Although it is a self-built house in the countryside, it is definitely necessary to consider the quality of construction, and now the usual practice is to pour reinforced concrete ground beams, and then the wall is cement mortar.
Brickwork. It is worth mentioning that now more and more farmers, if they build their own one- and two-storey, homesteads.
The whole foundation soil quality is uniform, the degree of compaction is appropriate, the foundation does not exist half of the foundation is hard, half of the foundation is soft, and then use a long steel rod to explore the foundation under the void, no mud, directly use solid standard red bricks to improve the height of the foundation is the best.
<> in rural areas, many people now go back to the countryside to build new houses when they earn money outside. The so-called fallen leaves return to the roots, there must be a place to retire when you are old, and the housing prices in a city are also high, and the farmers in the sector still can't afford it. Cement mortar leveling is a very good remedy for indoor decoration and suitable for interior decoration, but this method also has disadvantages, that is, the leveling thickness is too thick and the ground is best to choose cement mortar, because the strength is enough.
I renovated my home some time ago, and the bedroom was leveled by the bricklayer master, but some places were high and some of them were depression. The ground is uneven and cannot be attached to the wooden floor, so putty powder is used intelligently.
The uneven area was repainted.
Floor tile floors do not need to be ignored by uneven floors. Because the dry paving method itself will have a leveling process, simply put, it is to use 1:5 dry cement mortar to level the ground first, and then lay bricks.
As an intermediate structure connecting the soil foundation and the house, the most common foundation for building houses in rural areas is the strip foundation.
Independent foundations, well foundations, raft foundations.
Pile foundations. If you want to raise the foundation by one meter for self-built houses in rural areas, what kind of foundation is cost-effective? The village self-built house wants to raise the foundation by one meter, and I personally recommend using a cushion platform.
Foundation. Here this friend said that if you want to raise the foundation of your house by one meter, what kind of foundation is it cost-effective? I think:
A one-meter-high foundation is not low, and it should be built with hard reinforced concrete. For example, you need to build three floors. If the geographical location is low, then if you want to solve the problem of dampness, you must raise the foundation by more than one meter or less than one meter, and develop NCMS according to the orientation and suitability for modernization.
The need for norms and elegance.
-
The method can be increased by adding cement mortar at the bottom layer, and then laying one or more layers of wooden boards on the cement mortar, and on the foundation wooden boards, the floor can be effectively raised by laying the floor normally. There is also a method is to play the keel, this method process is more cumbersome, the operation step is to lay the carpentry board on the keel, then lay the moisture-proof mat, and finally lay the floor. This method is complex and highly skillful, and is rarely used by ordinary families.
-
1. Raise the height of the floored room with cement: Raise the room with cement and dry it for a week or two. 2. Hit the keel to raise the height of the floored room.
Specific operation: keel + woodworking board + moisture-proof mat + floor. 3. Install the door stone (threshold stone) and deal with the door stone
The tile and the floor junction are installed with the door stone, and the door stone is connected to the floor to grind out an arc, and the height of the right angle of the door stone plus the thickness of the cement used to install the door stone is the height of the floor plus the floor moisture-proof pad. This makes it affordable and aesthetically pleasing.
-
Floored rooms can be heightened with cement. If you use cement to increase the height, you need to dry it for one to two weeks, and then lay the floor after drying, so that the height of the indoor floor will increase, which is a more common and easy to use method.
-
You can add a little more ash and spread it to your favorite height, and then choose your favorite floor, or if you want to change it back later, you can put a layer of things in the room and spread it neatly.
-
Scheme 1: Use cement to raise the height of the floor room The general treatment method is to raise the floor room with cement, which is very simple, it is the best and the most used method, but it takes a week or two to dry with this method. This treatment increases the height of the ground, so that the indoor height is reduced, if it is not much to elevate is OK, if it is a lot to consider it, if you change to other ground decoration materials in the future it is difficult to reduce the height.
Option 2: Hit the keel to raise the height of the floored room. This method is the most expensive and cumbersome.
