What do the new cost workers do?

Updated on workplace 2024-07-17
6 answers
  1. Anonymous users2024-02-12

    It seems to look at the drawings, calculate the amount of work, and don't need your kit or something.

  2. Anonymous users2024-02-11

    Let's look at the drawings first, and then look at the rebar.

  3. Anonymous users2024-02-10

    Playing soy sauce, I'm also playing soy sauce.

  4. Anonymous users2024-02-09

    Cost officer refers to the person who has passed the cost officer examination and obtained the qualification certificate of construction project cost and is engaged in project cost business. Cost officer job responsibilities 1, the preparation of the general plan of materials for each project, including the specifications, models, and materials of materials. In the material master plan, the main materials should be prepared according to the parts, and the consumables should be prepared according to the project.

    2. Responsible for the preparation of construction drawings of the project, settlement and quantity analysis, compilation and review of project subcontracting, and settlement of labor layer.

    3. Prepare the monthly project progress budget and material adjustment (according to the material staff to provide the market ** or the financial to provide the actual **) and timely report to the relevant departments for approval.

    4. Review the project progress budget of the subcontracting and labor layer (the technician approves the project quantity).

    5. Assist finance in cost accounting.

    6. Adjust the budget in a timely manner according to the on-site design changes and visas.

    7. In the bidding stage of the project, make the budget in a timely and accurate manner and provide the best basis.

    8. Grasp the accurate market and budget, and adjust the pre-settlement in a timely manner.

    9. Provide timely information on the work content of each labor service layer as the basis for decision-making.

    10. Participate in the preparation of bidding documents, bidding documents and contract review, collect the cost information of each project, and provide a basis for bidding.

    11. Be familiar with the drawings, participate in the drawing review, raise questions, and be responsible for the remaining undiscovered problems.

    12. Participate in the review of labor services and sub-contracts, and put forward opinions.

    13. Build a good account of the pre-project, settlement and progress report of the unit, and fill in the relevant reports.

  5. Anonymous users2024-02-08

    First, the work content of the cost officer:

    1) Preparation and review of construction project investment estimates and project economic evaluation;

    B) the project estimates, budgets, completion (final) accounts, bills of quantities, project bidding or bidding control price, the preparation and review of the bidding **;

    3) Adjustment of project changes and contract prices and calculation of claim costs;

    D) the construction project cost control at all stages of the project;

    5) Appraisal of project economic disputes;

    F) other matters related to the project cost business.

  6. Anonymous users2024-02-07

    1. Be familiar with the laws and regulations of the country and the management regulations related to the project cost, be proficient in the theoretical knowledge of the specialty, be familiar with the engineering drawings, master the project budget quota and relevant policies and regulations, and lay the foundation for the correct preparation and review of the budget.

    2. Responsible for reviewing construction drawings, participating in drawing review and technical disclosure, and making budget adjustments according to their records.

    3. Assist the leaders to do a good job in the project declaration, organize bidding, approval before the start of construction and acceptance after completion.

    4. After the completion and acceptance of the project, the final accounts of the completed project shall be carried out in a timely manner and submitted to the director for signature and approval.

    5. Participate in the procurement of engineering materials and equipment, be responsible for the analysis of engineering materials, review the price difference of materials, collect and master the records of technical changes and material substitutions, and do a good job in cost calculation at any time to provide a scientific basis for leadership decision-making.

    6. Fully grasp the terms of the construction contract, go deep into the site to understand the construction situation, and lay a good foundation for the final account review.

    7. After the final accounts of the project, the final accounts of the project should be sent to the audit department for auditing.

    8. Complete the economic analysis of the project cost and complete the archiving of the final account data of the project in a timely manner.

    9. Assist in the preparation of capital construction plans and adjustment plans, and understand the implementation of infrastructure plans.

Related questions
8 answers2024-07-17

Manual and software are parallel, and any amount can be calculated by software, and of course it may be calculated by hand. Otherwise, how did people work in this area before the arithmetic software came out? Hehe, as for the name of the take-off project of the software upstairs is too vague, it may be that you are not proficient in the use of software. >>>More

11 answers2024-07-17

Consult the comprehensive section of Chongqing Construction Project Cost Management Station. >>>More

21 answers2024-07-17

More than 10 years of cost personnel, civil engineering: 15 180,000 a year; More than 12 years of water and heating cost personnel, more than 120,000 years of electrical cost personnel; Hydropower is 15,180,000 years for one person.

12 answers2024-07-17

The cost qualification examination is divided into two subjects: "basic knowledge of engineering cost" and "engineering measurement and valuation practice (engineering)". Among them, "engineering measurement and valuation practice (engineering)" is divided into a number of majors, and the examination syllabus is prepared by the local and industry management agencies and sent to the China Construction Cost Management Association for the record. >>>More

14 answers2024-07-17

The number of cost officer examinations is mainly based on the demand for cost personnel in various places, because the demand for cost personnel is different in various places, so the number of times held every year is not the same. For example, if a province has a large demand for cost personnel this year, it is possible to hold it once in the first half of the year and the second half of the year to fill the shortage of cost personnel in the province. It all depends on the circumstances of each province. >>>More