How are the steps for the renovation of a new house arranged?

Updated on home 2024-07-16
8 answers
  1. Anonymous users2024-02-12

    Step 1: Pre-design.

    The house is the harbor where we anchor after a day's journey, it occupies an extremely important place in a family, and it is also the soul of the steps we begin to decorate the house, which directly determines the final shape of the house. Therefore, a good upfront home design is crucial.

    Step 2: Demolition and alteration of the main body.

    This step is preceded by a complete and detailed survey of the house. The main demolition and renovation of the house is to build a frame first, so that a rough model framework will appear in the home we designed.

    Step 3: Detail transformation.

    When the frame appears, we need to fill it in, but the so-called filling is not to move household appliances in a hurry, but to renovate water and electricity lines, apply tiles, and paint walls. It will be easier to deal with these first, and then install appliances such as range hoods. Once the kitchen tiles are pasted, you can move on to painting the walls and painting the furniture.

    Step 4: Kitchen, door, floor.

    After the previous steps of decorating the house are completed, we can carry out the kitchen and bathroom ceiling, cabinet installation, and wooden door installation. After the door is installed, the floor can be installed in one day. Generally, after the house is cleaned up and the floor is installed, you can put wallpaper on the wall when it is clean.

    Step 5: Install radiators, lamps, and sanitary ware.

    This part of the steps for decorating the house is relatively simple, if you want to arrange it yourself, you can also do it, when these installations are completed, you will find that you really feel a little home.

    Step 6: All kinds of furniture and electrical appliances enter the site.

    The choice depends entirely on which style is chosen, but it is worth noting that the key to the choice is to look at the material, quality, and whether it meets the standards, after all, health is the most important thing.

  2. Anonymous users2024-02-11

    In general,Renovation steps for a new houseIt can be simply divided into house design, water and electricity renovation, heating renovation, carpentry, masonry, painting, flooring, lighting installation, hardware installation and so on.

  3. Anonymous users2024-02-10

    1. Demolition and reconstruction of the main body. The main demolition and renovation is the first project in the decoration, mainly including wall demolition, wall building, shoveling wall skin, dismantling heating, replacing plastic steel windows and so on.

    2. Change water, electricity, and heating. Including kitchen and bathroom water pipes location, layout adjustment. According to the principle of ergonomics, the height and position of the water pipe often have to be changed greatly, for example, the water pipe access height of the toilet may not be the same as the reserved height.

    electricity, mainly considering the transformation of energized lines. Change the location and number of switches and sockets to make them more rational. warm, heated or underfloor heating.

    It needs to be designed in advance. The reason why water, electricity and heating are listed as the first step is that if the early stage is not well considered, it will lead to inconvenience in construction. 3. Floor tiles and wall tiles.

    In the first step, after the water, electricity and heating are adjusted, the floor tiles and wall tiles need to be paved.

    4. Ceilings of houses, living rooms, bedrooms, studies, dining rooms, kitchens, bathrooms, and balconies.

    5. Wrap the door and wrap the mouth. The decoration of doors and windows, as well as the production of some furniture accessories, such as entrance treatment, TV background wall production, etc.

    6 Wall painting. Wall painting, you can use painting, wallpaper, wall covering, etc.

    7 Primer topcoat. Priming and topcoat of doorways, windows, and parts of furniture.

    8 Lighting Installation. Install all the lamps in the room, including all kinds of ceiling lights, downlights, chandeliers, spotlights, etc.

    If you really don't know anything about decoration, if you don't have time to keep up with the progress, you can choose the whole outfit, which is the most worry-free and effort-saving. Our home is the whole outfit of the peak of the industry, and the cost performance is not bad. There will also be dedicated personnel to follow up and communicate the progress of each department.

  4. Anonymous users2024-02-09

    Step 1 of house decoration: civil construction stageDesign the house drawings, and carry out preliminary renovations such as wall demolition and wall building. The choice of design drawings, including the choice of designer, is crucial.

