-
The difference between half-package and full-package decoration.
First, the purchaser of the material is different
The decoration method of half package is that the decoration company is responsible for the design and construction of the decoration project, as well as the purchase of auxiliary decoration materials (water pipes, wires, cement yellow sand bricks, plates and paints), and the owner undertakes the purchase and transportation of the main decoration materials (tiles, floors, bathrooms, integrated ceilings, cabinets, switch panels, doors, sliding doors and cabinet doors), and can have sufficient initiative in the quality control of materials. The specific purchase items can be determined by mutual negotiation before the decoration, so as to be able to purchase them in time.
In the all-inclusive decoration, the decoration company is responsible for the construction and purchase of raw materials throughout the decoration process, and the owner needs to pay all the costs to the decoration company.
Most of the half-package decoration is on the basis of the half-package, some of the main materials are bought by the owner himself, and some of the main materials are bought by the decoration company.
The difference between half-package and full-package decoration.
Second, the participants in the decoration style are different
The decoration method of half package requires the owner and the decoration company to discuss the decoration style in advance, and before construction, both parties are ready to complete the decoration drawings to facilitate the purchase of objects. During the decoration process, the decoration company can also adjust the interior decoration style at any time according to the specific color and shape of the items purchased by the owner. In general, the whole renovation process can be changed randomly.
The all-inclusive decoration is based on the decoration drawings designed by the construction party, and after being approved by the owner, the decoration is carried out in strict accordance with the design drawings, and the probability of change again is relatively small.
The difference between half-package and full-package decoration.
Third, the length of the construction period is different
In the actual operation process, the owner is very prone to problems such as unsatisfactory purchases and repeated selection, purchased materials that do not meet the construction standards, and untimely material transportation, which leads to sometimes delays in the construction period. On the contrary, the all-inclusive decoration, because the decoration company has rich experience, has a certain raw material collection channel, and rarely has difficulties in material purchase and transportation, so it can generally be completed on schedule, and some may also be completed ahead of schedule.
Friends who are ready to decorate, if you want to buy the main materials yourself, such as tiles, floors, doors and windows, bathrooms and lighting, etc., if you want to be all-inclusive, you will hand over the main materials, auxiliary materials and construction to the decoration company, you can save worry and effort.
-
Semi-packaged repair means that the homeowner undertakes the purchase of decoration materials, and the decoration team only needs to be responsible for the design of the decoration plan and the implementation of the decoration project. Because in the process of buying materials, people who have no experience, or who do not know much about decoration, are easily deceived and spend ** to buy inferior materials, so semi-packaged repair is more suitable for homeowners who have experience and know more about decoration materials. Compared with full-package repair, half-package repair is of course more reliable and not easy to be deceived, but it is more time-consuming and laborious, and it is more troublesome.
The whole package repair team is responsible for all things of house decoration, including the planning and design of house decoration, the purchase of decoration materials and the implementation of decoration projects. The owner of the house can provide his own needs and preferences to the decoration team, and then only need to supervise the progress of the project on the side, and he does not need to do anything, saving time and effort. The all-inclusive package is more suitable for some homeowners who have a high degree of trust, and do not have any decoration experience and do not know about decoration at all, but it is easy to encounter the decoration team deliberately reporting the cost of decoration materials or cutting corners.
-
Hello, the all-inclusive is that you pay for it, no need to worry too much, the decoration materials and construction are all underwritten by the city and given to the decoration company! Therefore, the advantages and disadvantages of all-inclusive are also relatively obvious:
Advantages: First, the materials and construction decoration company is engaged in, and they have less to worry about; Second, the responsibility is clear, if there is a problem in the decoration, the decoration company can not shirk the responsibility; 3. If you encounter a well-decorated company, you can get a satisfactory decoration effect in the first but less worry!
Disadvantages: First, the cost is high, and ordinary people may not be able to afford it, and they may also be false, and they may be deceived; Second, the materials cannot be guaranteed; Third, I did not participate, and it is difficult to correct the first time when I am not satisfied! Fourth, when encountering a bad company, the decoration may not be satisfactory!
The half-package means that the main materials are bought by themselves, and the construction and some auxiliary materials are responsible for the decoration company!
And the advantages of half a package: buy the materials yourself, do not worry about being pitted, the quality can be more guaranteed, you have to participate, and the dissatisfied places can be corrected in time!
Disadvantages: running the building materials market, you also need to spend your own time, but also have a certain decoration knowledge and experience, you don't know **, when buying the main materials, it is easy to be pitted by the business!
