How to fill in the control values and proportions of the main technical indicators of the engineerin

Updated on Financial 2024-06-30
7 answers
  1. Anonymous users2024-02-12

    Design technical and economic indicators are generally divided into:

    Value Indicators vs. Physical Indicators. The former is an indicator that is reflected in the form of value, and the latter is an indicator that is reflected in the form of a physical object.

    Composite indicators and individual indicators. For example, the cost index of the former includes various consumption expenses such as raw materials, fuel power, depreciation, and wages, while the latter includes the output value provided by fuel and power costs per 100 yuan.

    Macro and micro indicators. The former is the standard for evaluation from the perspective of the national economy as a whole, and the latter is the standard for evaluation from the perspective of enterprise economy.

    Absolute vs. relative quantity indicators. The former is such as national income, total profit, etc., and the latter is such as the rate of return on output value, return on investment, rate of return on cost, etc.

    Aggregate and per capita indicators. The former is such as gross national income, etc., and the latter is such as per capita national income.

    Quantitative and qualitative indicators. The former is such as energy saving, resource saving, etc., and the latter is such as quality grade, high-quality product rate, pass rate, waste rate, etc.

    The three basic principles that should be followed in the design of technical and economic indicators are:

    Scientific. That is, the design of indicators must be consistent with the scientific meaning of the technical and economic categories, and the number of indicators should depend on the needs of the actual economic sector and the degree of perfection of theoretical research.

    Practicability. That is, the index design should be adapted to the level of economic development, planning level, statistical level, as well as the continuous development of the national economy, and the corresponding changes in technology and economy; For different engineering projects, different technical solutions, and different technical practices, the index design should be different and have their own emphasis.

    Comparability. That is, the index design should be carried out under the conditions of comparability in terms of statistical data, meeting needs, time, consumption costs, etc., and the incomparable factors should be transformed into comparable factors.

  2. Anonymous users2024-02-11

    m1 m2 The amount of broad money and the amount of narrow money.

  3. Anonymous users2024-02-10

    Including: space requirements, space scale, space combination, use mode, environmental protection, structural modeling, equipment system, construction area, project investment, construction cycle of a complete implementation of the project plan.

    Architectural design work is the initial stage of architectural design, which lays the foundation for preliminary design and construction drawing design, and is one of the most critical links for creativity. According to the analysis, the nature of architectural design has the following five characteristics, namely, creativity, comprehensiveness, duality, process and sociality.

    1. Architectural design is a kind of creative thinking activity, the architectural function, the location environment and the subjective needs are ever-changing, only by relying on the architect's innovative consciousness and creative ability, can we flexibly solve specific contradictions and problems, and materialize all the conditions, requirements, possibilities and so on into the architectural image, so it is particularly important to cultivate innovative consciousness and creative ability.

    2. Architectural design is a comprehensive discipline, and it is a very complex and comprehensive work. In addition to architecture itself, it also involves many disciplines such as structure, materials, economy, society, culture, environment, behavior, psychology, etc., and at the same time, the types of architecture are also diverse, which determines that the work of architects is like that of an orchestra conductor to take into account all aspects of the role.

    3. Architectural design thinking activities have a dual nature, which is an organic combination of logical thinking and image thinking.

    4. Architectural design thinking activities are a step-by-step process from shallow to deep. In the whole design process, it is always necessary to analyze and investigate scientifically and comprehensively, think deeply and boldly about imagination, select and optimize the scheme on the basis of extensive argumentation, and take the trouble to scrutinize, modify, develop and improve.

    5. Architectural design must comprehensively balance the relationship between the social benefits, economic benefits and personality characteristics of the building, and in the design process, it is necessary to grasp all kinds of relationships, meet the requirements of all aspects, and uniformly materialize the architectural space and three-dimensional image that respects the environment and cares for humanity.

  4. Anonymous users2024-02-09

    The architectural design outcome document includes the following four aspects:

    1) Conceptual Design:

    Explain the background of planning and design, the overview and analysis of the current situation of land use, the basis of planning and design, the planning objectives, the planning principles, the planning characteristics, and the planning layout; Classified planning instructions for roads, municipal facilities, landscapes, buildings, etc.; Construction cost estimation. Complete the analysis of the balance of planned land use and the analysis of economic and technical indicators.

    2) Project location analysis map:

    It reflects the spatial relationship between the development land of the project and the city and other functional areas, and explains the location and transportation relationship of the project in the city.

    3) Development land status map and current situation analysis:

    On the current topographic map, indicate the scope and area of the land and the setback red line. The main topography and current situation of the site were analyzed, and the suitability of different functions of each area and node was proposed.

    4) General plan: the scale is 1:500, including the spatial layout of the building group, the layout of public facilities, roads, parking facilities and greenery, etc.; It is also required to indicate the location and spacing of the buildings.

  5. Anonymous users2024-02-08

    The main contents of the completion acceptance report 1, the construction basis briefly describe the project feasibility study report approval or plan task book and the approval unit and approval number, the approved construction investment and project budget estimate (including the revised budget estimate), the specified construction scale and production capacity, the main content of the construction project lump sum agreement. 2. Project overview (1) Preliminary work and implementation of the project; (2) Huaiqin design, construction, general contracting, construction supervision, equipment suppliers, quality supervision institutions and other units; (3) The commencement and completion dates of each individual project; (4) The amount of work to be completed and the production capacity formed (explain in detail the reasons for the advance or delay of the construction period and the reasons why the production capacity is different from the original plan, as well as the countermeasures taken to ensure the implementation of the original plan during construction). 3. Initial inspection and trial operation The initial inspection time and the main conclusions of the initial inspection and the trial operation (the initial inspection report and the main test indicators of the trial operation stove should be attached, and the trial operation time is generally 3-6 months).