    Observation line, trunking, hydropower transformation and acceptance.

    Concealed hydropower renovation project of buried trunking, waterproof project, 24-hour closed water test on the bathroom and kitchen floor.

    After doing the above steps, you can apply wall and floor tiles to the bathroom and kitchen.

    Step 2 of house decoration: grassroots treatment stageFirst of all, in general, the carpentry is carried out first, hanging ceilings, plaster corners.

    Cover door covers, window covers, and make wooden cabinet frames.

    Synchronous production of various wooden doors, modeling doors and flat pressure doors.

    Wooden panels are brushed with dustproof paint.

    The window sill marble countertop is leveled and laid.

    The wood veneer is pasted, the lines are made and finely installed.

    Treatment, sanding, leveling of the wall base.

    Furniture, door and window edges are pasted with stickers (protective edges) on the seams.

    Step 3 of house decoration: detail processing stagePaint the walls at least three times.

    Furniture paint incoming, nail holes, paint.

    Treatment of corners, floor tiles, solid or laminate flooring, waterproofing of marble strips, baseboards.

    Installation and commissioning of lamps, switches, sockets, sanitary ware, handles, and door locks.

    Cleaning and sanitation, floor tile repair, and withdrawal.

    Preliminary acceptance within the decoration company.

    The three-party appointment time is officially accepted, and we can see the results of our hard work at this time.

  5. Anonymous users2024-02-08

    For first-time renovation owners, it is also very important to have a decoration process, which can save time and a lot of trouble. So what are the steps to renovate a new house? Let's take a look!

    1. Demolition and alteration of the main body.

    The first step in the decoration of a new house is the main body of demolition and renovation, mainly including: wall demolition, wall masonry, shoveling wall skin and plastic steel windows and other projects, but when demolishing and modifying, do not move the load-bearing wall, so as not to leave potential safety hazards.

    2. Hydropower transformation.

    After the completion of the main body of demolition and renovation, it is necessary to carry out the most important step in the home decoration of hydropower transformation, in the hydropower transformation, to be careful and meticulous, solve the problem in a timely manner, to avoid causing potential safety hazards and other problems.

    3. Wrapping riser.

    After the completion of the water and electricity renovation, all the sewer pipes and water pipes in the house should be packaged, especially the water pipes in the kitchen and bathroom, so as not to affect the overall aesthetics.

    4. Bricklayer tiling.

    After wrapping the riser, you can enter the tiling process, which is mainly the living room floor, kitchen, balcony, bathroom and other spaces.

    5. Oilers brush wall paint.

    After the tiling is completed to stop vomiting, it is necessary to enter the painting process, and when applying the paint, it is necessary to strictly follow the standard construction of the painting process, otherwise it is easy to cause the surface of the wall to bulge or fall off.

    6. Doors, cabinets, kitchen and bathroom ceiling installation.

    After the paint is applied, the ceiling can be installed, and after the ceiling is installed, the cabinets and doors can be installed.

    7. Floor installation.

    After the ceiling, doors, and cabinets are installed, the floor can be installed, but pay attention to keeping the floor dry and clean it when laying the floor.

    8.Paving the wall is prepared with only paper.

    After the installation of the floor, you can start to lay the wallpaper, the wallpaper should not be opened for ventilation within 48 hours after the wallpaper is pasted, otherwise the wallpaper will absorb the moisture in the air, thereby reducing the adhesion between the wallpaper and the wall.

    8. Install the switch socket.

    When sticking wallpaper, keep one socket in the place of the socket in case you need it.

    9. Installation of lamps and hardware sanitary ware.

    After the switch and socket are installed, you can install lamps, bathroom pendants, toilets, clothes poles and other objects.

    10. Curtain rod installation.

    After installing the curtain rod, it means that the home decoration is basically completed.