Hope, thank you!
-
Half package is the basic part of the package, and full package is the full set of services.
-
Half a package is to buy materials by yourself and ask the master to do it, and the whole package is all materials and wages are included.
-
The decoration is divided into half package and full package, and what is included in half package.
-
For first-time decorators, renovation is definitely a headache and troublesome, in addition to the choice of materials, they may also face the choice of outsourcing the renovation? So decoration outsourcing involves full package and half package, but what is the difference between the two, which is better and deeply troubles these people? Let's take a look with Xiao Coconut.
1. The difference between full package and half package
1. Material procurement.
In the decoration process, the purchase and construction of all materials are responsible for the construction party;
Semi-package: the construction party is responsible for the construction and the procurement of auxiliary materials such as water pipes, and the main materials are purchased by the owner himself;
2. Decoration costs.
All-inclusive: the cost is high, and the decoration cost is difficult to control;
Half package: the main materials with higher value can control the majority of the cost by purchasing by themselves, and the owners of the auxiliary materials with low value are not easy to figure out, and the procurement by the construction party is more worry-free, so as to control the decoration cost well;
2. Advantages and disadvantages of the all-inclusive approach
1. All-inclusive advantages: it is more time-saving, labor-saving and worry-free, and the responsibility is relatively clear and clear, and any problems in the decoration can be attributed to the construction party. The whole package is repaired in quality, and it is also more beneficial for later maintenance, which can shorten the decoration company, and the decoration effect is holistic and relatively beautiful.
2. All-inclusive disadvantages: If the owner is not concerned about the decoration, it is easy to cut corners, if there is really no time to manage the decoration, we must choose a formal and reliable decoration company, and tighten the acceptance standards to avoid this phenomenon. If the construction period is not clear in the contract, it is easy to delay the construction period.
3. Advantages and disadvantages of the half-pack method
1. Half-package advantage: In the decoration design, the decoration company is responsible for the more troublesome piece, and there is no need to hire someone else to design, and some more fragmentary things such as auxiliary materials are purchased by the decoration company, which can save a lot of heart. The main decoration materials are bought by themselves, which is relatively more cost-effective, and the things they buy are more assured to use.
2. Disadvantages of half a package: that is, you need to control the whole process, and you must go to the material market to run the material during the rest time, and the final result of running out of the same brand and model may not be better than the ** Ruyi given by the decoration company, but you can rest assured that you can buy it in person. And the later construction site should be watched by yourself, so as not to have problems in the later stage of the construction site.
-
1. The material is responsible for different things:
The half-package is between the full package and the clear package, the owner is responsible for the purchase of the main materials, and the accessories and labor are purchased and provided by the decoration company.
The whole package is to increase the main materials required for decoration on the basis of half a package, from design to construction by the decoration company is responsible, and the owner only participates in the review and determination of the design plan and budget and the final project acceptance.
2. Including the different ages of the inner Ming:
Semi-package foundation works mainly include: wall masonry, water and electricity, bricklayers, carpentry, painting, waterproofing, cleaning, etc., in addition to the above construction project content, also includes the procurement of some materials.
The all-inclusive is to add the modeling design parts in the room on the basis of the half package, such as the TV wall modeling, living room, dining room, master bedroom, master bedroom entrance, cloakroom ceiling, etc.
3. Applicable to different groups of people:
Half package is suitable for decoration of the main materials have a certain ability to identify and match, and have time to buy, and at the same time as far as possible with the formal decoration company to sign a detailed decoration contract, it is best to sign a closed contract, to avoid the construction of missing items, changes and other situations.
The all-inclusive package is suitable for people who are busy with work and do not know about decoration. But the all-inclusive cost will definitely be a little higher than other ways.
-
What is the difference between a full package and a half package for decoration? The specific difference can be summarized by three sets of contrasting words: high cost and low cost, worry-free and laborious, active and passive.
In the difference between the decoration of the whole package and the half package, the first place is the high cost and the low cost. The level of the cost is still more important for ordinary families who have just paid the purchase price. The cost of decoration is much more expensive than the cost of decoration half package, and there is a certain reason for this expensive imitation brightness, because for full package repair, all decoration materials need to be purchased by the decoration company, and half package repair, the decoration company only needs to purchase materials for basic projects, and other main materials need to be purchased by the user.
