wall paintingWhat are the requirements for passing over Li or Cheng?

    1. Wall restoration.

    Rough house wall paintingBefore you start painting your walls, be sure to clean the walls that need to be painted. If there are irregularities and irregularities, fill them with cement grout to keep the wall clean and smooth. In order to carry out leveling work on the wall, you can make a disturbance with plaster dust to make people.

    2. Putty. Rough house wall paintingThe putty wall is applied three times, and the thickness of the putty must not be greater than 3 mm after three times, otherwise, the wall will be prone to cracking and sagging.

    3. Wall polishing.

    Wall sanding should be done using fine sandpaper. If we use too thick sandpaper, it is very easy to leave sand marks, and even affect the beauty of the walls of the house. There is another important step in the process of polishing the surface of the wall.

    After polishing the wall, we must clean the surface of the wall. Otherwise, there will be too much powder, which will easily affect the adsorption of the coating.

    4. Primer. The next step in painting the walls of the rough house is to apply the primer. Pay attention to the balance of the primer when applying the primer. Make sure that every place can be brushed to make the walls smooth and flat.

    5. Finish brushing. Rough house wall paintingAfter the primer is finished, brush the finishing layer. When using the topcoat, do not add too much water, otherwise it will affect the concentration, thickness, hardness and feel of the paint film.

    Summary: This isrequirements for the process of painting the walls of the blank house, provide a small number to share with you, I think there is a corresponding understanding after reading the sharing upstairs, I hope the above sharing can help all, if you need more information to continue to ******, will reply one by one.

    You can get it for free

  7. Anonymous users2024-02-06

    When the rough room is decorated, each process is very complicated, and it must be strictly in order. So what are the steps of painting the walls of a rough house? Let's find out together!

    What are the steps of painting the walls of a rough house?

    1. First of all, the wall base should be cleaned.

    2. Brush the interface agent, and the coating should be uniform when digging auspicious; The interface agent is to enhance the adhesion of the base layer, which can avoid the hollowing and shelling of the plastering layer.

    3. If the kitchen and bathroom need to paint the wall, then it needs to be waterproof and coated with waterproof coating.

    4. If there are cracks on the wall, the cracks need to be dealt with before the paint is shut, and materials such as kraft paper, mesh fiber cloth or bandages can be pasted on the cracks.

    5. After the wall base is treated, brush the putty, and pay attention to the deployment should be carried out in strict accordance with the product instructions.

    6. After the putty is brushed and dried, polish it with sandpaper, start from all sides when grinding, be careful at the corners, and not miss the grinding or grind the putty through; After sanding, the floating dust should be cleaned up.

    7. Brush the primer after polishing, the primer is to close the base layer and improve the fullness, but it should be evenly painted during construction.

    8. Finally, brush the topcoat, polish it with sandpaper after the primer is dry, and then brush the topcoat, and the paint needs to be brushed twice; Pay attention to the amount of water when mixing the topcoat, not too much, otherwise it will affect the hardness of the paint film.

    What are the precautions for painting the wall?

    1. Pay attention to the weather conditions before construction, and paint the wall should not be carried out on rainy days.

    2. When painting the wall, pay attention to the brushing method, which should be vertical from top to bottom; It can also be smoothed by horizontal brushing, but care should be taken not to miss the brush.

    3. Keep stirring when brushing lime slurry, otherwise there will be stripes of different shades.

    4. There will be dust dripping when painting the wall, so pay attention to the finished product of the house and do a good job of protection.

    5. The putty will become solid after brushing, and it will be polished on the second night of the wall, and its flatness should be checked.

    6. After the completion of the overall process, it is necessary to carry out acceptance and check whether the wall is smooth and whether the color is uniform and seamless.

Related questions
11 answers2024-06-29

Wall smudge treatment:

The white wall at home is most afraid of a dirty spot, and it is also difficult to remove the marks accidentally scratched by a pen, stainless steel device or pencil, which will affect the appearance. Use the old housekeeper wall cleaner on it, and then take a damp rag and wipe it off. >>>More

11 answers2024-06-29

Before we carry out the renovation of the rough house, we need to accept the rough house delivered by the developer, and only then can we continue to carry out the next rough house decoration under the condition of ensuring that there is no problem with the preliminary acceptance. When decorating, we also need to pay special attention to the overall pattern, the transformation of water and electricity, the experiment of waterproofing, and the creation of some software facilities such as tiles and carpentry. >>>More

8 answers2024-06-29

What are the precautions for receiving a rough house? There are three issues to be aware of, especially the first point, which must not be forgotten.

9 answers2024-06-29

The first step is to check the route of the hydropower project in the room to see if the appliances you purchased are paired, and it is best to consult the hydropower installation so that he can help you update and transform. In case the problem is discovered after installation, it will be more troublesome to deal with. It is said that the rough room is also known as the "initial decoration room", generally there is only a door set in the room and no door, and the bottom edge of the wall is just a basic treatment, but the public location, public facilities, all kinds of water supply and drainage, drainage pipes, precipitation, radiators, boiling water and other pipelines are assembled in accordance with the design documents. >>>More

11 answers2024-06-29

wall decoration. At present, there are mainly these methods: >>>More