    11. Clearing and cleaning.

    This is the first time that the new house has been cleaned and cleaned after renovation. Because during the decoration, a lot of construction waste and decoration waste will be generated, so it is very necessary to clean the wasteland.

    12. Furniture entry.

    After the cleaning is completed, you can buy furniture according to your needs, and you can start decorating your new home after the furniture enters the site.

    Article summary: Well, the relevant knowledge about what the steps of new house decoration are introduced here, friends who need more information, please continue to pay attention to Qeeka Home, and we will have better and more exciting content for you in the future.

  6. Anonymous users2024-02-07

    1. Preliminary design.

    Design the house according to the preferences and habits of the owner, and carefully measure the area of the individual rooms of the house.

    2. Demolition and construction of main materials.

    This is the time to enter the construction stage, which is simply to put up the space frame in the house.

    3. Hydropower transformation.

    The main obstacle is the water and electricity concealment project, the area of the wall and floor tiling, and the placement of furniture in each space.

    4. Three brothers of wood, clay and lacquer.

    Tiling, waterproof and leak-proof treatment, wall treatment, painting, etc.

    5. Installation stage.

    For example, the installation of ceilings, cabinets, doors, floors, lamps and lanterns in kitchens and bathrooms.

    6. Soft decoration stage.

    Decorate the home, hang pictures, curtains, sofas, etc. If you have this need, welcome to consult Hujia decoration. There are 22 offline physical experience stores, covering Quanhao Hehu Shanghai, with 0 additional items for decoration and lifetime warranty for hydropower concealed projects.

    One-stop all-inclusive assembly mode, including design, materials, manual search, electrical appliances, and project quality. )

  7. Anonymous users2024-02-06

    The renovation of a new house is a very cumbersome and large project, which takes a minimum of 2-3 months. It takes a lot of time and effort.

    First, after the preliminary preparation work is completed, you can enter the construction. The steps are as follows:

    1. Tear down the wall and build the wall.

    If you are not very satisfied with the layout of the rough house, you want to re-divide the pattern of functional partitioning. It is often necessary to remove some unnecessary walls and build new walls from new ones for partitioning or partitioning.

    2. Waterproof engineering and hydropower approach.

    These concealed works must be done well, otherwise they need to be reworked later, which is very costly. In order to be foolproof, choose a big brand of waterproof materials. It is best to do another layer on top of the developer's waterproofing layer, and then test the water backfill and then do another layer of waterproofing, and the wall should also be waterproofed.

    Hydropower please professional master wiring pipes, and hand over electrical appliances, switches, and sockets with the master. These two concealed works can be completed alternately and simultaneously.

    3. Masons enter the site. Prepare sand, cement, and tiles.

    Masons leveled the floor, sticking floor tiles and wall tiles. You have to find a master for this one, and the master can not only save materials as much as possible, but also control the flatness and clearance well. At this time, you can contact the installation of frameless balconies, and window sill stones, and you can book the door, which needs to be booked more than 20 days in advance.

    4. Carpentry entry. All kinds of plates, trim lines are transported back to the construction site.

    Carpentry is on site to create shoe cabinets, wine cabinets, storage cabinets, wardrobes, cabinets, tatami mats, bookcases and ceilings and other cabinets that you require for daily storage functions, as well as background wall priming and door frame priming.

    5. Scraping ash and painters enter the site.

    Leveling and scraping of walls and ceilings. and the spraying of latex paints. If the cabinet needs to be painted, it is also painted at this stage. If you need to paste wallpaper and wallcovering, you can save the spraying of latex paint on the wall. But the ceiling is to be sprayed.

    After completing this step, all the basic parts are almost complete. Behind is the installation of the main material. Many of them need to be booked with the merchant in advance, so you need to make an appointment in advance to measure the size.

    Second, the main material part: doors, sliding doors, sanitary partition doors, cabinet doors, wooden floors, stone background walls, skirting lines, toilets, bathroom cabinets, laundry cabinets, hardware, bathroom ceilings, etc. Contact the merchant or worker to install them one by one.