Specific operation: keel + woodworking board + moisture-proof mat + floor. Woodworking board is indispensable, composite flooring is a lock assembly, can not be directly laid on the keel, otherwise the floor is unevenly stressed, a long time will affect the service life of the floor, more serious is the floor lock friction may also produce noise.
If the height difference is large and you are particularly concerned about the feeling of solid wood, you can consider it. Plan 3: Install the door stone (threshold stone) and deal with the door stone.
Install the door stone at the junction of the tile and the floor (used as a kitchen and bathroom door to block water, generally use marble), grind the door stone to the floor to the side of the arc, but leave the right angle of the floor height, the height of the right angle of the door stone plus the thickness of the cement used to install the door stone, is the height of the floor plus the floor moisture-proof mat. This is economical and aesthetically pleasing, and the connection between the tile and the floor is not very stiff. The cost is almost negligible.
-
1. Fill it with sand, pour cement, and then pave the tiles. (Convenient and fast, long service life, not easy to leak).
2. It can be made of wood, overhead and then raised. (It's complicated, but it's environmentally friendly and pollution-free.) )
-
You can add some space under the floor that you just used to raise the floor, or you can use sand and cement to raise the floor height.
-
First of all, when laying floor tiles, the foundation should be raised high, so as to ensure the height of the ground, and there will not be a feeling of too empty, so you should choose according to the size of your room.
-
It can be raised by creating a layer of wood on the floor of the room, or by filling it to change the height.
-
We can change the height of the ground by laying floor tiles. Then if you want the ground to be high, be sure to lay more cement.
-
The most straightforward way is to lay a wooden floor, because the thickness of the wooden floor is thicker than the usual floor, so that the height can be changed.
-
1. Use cement to raise the height of the flooring room, the general treatment method is to raise the floor room with cement, and the treatment is very simple;
2, the keel to raise the height of the floor room, this practice is costly, the process is cumbersome, the specific operation is keel plus woodworking board plus moisture-proof mat plus floor, woodworking board is indispensable, composite floor is a hail lock assembly, can not be directly laid on the keel, otherwise the floor is uneven, and the service life of the floor will be affected for a long time;
3. Install the threshold stone, deal with the door stone, install the door stone at the junction of the tile and the floor, and grind the door stone to the floor to make an arc, but the right angle of the floor height should be left, and the height of the right angle of the door stone plus the thickness of the cement used by the land source of the door stone is the height of the floor plus the floor moisture-proof mat.
-
1. Fill it with sand, pour cement, and then pave the tiles. (Convenient and fast, long service life, not easy to leak).
2. It can be made of wood, overhead and then raised. (It's complicated, but it's environmentally friendly and pollution-free.) )
-
Fill it with sand, pour cement, and lay tiles.
-
It can be raised with timber overhead.
-
Keels are laid with wooden floors or underfloor heating...
-
Tatami mats can be built, which is a great option to increase the height and increase the storage space.
Use a broom to clean the dust off the floor first, or use a vacuum cleaner to suck the dust away. Then prepare a bottle of 84 disinfectant and pour it into the water, according to the ratio of 1:100 to mix, the concentration should not be too high, and then pour the prepared 84 disinfectant into the watering can and spray it on the ground to disinfect. >>>More
1: In terms of the amount of personal home decoration, the carbonized wood that can be purchased can generally only be the size of the specification, because the carbonized wood is not like the floor has a groove, so the force can not be distributed laterally, and after carbonization, it will lead to a decrease in toughness and an increase in brittleness (reduced flexural strength), which means that in the case of keel pavement, a smaller keel spacing is required, or thicker and wider specification materials. This directly leads to an increase in costs. >>>More
In this case, you can consult with him, and then both parties can communicate.
If the interior floor tiles are rotten, you will definitely have to replace the floor with a new one if you want to design it more beautifully. Either you can update the floor for him, use stickers, or other things, and that's fine.
If the floor shrinkage joint is not reserved, the thermal expansion and cold contraction will explode, and the construction party has technical problems. >>>More