In the difference between the decoration of the whole package and the half package, the second place is worry-free and laborious. The peace of mind and effort mentioned here are relative. Because of the full package repair, the user only needs to communicate with the decoration company about the decoration design and materials; However, the user has to go to the building materials market to buy materials, not only to meet their own decoration ideas, but also to meet the requirements of the decoration company.
In the difference between the decoration all-inclusive and the half-Hu Daming package, the third place is active and passive. In the choice of decoration materials, the user of semi-packaged repair occupies the initiative, can choose their favorite building materials, and will not worry about being pitted in terms of cost, while the user of full-package repair is relatively passive, and can only choose pants in the material catalog provided by the decoration company, and the cost can not be bargained, which may be higher than the market.
If you are a novice in decoration and have no time to buy building materials, it is recommended to try to choose the all-inclusive service of a large company, which can reduce the risk of being pitted, if you are a veteran of decoration, it is recommended to choose a half-package service, although it takes some energy, but you can play your own initiative, not only to reduce some decoration costs, but also to realize your own decoration ideas.
You can get it for free
-
Decoration half package and full package are two common decoration methods in the decoration industry. Decoration half package means that the owner buys decoration materials by himself, and the decoration company is responsible for construction and labor costs; Whereas, all-inclusive means that the renovation company is responsible for the entire renovation process, including material and labor costs.
If you want to know the specific decoration**, you can use the "decoration artifact" ** device to calculate, just enter the area + city, immediately calculate the local decoration**, list the detailed list of 102 decorations, so that you don't have to worry about overspending on the decoration, click here to start calculating: [3 seconds to get the local decoration**].
The difference between half-package and full-package decoration is mainly reflected in the following aspects:
1.Material selection: The decoration half package requires the owner to purchase decoration materials by himself, which can be selected according to his own preferences and budget; On the other hand, the renovation company is responsible for purchasing materials, which is generally selected according to the needs and budget of the owner.
2.Construction quality: The construction quality of the decoration half-package is often related to the materials purchased by the owner and the level of the construction team; The whole package is responsible for the whole process by the decoration company, and there will generally be a professional construction team and quality inspection personnel, and the construction quality is relatively more guaranteed.
3.**: The decoration half-package is relatively low, because the owner can choose the materials and construction team according to his budget; The all-inclusive ** is relatively high, because the renovation company needs to bear the entire cost of material procurement and construction.
According to the local market price, the decoration of the half-package is generally between 2000-3000 yuan per square meter, and the specific ** will also be affected by the choice of materials and construction team; The all-inclusive ** is generally between 3000-5000 yuan per square meter, and the specific ** will also be affected by factors such as the scale and reputation of the decoration company.
For owners, the choice of decoration half package or full package needs to be decided according to their actual situation and needs. If you have a certain understanding of decoration, have the time and energy to participate in the decoration process, and want to save some costs, you can choose to decorate half a package; If you don't know much about decoration, you hope to have a professional team responsible for the whole process, and you are willing to pay a certain fee, you can choose to decorate all inclusive. No matter which way you choose, you need to choose a decoration company with a good reputation and guaranteed construction quality to ensure the decoration effect and quality.
Tuba Rabbit is one of the largest decoration platforms in China, with a total of more than 41 million owners, 110,000 decoration companies, covering more than 300 cities across the country, user reputation is very good, not only to meet your decoration needs, but also to provide professional decoration companies according to your budget, want to find a good company, learn more about decoration knowledge on Tuba Rabbit, click here, free 1 to 1 for your home decoration file service: [Tuba Rabbit ** official website].
The difference between a half-pack and a full-pack is as follows1. The material is responsible for the difference, and the half package is located in the full package and the clear package. >>>More
Upholstery:It refers to a wall decoration method that is packaged with flexible materials on the surface of an indoor wall. The materials used in it are soft in texture and soft in color, which can soften the overall atmosphere of the space, and its deep three-dimensional sense can also enhance the grade of the home. >>>More
I don't think there is a so-called all-inclusive or semi-packaged repair method, but it should be chosen according to the actual situation and individual needs. >>>More
What is the difference between half frame and full frame?
The difference between the green body, the production and manufacturing of the glazed brick body needs to be solved by high temperature, the strength is very high, and the water absorption is very low, about up and down. Although the body of the glazed tile is also fired at a high temperature, the requirements are not as high as the glazed brick, so the strength of the glazed tile is higher than that of the glazed tile, and the water absorption is much lower than that of the glazed tile. >>>More