    Up to this point, all the hard-mounted parts had been completed. Next up is the soft furnishing part. Furniture, electrical appliances, curtains, decorative paintings, etc. were all installed on site.

    After all the decoration is completed, the next step is to leave it for a while, and then find time to prepare for the housewarming.

  8. Anonymous users2024-02-05

    First, the preliminary design.

    To decorate a house, the first thing is to start with the design, the designer has a detailed understanding of your entire family situation and the house type, and their own ideas and opinions should be clearly communicated with the designer to avoid some unnecessary troubles in the later stage. In addition, after the design is out, it should be checked, and the unsatisfactory places should be adjusted in time.

    Second, the main body of demolition and reform.

    At the beginning of this step, even if the construction stage is officially entered, the main demolition and modification should be carried out in accordance with the design plan, and the framework of the construction site should be built first. The main demolition and reconstruction includes wall demolition, wall building, shoveling wall skin, etc.

    3. Hydropower transformation.

    Hydropower renovation is the most important step in the decoration process, and many houses in life will have hidden dangers left by substandard hydropower projects. Therefore, this part of the construction must be careful to avoid unnecessary troubles in the later stage.

    4. Carpentry engineering.

    Carpentry is a complex process, of course, carpentry can also be handled as a key part of the main modification, and there is no conflict with the hydropower transformation, and sometimes there will even be some cooperation. Carpentry is the type of work to complete various wooden works in the house, and the labor cost accounts for 40-60% of the entire decoration labor cost.

    5. Masonry engineering.

    Masonry is the tile process that everyone is more concerned about, as well as the wall, ground, regional waterproof engineering, etc., the construction quality of this project is also bad is directly related to the appearance of the decoration, and the waterproof quality is directly related to the quality of life after moving in.

    6. Painting works.

    When it comes to the painting project, it generally marks the end of the hard decoration part, which mainly includes wall surface treatment, batch scraping putty, grinding, brushing latex paint, etc. The painting project is a face-saving project, but if it is not done well, there will be various troubles in the later period, such as wall cracking, paint peeling, etc.

    7. Finished product installation.

    This step is to install various furniture and household appliances, such as switch and socket installation, lamp installation, hardware and sanitary ware installation, curtain installation, household appliance installation, etc.

Related questions
10 answers2024-07-16

Steps to clean a new house:

1. Clean the bathroom first, because this place may be the first thing you need when cleaning the room; Then clean the kitchen, because it is a "big water user", so it is better to clean it first, and this is related to health, so it must be thoroughly cleaned, 360 degrees without dead ends. >>>More

11 answers2024-07-16

1. Living room. The living room is a place to deal with people, so its status and decoration are very important, and the feng shui issues that need to be paid attention to are also very important. >>>More

16 answers2024-07-16

The arrangement of strategic steps on China's industrialization path includes the following stages: >>>More

21 answers2024-07-16

The new house is bought on the top floor, and the method of decoration: for the top floor of the building with strong lighting ability, we must do a good job in the light blocking ability of the house. Assembling curtains with strong light blocking ability or attaching heat insulation film to laminated glass in the summer can reduce the scattering of the outside to the house and ensure that the temperature on the penthouse is the right one. The top floor of the building customers should pay attention to the most important thing when decorating is moisture-proof, because the top floor of the building is most prone to water seepage, leakage, if the problem of water seepage, it is very easy to destroy the beauty of the wall and ceiling, so it is necessary to ensure that the roof is not seepage, and carry out a delicate inspection once or twice a year to ensure that the roof is not seepage, no leakage. >>>More

19 answers2024-07-16

Preface: Since the newly bought house is a top floor, it is very necessary to think about the correct house design when decorating the house. For contemporary young people when decorating their houses, many people will choose to directly invite a decoration company, because they think that with a decoration company to come to the home to decorate, they will design according to the corners of the home, so as to reduce the waste of area. >>>More