What are the precautions for receiving a rough house? There are three issues to be aware of, especially the first point, which must not be forgotten.
-
1. If it is on the top floor, see if the roof has leaked;
2. Whether the main switch of the electric switch and the leakage protector are complete; Whether it is formal electricity and whether it is turned on or not, and some are zero-hour electricity; If there are local sockets, try to see if they are installed correctly and available (there is a special socket circuit inspection instrument); Bring a pen and socket circuit inspection equipment.
3. Water. tap water, hot water, reclaimed water (if any), whether it is connected, whether the water pressure is enough; whether the pipeline is leaking; whether the temperature of the hot water is enough; whether all switches are available;
4. Heating (after moving in, we will pay this year, that is, in winter), gas. Whether it is connected or not, the reading base of the table should be zero. Whether the radiators are complete, the rough room should generally be brought.
5. How many door keys are there? Whether it works well (try to turn all the keys on and off). Whether the door is damaged, warped and deformed, and whether the switch is flexible. Whether the cat's eye is available. Figure it out and do a good handover.
6. The property fee can be paid, but the time limit must be indicated. The decoration deposit will be paid when the decoration is made. Electricity bills, according to meter readings, are only paid after the delivery date.
7. Anti-theft intercom, visual system, whether it is intact and available (also give it a try);
8. Whether broadband and ** lines are available and available (it is best to give it a try), with ** machine;
9. Whether the window is tight, whether there is water leakage, and the inside of the window sill should be 3-5mm higher than the outside (otherwise the water will flow in); whether the opening is flexible, whether the switch is intact and usable;
-
Precautions for the delivery of rough houses: (1) First check the developer's "Residential Quality Assurance Certificate", "Residential Instruction Manual", "Construction Engineering Quality Certificate", "Real Estate Development and Construction Project Completion Comprehensive Acceptance Certificate" and "Completion Acceptance Record Form". (2) Inspect the house first and then go through the procedures.
3) Verify the size of the house. (4) Acceptance of housing quality.
-
1. We must not ignore some vacant structures, especially pay attention to the size, and see what can be used in the future, for example, this gap in the kitchen is not enough to place the refrigerator, it is very embarrassing.
2. Carefully check the drawings to see if the location of important facilities has changed, and the changes should be recorded; The location of the wire box design should have been above the wall, but the construction party made changes, and it is difficult to clarify the responsibility in the future without modifying the design.
3. First of all, you should check whether the water supply and drainage pipes are smooth, open the faucet to release water, see if there is any leakage in the sewer, and then look at the water pressure to observe whether the drainage speed is ideal.
4. Take a cup of water under the faucet, pay attention to observe whether there is rust, if you think that there is a problem with the quality of water supply, you can ask the developer to provide the water quality inspection certificate issued by the epidemic prevention department.
5. Observe whether the location of the water supply and drainage pipes is reasonable, whether there are traces of water seepage around, and the leakage will usually leave stains on the wall, which can be found as long as you check carefully.
6. The total power consumption capacity of the household generally has a limit, and "dual power supply, lighting, power system splitting" is the most basic requirement, which should be reflected in the circuit layout of the distribution box.
7. To check the fully decorated room, do the power off experiment, first pull down the main gate to see if the power is completely off indoors; Then close the opening gate separately to see if the branch lines are fully controlled.
8. It is necessary to check whether there is electricity in the lamp head and socket of each house, and whether the socket, broadband socket, TV antenna socket and emergency socket are accurate and smooth, and if necessary, you can cooperate with the developer to inspect together.
9. The outdoor unit of the air conditioner shall be reserved on the outdoor side of each main hall, the air conditioner shall be reserved for pipeline holes, and the fully enclosed space shall be reserved for the air-conditioning pipeline channel.
10. Gas pipeline: Under normal circumstances, the gas pipeline should be open pipe, so that once there is a gas leak, it can be found in time, which is convenient for maintenance and does not leave potential safety hazards.
11. The construction quality of the acceptance of the sky, the earth, the wall, the ground and the wall will be directly reflected from the various surfaces of the house, which has a great impact on the beauty and function of the house. There will be many details to pay attention to in the acceptance of "sky, earth and wall". First of all, to detect whether the ground is flat, professionals are using a level, you can use a table tennis ball instead, put the table tennis ball on the ground, if the table tennis ball rolls around, the ground is more serious.
12. Pay attention to see whether the corner line of the wall is straight, whether the wall is smooth, whether there are cracks, if you find it, you must figure out whether it is a structural crack in the house, it is best to call the developer to check and deal with it.
-
Many people spend their lives trying to buy a house, so the meaning of a house for everyone is extraordinary. When buying a house, it involves a very important issue, that is, the acceptance of the rough house, there are countless precautions for the receipt of the rough house, and it may lead to a big mistake if you are not careful, and follow-up problems occur frequently, so what are the precautions for the receipt of the rough house? What are the tips for the acceptance process?
The following is an explanation of the acceptance door frame, infrastructure, and whether the ground is flat in the precautions for receiving the rough house.
The first thing to pay attention to in the rough house is the door frame, see if the door frame is strong, and then we need to pay attention to his public area, such as various plumbing facilities and other things.
