    Kitchen decoration, the procedure flow is generally: water and electricity decoration embedded parts, waterproof treatment, floor tile parquet, lighting power switch comes with it, ceiling, overall cabinet, stove kitchen appliances installation. In the case of people's decoration, the first ceiling or the first installation of the cabinet order is not necessarily, some people restaurant kitchen ceiling lamp selection is the modeling roof, that is, made of paper gypsum board, this kind of top needs to be carried out first, and more people choose the integrated ceiling, the order of installation is not certain, the pursuit of each person is not the same, kitchen decoration, not the first ceiling, not the first installation of cabinets, the first decoration of the wall and pavement, is the first paste of tiles, and then paving tiles, Below are the ceilings and cabinets.

    Kitchen decoration, is not the first installation of the ceiling, nor the first installation of cabinets, in accordance with the steps of the engineering construction, kitchen decoration of the first item, walls, pavement must be ground leveling solution, wall leveling meaning, with pavement leveling mortar, first the wall, pavement leveling, the following is the interior decoration of the back, is the dining kitchen paste tiles, floor tiles, because of the installation of cabinets it parts can be more compatible with the ceiling, especially some good friends he wants to cabinets, just close to the ceiling, The cabinet can only be installed at the end. In the kitchen, whether to install the ceiling or the cabinet first, I will talk about the best installation order.

    That is to first pre-embed the exhaust pipe of the range hood and natural gas water heater, then the ceiling, then the cabinet, and finally the range hood and stove. Install the ceiling first and then install the cabinet, the key is to avoid the harm to the cabinet when installing the ceiling, after the installation of the ceiling and the paving of the wall bricks, and then leave the indoor space for the installation of the cabinet, so that the staff will be more assured that the construction of the project will be more assured, otherwise it will hinder the cabinet, and the construction of the project is undoubtedly inconvenient and slow down the construction period.

    The delay in the construction site or the destruction of the cabinets caused by that will certainly not be easy for the decoration company to manage. If you're in a hurry to move in, it's even more of a big loss. Assuming that the design scheme of the smoke exhaust pipe of the range hood is under the ceiling, the ceiling must be installed first.

    It is because the relative height of the ceiling is relatively high, and the cabinet has a certain relative height, if the two have in and out, then there will be a gap. Therefore, it is advisable to install the ceiling first. Once you encounter such a situation in the decoration process, why not refer to the above practices.

    At the same time, if you don't know it, it is recommended to consult professionals before completing the actual operation.

  2. Anonymous users2024-02-11

    When renovating the kitchen, the ceiling should be installed first; After getting it wrong, it will have a certain impact and will affect the progress of construction.

  3. Anonymous users2024-02-10

    Be sure to get the ceiling first, if you install the cabinet first, the ceiling is not suitable and you have to do it again, and the cabinet is stalled, and the ceiling is not good.

  4. Anonymous users2024-02-09

    Generally speaking, for the decoration of the kitchen, it is better to install the ceiling first; Getting it wrong has a certain impact, it will waste time and relative money, and it will affect the overall aesthetics of the room.

  5. Anonymous users2024-02-08

    Basically, every household has a cabinet, but the number of cabinets selected by different families, or the size is different, the choice of cabinets is also a lot of skills, as long as you pay attention to these problems, the choice of cabinets can be said to be really simple, let's talk about how to choose cabinets when home decoration.

    Bologni tips the precautions in the selection of cabinets.

    1. Size. Kitchen cabinets are generally divided into floor cabinets and hanging cabinets. The height of household cabinets is usually 80-85 cm, which is also designed according to the average height of the Chinese. It is recommended to set the sink 5 cm below the elbow, the height of the operating table 15 cm below the elbow, and the height of the hearth 25 cm below the elbow.

    When installing and placing floor cabinets, the unevenness of the wall surface should be taken into account, and the distance between the floor cabinet and the wall should be about 5cm to 6cm.

    The height of the hanging cabinet depends on the ceiling height of the kitchen and is usually between 65 cm and 90 cm. If the ceiling of the kitchen is higher than the meter, the height of the hanging cabinet can be chosen as 91 cm.