    4. Overview of the final accounts of the completion of the budget (revised budget estimate), budget implementation and preliminary final accounts, and the investment analysis of communication construction projects. 5. The sorting of engineering and technical files The major events in the construction of the project, the completion data of each single project, the acceptance data of the concealed project, the design documents and drawings, the supervision documents, the main equipment and technical data, and the documents in the construction of the project are sorted out and archived. 6. Economic and technical analysis (1) Test values and conclusions of main technical indicators; (2) Analysis of the quality of the project, and description of the situation after the treatment of the quality accident that occurred in the construction; (3) Construction cost analysis and main economic indicators, as well as the investment benefits obtained by adopting new technologies, new equipment, new materials and new processes; (4) Analysis of investment benefits, the proportion of fixed assets in investment, the direct income of enterprises, the analysis of the return on investment period, and the analysis of breakeven.

    7. Preparation for production The organization of the operation management department and the staffing of the production staff. Training and established operating rules and regulations. 8. Handling opinions for the finishing project.

    9. Preliminary opinions on the commissioning of the project. 10. Experience, lessons and suggestions for future work in engineering construction. The completion acceptance report refers to the written report formed after the completion of the project, after the special acceptance agency established by the relevant departments and the organization of experts to conduct quality assessment and acceptance.

    I suggest you take a look at this.

  6. Anonymous users2024-02-07

    1. Construction basis.

    The project plan task book and the approval unit and approval number, the approved construction investment and project budget estimate (including the revised budget estimate), the lump sum agreement of the construction project and other main contents.

    2. Project overview.

    1) Preliminary work and implementation of the project;

    2) Design, construction, general contracting, construction supervision, equipment suppliers, quality supervision agencies and other units;

    (3) The commencement and completion dates of each individual project;

    (4) The amount of work to be completed and the production capacity formed (explain in detail the reasons for the advance or delay of the construction period and the reasons why the production capacity is different from the original plan, as well as the countermeasures taken to ensure the implementation of the original plan during construction).

    3. Initial inspection and trial operation.

    The main conclusions of the initial inspection time and the initial inspection and the trial operation.

    4. Overview of final accounts of completion.

    Budget estimates (revised estimates), budget implementation and preliminary final accounts.

    5. Sorting out engineering and technical files.

    The record of major events in the construction of the project, the completion data of each individual project, the acceptance data of the concealed project, the design documents and drawings, the supervision documents, the main equipment and technical data, and the documents in the construction of the project are sorted out and archived.

    6. Economic and technical analysis.

    1) Test values and conclusions of main technical indicators;

    (2) Analysis of the quality of the project, and description of the situation after the treatment of the quality accident that occurred in the construction;

    (3) Construction cost analysis and main economic indicators, as well as the investment benefits obtained by adopting new technologies, new equipment, new materials and new processes;

    (4) Analysis of investment benefits, the proportion of fixed assets in investment, the direct income of enterprises, the analysis of the return on investment period, and the analysis of breakeven.

    7. Preparations for production.

    The organization of the operation management department, the staffing of the production. Training and established operating rules and regulations.

    8. Handling opinions for the finishing project.

    9. Preliminary opinions on the commissioning of the project.

    10. Experience, lessons and suggestions for future work in engineering construction.

  7. Anonymous users2024-02-06

    It is recommended that you consult the book "Regulations on the Depth of Preparation of Architectural Engineering Design Documents". It's very detailed inside.

    Hope it helps you solve your problem.

Related questions
8 answers2024-06-30

Volume I: General Part.

1. Bidding documents. >>>More

6 answers2024-06-30

The site and facilities of the kindergarten meet the standards stipulated by the construction department and the education department; Have an independent financial institution, separate bank accounts; There are sufficient funds for running the kindergarten and the funds required to maintain the daily education; There are normal teacher channels and teachers who meet the requirements of the educational administrative department; There are professional managers of preschool education in accordance with the provisions of the administrative department of education and preside over the daily management of kindergartens; There is a clear plan for running a kindergarten, including the objectives, principles and types of kindergartens, the object and scope of enrollment, the teaching staff and the educational curriculum and teaching materials in line with national regulations; There is a kindergarten name, the name of the kindergarten should reflect the characteristics of nationality and children, and the name shall not contain words that are inconsistent with the actual situation or are easy to mislead.

12 answers2024-06-30

Registered personnel refer to those who participate in the unified examination or assessment of the People's Republic of China, obtain a practice qualification certificate, and register in accordance with the provisions to obtain the corresponding registered practice certificate. >>>More

6 answers2024-06-30

Architectural acoustics is the foundation of sound engineering, and electroacoustics is the core of sound engineering. It can be considered that sound engineering technology includes electroacoustics, architectural acoustics, psychoacoustics and some of the contents of the first science, which emphasizes the auditory experience of the final sound, and it studies the whole process from the production of sound to the auditory feeling produced by sound. >>>More

1 answers2024-06-30

My dream is to be a designer, because my mom and dad are both in the construction industry. Sometimes when my parents are at work, they take me with them. When I first went there, there was still a ruin outside my mother's construction site, but after a year or two, it became a high-rise building. >>>More