The first thing we should pay attention to when conducting a rough house inspection is to check whether the facilities of each part are in good condition, including door frames, lacquer surfaces, door locks, cat's eyes, door shafts and doorbells, etc., which are all items that we must carefully accept. If these are all eligible, it also indicates that the acceptance of the rough house is nearing the end.
In addition, when conducting a rough inspection, special attention is paid to the installation of public infrastructure, water, electricity, floor heating, and underground pipes, all of which should be done in accordance with the contract.
In the rough house inspection, the wall and the ground are the area that is the precautions for the rough house to pay special attention to. Because the wall surface is uneven, it will be very unsmooth when decorating in the future, and it will also affect the tiling or floor laying in the future. If there is a protrusion in the kitchen and bathroom area for no reason, it is easy to fall off in the process of tiling or other decorations in the future.
The reason why the owner is easy to be negligent in the process of accepting the rough house is also because the precautions for the rough house are very many and messy, although it is excusable, but I still hope that everyone will be cautious in the process of accepting the rough house, and lay a layer of quality assurance foundation for the gorgeous decoration in the future. In this way, there is no need to worry about causing deep-rooted and irreparable problems in the future life process, and improve the user's living comfort and experience.
-
1. You should look at the outside first.
Inspect facades, exterior tiles and paints, unit doors, stairways.
2. Then check the inside.
Inspect the entrance doors, doors, windows, ceilings, walls, floors, wall tiles, floor tiles, water supply and discharge, waterproof water storage, strong and weak electricity, heating, gas, ventilation, smoke exhaust, and exhaust air one by one.
3. The last measurement is adjacent.
Problems such as closed water storage tests and water meter idling must be coordinated with upstairs and downstairs neighbors.
Second, the details of the inspection of the rough house when the house is closed.
1. Test water and electricity.
First of all, check whether the readings of water and electricity meters are normal, and if there is a situation where the number is too large, it must be dealt with in time.
When testing the circuit, the general home decoration will involve the strong current box and the weak current box, to see whether the strong and weak current box installation meets the national norms and standards, whether the distance is more than 1 meter, otherwise it is easy to cause signal interference.
When inspecting the waterway, we should pay attention to whether the waterway is smooth, you can take a bucket of water, pour it into each floor drain, and see if the drainage is blocked.
2. Check doors and windows.
To inspect doors and windows, we must first see whether the glass of the doors and windows has the "CCC" mark, check whether the sealing strips of the doors and windows are intact and undamaged, whether the glass is damaged, whether the switch is smooth and other details.
3. Check the flatness of the wall.
Use a ruler to stick to the wall and check the flatness of the wall, and the general gap is reasonable within centimeters. Also, pay attention to the verticality of the yin and yang corners in the room.
4. Check the squareness of the room.
This is relatively simple, you can easily use a tape measure to measure the diagonal of the four corners of the room, and generally the error of the length of the two diagonal lines within 5 cm is qualified.
5. Check the hollow drum on the wall.
Check all the walls with a hollow drum hammer, note that there can be no more than two hollow drums in a room, and at the same time, you also need to check the floor that needs to be tiled so that it can be repaired in time before decoration construction.
-
1. Doors and windows.
2. Kitchen and bathroom waterproofing, do water avoidance test.
3. Heating, gas and water pipe pressurization test.
4. Whether the drainage is smooth (almost every project has the phenomenon of blocking the drainage pipe due to construction garbage) to avoid blocking and overflowing after decoration.
That's all.
-
1 Check all outlets Friends who don't have a pen can take a charger and a three-phase connector socket. The charger can check the two-phase socket, and the three-phase connector can check the three-phase socket.
2 Check all windows Check the glass: The glass can't have scars, every piece we buy is a commodity, we must check it carefully, otherwise it is ourselves who suffer. Don't think it doesn't matter if there's a small scar on that big piece of glass, think about if you're buying a mirror, you definitely don't want a mirror with a scar.
Check the window screensMany of the window screens are torn or have large scratches on them. Check whether the window touches the wall when it is opened, and the wall is easy to destroy.
3 Check the ** line, the ** line of the broadband interface and the broadband panel are not of good quality, and it depends on whether they are fixed firmly!
4 Check whether the radiators and balcony guardrails are firm.
5 Check every light and switch.
6 Check every faucet.
7.In judicial practice, if the buyer does not raise any objection when receiving the house, it will be deemed that the buyer has waived the right to dispute the area.
8.Pay attention to the window hinges and water pipes, there are a lot of problems After the house is ready for use, the developer will deliver the house to the buyer, which means receiving the house for the buyer.
Decoration half package refers to a decoration method in which the owner purchases decoration materials by himself and the decoration company is responsible for the construction. When choosing a decoration half package, you need to pay attention to the following aspects. >>>More
If you want to talk about the precautions for renting a house online, I have been floating outside for a while, and I have basically experienced a hundred battles. >>>More
More than 40% of domestic tourists have used the ** BBS forum to obtain travel information. After the outbound tourists visited the financial asset trading hall today and listened to the explanation of financial expertise, the control center of the rail transit line currently operating outside the country has all been connected to the command center. Today's first opening activities of the Beijing Rail Transit Command Center mainly include: >>>More
Nothing else, mainly waterproof. Because this matter of survival is very troublesome.
With the rise in housing prices, many urban white-collar workers choose to buy relatively compact houses. In order to increase the space of the house, many people also choose to put the balcony. >>>More