    Range hoods are an indispensable part of the kitchen and should be paid special attention during installation. Installing too high may lead to the loss of some fumes, and high and low levels are not conducive to daily cooking. The suspension distance of a standard range hood for floor cabinets (excluding tabletops) should be 52 cm 62 cm.

    2. Material. There are a variety of cabinet materials, each with its own advantages and disadvantages. Stainless steel material is waterproof, insect-proof, high-temperature resistant, and environmentally friendly. It can be reused and has a service life of about 20 years. However, the technical requirements in production are strict.

    Wooden cabinets are mainly used for rustic style and Japanese home decoration, which is beautiful overall and has a good visual effect. The disadvantage is that it is easy to mold and rot, and the service life is not long.

    Cabinets made of fireproof board are resistant to high temperatures, easy to clean, moisture-proof, and not easy to fade. The disadvantage is that it is impossible to produce three-dimensional effects like bumps and metal.

    The most mature cabinet material in the blister board cabinet is scratch resistant, heat resistant, fade resistant, easy to clean and popular in the market.

    3. Beautiful. In fact, beauty is present in every part of our lives. After giving us a place to cook, the kitchen can also be as nice as the living room. Use different colors and patterns to create different atmospheres.

    If the kitchen area at home is too small, the color of the cabinets should not be too dark, and dark colors can give a sense of visual oppression. The light color will give people a sense of visual extension and make the space more spacious.

    The log cabinet gives a natural and fresh feeling, accompanied by melons, fruits, vegetables or flowers, as if you are in an open air.

  6. Anonymous users2024-02-07

    For the decoration of the kitchen, it is usually the reason why the ceiling is installed first, and then measured by the designer after the ceiling is installed, and then the cabinet is installed after the size is determined.

    1. Generally speaking, when making cabinets, hanging cabinets will be made, due to the structure of the cabinet, as long as the ceiling is installed, the height required for the hanging cabinet can be actually measured, which can leave enough space for cabinet installation, so that the later construction is also convenient and worry-free.

    2. Compared with the two, the installation of cabinets will be more complicated, and many parts need to be customized in advance. The ceiling is installed in a modular way, so it is relatively quick and easy to install, and it can usually be done in one day.

    Therefore, the ceiling is installed first and then the cabinets are installed, which will not affect the progress and construction period of the entire decoration. And there is no need to worry if you encounter problems, because the gusset module with integrated ceiling can be disassembled, which is convenient and quick to operate.

  7. Anonymous users2024-02-06

    1.The normal is to install the ceiling first, after the ceiling is installed, determine the height of the entire cabinet, our wall cabinet can not lean on the top of the wall cabinet, to avoid sanitary dead ends.

    2.If you install the cabinet first and then install the integrated ceiling, there is a lot of garbage in the process of decoration and there is no way to clean up the cabinet.

    3.The installation sequence of the ceiling is relatively simple and can be completed in one day.

    Therefore, it is generally necessary to install the ceiling first and then install the cabinets.

  8. Anonymous users2024-02-05

    In the installation of the kitchen first to install the ceiling or first to install such a sequence, the construction sequence is also for the purpose of tiling, so that you can install the kitchen in your own home, there is a feeling of heartbeat.

    If it is the opposite to install the cabinet first, it will affect the ceiling when installing the ceiling, it doesn't matter, it will affect the overall effect and the feeling of use.

    Therefore, in terms of decoration, we must make a decision according to the actual situation, do not blindly follow the trend, choose a style that belongs to you, decoration is not only a technology but also an art. But it must be carefully considered, and even carefully and carefully installed.

  9. Anonymous users2024-02-04

    Kitchen cabinets first, then wall cabinets (easy to adjust distance).

    Wall cabinet operation process:

    1. Process flow: line finding, positioning frame, frame installation, hanging cabinet, partition, fulcrum installation, wall (hanging) cabinet fan installation, hardware installation.

