    Gas is one of the essential energy sources for daily home life, but the location of some gas pipes will affect the aesthetics of the house decoration. So, what is the process of gas pipeline renovation?

    First, the process of gas pipeline transformation.

    1. Installation application.

    The first step is to submit an application to the Market Development Department. After receiving the application, the market development department will send someone to the owner's home within 5 working days for on-site inspection, and then reply to the owner and arrange a series of installation details.

    2. Open an account. The owner of the property needs to bring his ID card, real estate certificate and account opening notice to the gas company to sign the gas civil gas supply contract and pay the corresponding account opening fee. The gas company will send someone to the owner's home within 5 working days to install the gas meter and conduct an ignition test.

    If the renovation owner is a tenant, then you need to bring your ID card, housing lease contract and account opening notice to the gas company to apply for an account opening.

    3. Renovation construction.

    If the owner wants to move, move, modify or install a gas meter or gas pipeline, he or she needs to apply to the gas company, and then the gas company will come to the site for inspection, and the survey fee must be settled. The surveyor will calculate the modification cost based on measuring the size of the modification, and then will send someone to the door-to-door construction to settle the modification fee after the construction.

    Second, the essentials of gas pipeline transformation.

    It is best to do the gas renovation if it can not be moved, if it has to be changed, then it must follow the safety first.

    First, the principle that the line must be simple, and then it is time to consider the aesthetics of the decoration and the convenience of use. If the gas pipeline of the new house has to be changed, it should not be moved, and the decoration of the second-hand house, especially the renovation of some old houses, if the gas pipeline is found to be corroded and aged, it must be replaced and adjusted in time to avoid carbon monoxide poisoning or gas caused by dangerous gas leakage.

    3. Contraindications for gas pipeline transformation.

    Because gas pipelines are too threatening to home safety, the relevant departments do not allow owners to renovate and install gas pipelines without permission. If the owner has to renovate the gas pipeline, it must be approved by the property and the gas management unit, and then find a professional gas renovator to carry out the renovation.

    Fourth, gas pipeline renovation construction personnel.

    Gas pipeline renovation is very different from hydropower renovation because it has extremely high safety requirements, so it must be operated by professionals from the gas management unit. No owner or renovation worker has the right to dismantle or alter the gas pipeline without permission. If the owner wants to renovate the gas, he must contact the gas station to which he belongs, or contact the gas station through the property to ask them to send someone to renovate.

  2. Anonymous users2024-02-12

    1. The owner shall hand over the reserved contact diagram of the kitchen gas equipment provided by the kitchen company to the design department of the gas company, and then the design department of the gas company shall carry out the design in depth according to the reserved contact diagram of the kitchen gas equipment provided.

    2. The gas construction department shall construct the construction in accordance with the deepening drawings designed by the design department;

    3. Construction materials must be national standard products: pipe fittings, pipes, fittings, valves, etc. should have product qualification certificates;

    4. Safety facilities: long pipelines, gas equipment and gas meter rooms need to be installed with gas leakage alarms and automatic shut-off valves;

    5. After the completion of construction, the relevant gas departments shall carry out the construction acceptance and be deemed qualified before ventilation;

    6. Gas construction cooperates with the kitchen equipment company to debug gas equipment.

  3. Anonymous users2024-02-11

    Gas pipelines should not be modified and cannot be modified casually. If it is necessary to change, the principle of safety first must be followed when transforming. Let's take a look at the construction principles of gas pipeline renovation and the gas pipeline construction process.

    Principles of Gas Pipeline Retrofitting.

    The renovation of gas pipelines should be as safe as possible.

    First, the necessary principle of concise line, on this basis, consider the beauty and convenience and other factors. The gas pipelines of new houses generally do not need to be changed, while the gas pipelines of second-hand houses may be rusted and aged, which needs to be carefully inspected before decoration and necessary replacement and transformation to reduce the danger.

    Owners are not allowed to modify gas pipelines without permission.

    At present, the relevant departments have mandatory provisions on the transformation and installation of gas pipelines, all kinds of transformation and installation shall not be carried out by the owner privately, and the home improvement company can not be changed at will under various circumstances, and the owner shall be approved by the professionals of the property and the natural gas company, and then carry out the transformation and installation.

    Gas pipeline renovation process.

    The gas pipeline is different from other pipelines in the home, and no individual or renovation worker has the right to renovate the gas pipeline, and the transformation of the gas pipeline must be operated by the gas company's gas station. 1. Installation application: For projects that require the installation of pipeline gas, the owner shall submit an application to the Market Development Department.

    The gas company organizes personnel to conduct on-site investigations, reply to the applicant unit, and is responsible for coordinating all aspects of design, installation and ignition;

    2. Account opening: Bring the account opening notice, ID card, real estate reputation certificate or real estate lease contract, sign the gas civil supply contract, pay the account opening fee, and ignite according to the row and installation table within 5 working days;

    3. Transfer: Bring ID card, real estate certificate or housing lease contract, and the new resident can consult the customer service department about the gas fee payment and gas meter measurement of the former resident, settle the gas fee, go through the transfer procedures, and pay the relevant fees;

    4. Renovation and construction: the relocation, relocation, modification and installation of indoor pipeline gas facilities need to apply to the gas company, pay the survey fee, conduct on-site survey and calculate the modification cost, and settle the total cost of door-to-door construction. The above is my introduction to the relevant knowledge of the transformation principles and transformation process of gas pipelines, I hope it will help you!

Related questions
8 answers2024-07-25

First of all, it is necessary to apply for installation, the gas company conducts on-site investigation, is responsible for coordinating all aspects of design and installation ignition, and then opens an account, pays the account opening and fees within 5 working days, arranges the installation and ignition, and then transfers the relevant procedures, transforms the construction, and finally settles the cost; When the gas pipeline meets other pipelines, it should meet the requirements, the gas meter must be ventilated, the connection between the gas appliance and the pipeline should not use the hose, and the safety inspection needs to be carried out after the pipeline is installed.

6 answers2024-07-25

A gas pipe is a special pipeline that transports combustible gas. For gas pipes used in households, ordinary users generally use 4 pipes, and gas heating users use 6 pipes. The difference between the 4 pipes and the 6 pipes is that the pipe diameter is different, the 4 gas pipes are as thick as the indoor water pipes, and the 6 gas pipes are thicker than the 4 pipes. >>>More

9 answers2024-07-25

The method of opening the gas self-closing valve is to open the plug valve by hand, and the direction of the handle needs to be parallel to the direction of the pipeline. Gently pull the lift up and pull it to the position of the first switch. >>>More

12 answers2024-07-25

The installation unit must meet the following basic conditions: ; 1. Have the status of a legal person and hold an industrial and commercial business license; ;2. Have a quality system that meets the needs of pressure pipeline installation; ;3. The installation performance and installation capacity of pressure pipelines within the scope of application; ;4. The installation quality is qualified and the safety performance is reliable through the engineering project. For more information, please contact Nanjing Haixuan Enterprise Management Consulting****, products and services: >>>More

20 answers2024-07-25

It is relatively normal for a newly bought building to have a gas pipeline outside. According to the provisions of the national gas official website, gas pipelines should be set up in residential areas, and the layout, structure, safety and other factors of the building should be considered when designing. If you are concerned about the safety of your gas pipeline, you can consult your property or gas company to find out how the pipeline is installed and used. >>>More