    2. Line positioning: Before plastering, the indoor unified elevation line is used to determine the corresponding position according to the height of the hanging cabinet, hanging cabinet elevation and upper and lower mouth height required by the design and construction drawings, considering the relationship between the plastering thickness.

    3. Frame and frame installation: The frame and frame of the wall cabinet and wall cabinet should be carried out before indoor plastering, and after being installed in the correct position, 2 nails should be nailed to each fixing piece of the frame on both sides and the wooden bricks of the wall, and the nail cap should not be exposed. If the partition wall is aerated concrete or lightweight partition wall, it should be fixed according to the structure required by the design.

    If the design is not required, you can pre-drill a 5mm hole, 70-100mm deep, and pre-embedded wooden wedge in the hole to stick 107 glue cement slurry, and then install the fixed cabinet after the hole is firmly bonded. When the steel cabinet is used, it is necessary to embed the iron parts at the position of the fixed frame of the installation hole to weld the frame. When the frame and frame are fixed, they should be corrected, squared, straightened, and checked for accuracy in elevation, size and position before fixing.

    4. Installation of the fulcrum of the partition of the hanging cabinet: the fulcrum of the partition is installed according to the elevation position of the partition in the construction drawing and the fulcrum structure of the requirements. The fulcrum of the wooden partition is generally to nail the fulcrum wooden strips to the wooden bricks of the wall, and the concrete partition is generally a crag-shaped iron piece or an angle steel bracket.

    5. Installation of hanging cabinet fan:

    1) According to the installation position of the fan to determine the hardware model, the cutting direction of the split fan, generally should be opened to the right fan for the cover fan.

    2) Check the size of the frame mouth: the height of the frame mouth should be measured at both ends of the upper mouth; The width of the frame mouth should be three points between the upper, middle and lower frames on both sides, and the corresponding part of the fan should be marked at a fixed point.

    3) Carry out the first trimming of the frame fan according to the marking, so that the frame and fan are suitable, try to install and draw the second trimming line, and at the same time draw out the position of the frame and the hinge groove, and pay attention to avoid the upper and lower heads when scribing.

    4) Shovel and hinge groove installation hinge: according to the marked hinge position, chisel out the hinge edge line with a flat shovel, and the hinge groove can be removed.

    5) Installation: During installation, the hinge should be pressed into the hinge groove of the fan, the fixing screws should be straightened, the depth of the hinge groove should be repaired during trial installation, the gap between the frame and the fan should be adjusted, and each hinge on the frame should be screwed first, and then closed, and the frame and the fan should be checked to be smooth and free of defects, and all the screws should be installed and tightened after meeting the requirements.

    Wooden screws should be nailed into the full length of 1 3, screwed into 2 3, such as frame, fan for jacaranda or other hardwood, hinge installation screws should be marked and drilled, the hole diameter is the diameter of the wood screw, the depth of the eye is 2 3 length of the screw.

    6) Install the folio fan: first measure the size of the frame and fan, determine the middle counter-seam and cutting depth, and carry out the planing groove after the line, and when the trial installation is suitable, install the left fan first, and then install the cover fan.

    6. Hardware installation: the variety, specification and quantity of hardware are installed according to the design requirements, and the selection of the position should be paid attention to when the installation is not specific.

  10. Anonymous users2024-02-03

    Does the kitchen install cabinetry first, or does it install a suspended ceiling first? The difference is big and you don't know the details.

  11. Anonymous users2024-02-02

    It must be suspended first, and the cabinets must be installed after the wall tiles are pasted - this is the general procedure for decoration construction. Otherwise, it will not only affect the construction of the ceiling, but also may damage the cabinets, and there will be a lot of dust、、、 when the painter is about to finish, it is not too late to install the cabinets.

  12. Anonymous users2024-02-01

    Now do cabinets are considered to deal with the gap between the top of the hanging cabinet and the ceiling The overall beauty and money saving is the cabinet first and then the ceiling The disadvantage is that the cabinet will be replaced in the later stage, if the ceiling is first and then the cabinet The top plate (about 15 cm of the gap between the wall cabinet and the ceiling) and the position of the top seam should be glued on the glass glue for a long time, and the glass glue may become black and glued from the new.

  13. Anonymous users2024-01-31

    Generally, there will be a gap of more than ten centimeters between the cabinet and the ceiling, so that the cabinet can be seen to be bigger without sealing the board, then the ceiling will be suspended first. You can't go wrong from top to bottom. If you do the sealing board will have the problem of hanging the ceiling successively, the advantage of making the cabinet after the ceiling is to avoid the cabinet will be damaged, and the cabinet will not move to the top in the future; In the case of a sealed board, if you install a cabinet and then the ceiling, you can install a few less gussets, the disadvantage is that if you repair the cabinet in the future, the smoke pipe will move to the ceiling, the trouble is bigger, if you don't want to use the sealing plate, there is no gusset inside it, it will be miserable.

    When the ceiling is suspended, a few more gussets will not save many meters. Personally, it is recommended to install the ceiling first and then install the cabinet.

  14. Anonymous users2024-01-30

    First of all, the ceiling, because there is a hanging cabinet to hang the cabinet, the ceiling hanging cabinet is not good, this is the cabinet is very squeamish, especially the paint door panel, a little careless, it is easy to bump.

  15. Anonymous users2024-01-29

    If the ceiling is suspended first and the cabinet is installed first, it is easy to be damaged.

  16. Anonymous users2024-01-28

    Of course, the kitchen decoration should be suspended first, and then the cabinets should be installed.

  17. Anonymous users2024-01-27

    Make the ceiling first and then install the cabinets.

    If you install the cabinet first, it will inevitably bump when installing the ceiling, and there will be a lot of dust when the ceiling is installed in the later stage, which is difficult to take care of in the cabinet.

    Only after the ceiling is installed, can the actual height of the cabinet be measured, and only when enough space is left can the later construction be assured.

    The installation of cabinets is more complicated, you need to book accessories in advance, and the kitchen ceiling is simple, only 1 day can be done, first install a simple ceiling, will not delay the construction progress later.

  18. Anonymous users2024-01-26

    Install the whole cabinet first, and then hang the ceiling. Because although the overall cabinet is not high to the roof, the range hood should be installed first, and the flue pipe should be reserved so that the ceiling can be lifted. If the ceiling is suspended first, you can only dig a groove when installing the range hood, which is not the job of the installers who install the whole cabinet, nor is it their specialty, even if they help to do it.

    At that time, the opening is too big or small, it is ugly, and it is not easy to solve. Therefore, according to the decoration procedure, the whole cabinet should be installed first, and then the ceiling should be suspended.

Related questions
24 answers2024-07-17

It will be easier to install the ceiling first and then the hood. >>>More

30 answers2024-07-17

In the process of renovating the bathroom and kitchen, in general, we will first lay the bricks and then install the door. This order is based on several reasons. First of all, the installation of the door needs to be carried out under the condition of a flat wall, and the paving of bricks can make the wall more flat, which is conducive to the installation of the door. >>>More

5 answers2024-07-17

The normal is to pave the floor tiles, gradually measure the customized cabinets, doors, door and window covers, etc., so as to gradually go on the carpentry, the carpentry is done gradually batch the wall, paint, after the customized cabinets, doors this kind of home, gradually assembled. Process: After making home furniture and carpentry, and laying bricks for interior decoration, it is necessary to gradually customize home furniture, wardrobes, kitchen cabinets, sprinkle cabinets, shoe racks, doors, door and window covers, etc. >>>More

6 answers2024-07-17

Throughout the renovation process, the installation of the door cabinet is usually carried out in the final stage of the renovation. This is mainly because the installation of the door cabinet needs to be carried out after most of the decoration work such as wall painting and floor laying is completed to prevent damage to the door cabinet during the decoration process. In addition, the installation of the door cabinet also needs to be carried out after the installation of infrastructure such as wires and water pipes to ensure that the installation position of the door cabinet does not conflict with these facilities. >>>More

19 answers2024-07-17

During the renovation process, in general, we will lay the flooring first, and then install the wardrobe. The main reasons for this are as follows. >>>More