-
1. When leasing the production of the plant to do the environmental impact assessment, it is necessary to consider many aspects according to the actual situation, that is, a construction project may have an environmental impact, and the process of confirming the degree and scope of its impact and stipulating pollution prevention and control measures through technical means such as analysis.
It is necessary to carry out the evaluation of the environmental pollution of "production and construction projects" in accordance with the provisions of the "Environmental Impact Assessment Law".
2. The environmental assessment agency is based on the raw materials, intermediate processes and the type, mode and quantity of pollutants discharged by the products, and should monitor the current environmental quality as the basis for the manufacturer's pollution.
And provide the technical indicators of pollution control requirements, make the "environmental impact assessment report (form)" of the project, and submit it to the environmental protection administrative department for approval. As an important approval requirement when the project starts.
3. If you need to do an EIA, you can entrust a unit with EIA qualifications to prepare the corresponding EIA documents, and then submit it to the environmental protection department for approval, with a report of 60 working days, a report form of 30 working days, and a registration form of 15 working days. Whether it can pass the EIA or not, the environmental protection department will issue written materials.
Warehouse Rental** Notice.
1. Logistics cost of warehouse leasing. Including: the wage standard of loading and unloading workers, the number of unloading per worker, the tools and consumables needed and the amount (average to each pallet).
2. Warehouse leasing ** storage costs. The distance from the other party's production line to your warehouse, the billing method and cost of logistics delivery (weight, volume, kilometers), and your own car are counted as fuel costs and driver costs.
The management cost of the warehouse, the cost of prevention and control of water, fire, pests and rodents and the corresponding insurance costs. According to these costs, you add your own expected profits** (or refer to the same region**and industry**).
-
Hello, as you said, this situation should be considered on a practical basis. First of all, it needs to be clarified under what circumstances an EIA is required?
That is to say, a construction project may have an environmental impact, and the process of confirming the extent and scope of its impact and stipulating pollution prevention and control measures through technical means such as analysis.
The EIA Law stipulates that if there are major changes in the scale, location, production process, pollution prevention and control measures of the construction project, the construction unit shall re-submit the EIA procedures to the environmental protection department with the right of approval; If the project that has passed the EIA approval starts construction after 5 years, it needs to be re-submitted to the original approval unit for re-review.
Therefore, the advice to you is to consult the local environmental protection department, if the production location, scale, production process, environmental protection facilities, measures, etc. have not changed, there is no need to do an EIA, there are major changes need to do an EIA, and you need to carry out environmental protection acceptance, confirm whether the pollutant discharge, environmental protection devices, etc. meet the standards and regulations.
If you need to do an EIA, you can entrust a unit with EIA qualifications to prepare the corresponding EIA documents, and then submit it to the environmental protection department for approval, and the report will be submitted within 60 working days; 30 working days for reporting forms; Registration form 15 working days. Whether it can pass the EIA or not, the environmental protection department will issue written materials.
-
The approval procedures are as follows:
1. One copy of the application form;
2. The text version of the environmental impact report of the construction project shall be in eight copies, and the electronic version shall be in duplicate;
3. A copy of the approval document of the project proposal (approval project) or the filing approval document (record project);
4. Other documents that should be submitted in accordance with relevant laws and regulations.
The commitment time limit is 60 working days (generally no more than 90 working days for hearings, expert reviews and technical assessments, and 120 working days for individual major environmentally sensitive projects).
In accordance with the provisions of the "Catalogue of Classified Management of Environmental Protection of Construction Projects", the construction unit shall organize the preparation of environmental impact reports for construction projects that may cause major environmental impacts. Submit an application to the State Environmental Protection Administration in a statutory form and submit relevant materials. The administrative examination and approval hall of the State Environmental Protection Administration accepts the environmental impact report and related materials of the construction project submitted by the construction unit, and verifies it, and makes a decision to accept it or not to accept it.
-
Summary. At noon, if you want to do an EIA, you need to go through the procedures.
1. Organize the data, make a list when collecting the data, and prepare the EIA, which is mainly divided into reports and report forms.
2. The EIA of different industries, scales and regions is different, and it is best to let the EIA engineer with relevant experience write and review, especially the EIA report.
3. The EIA report needs to hold a review meeting, and the EIA unit needs to introduce the project's technology, pollutant discharge, pollution source, sewage discharge, environmental protection measures and investment to experts and the Environmental Protection Bureau.
4. Then the experts discussed, came to the conclusion, revised the EIA, in general at the review meeting, should be written in the meeting minutes, the EIA can be used as the basis for the design and environmental management of the project after modification, to be changed according to the revised opinions, and then handed over to the construction party, approved, and handed over to the EIA Bureau.
Our company is a rented factory, and if you want to do an EIA, what procedures do you need to go through?
Hello, I have seen your question and am sorting out the answer, please wait a while
At noon, if you want to do an EIA, you need to go through the procedures 1, make a list of the information when collecting information, and prepare the EIA, which is mainly divided into reports and report forms. 2. The EIA of different industries, scales and regions is different, and it is best to let the EIA engineer with relevant experience write and review, especially the EIA report. 3. The EIA report needs to hold a review meeting, and the EIA unit needs to introduce the project's technology, pollutant discharge, pollution source, sewage discharge, environmental protection measures and investment to experts and the Environmental Protection Bureau.
4. Then the experts discussed in a mess, came to the conclusion that the EIA should be modified, and in general, it should be written in the minutes of the meeting, and the EIA can be used as the basis for the design and environmental management of the project after being modified, and it should be changed according to the revised opinions, and then handed over to the construction party, approved, and handed over to the EIA Bureau.
I hope mine can help you and solve your doubts <>
The rent of the plant shall be directly included in the "manufacturing expenses" account if the lease term is less than one year, and the "long-term amortized expenses" account shall be included in the "long-term amortized expenses" account if the lease term is more than one year, and will be amortized evenly during the lease period. Accounting Treatment: >>>More
Enterprises need the following information to do EIA:
First, the materials for EIA handling. >>>More
Electric mixer, viscometer, rapid moisture analyzer, lifting high temperature crucible furnace, heat treatment crystallization furnace, rapid solidification equipment, multi-functional mixer, high-speed disperser, centrifuge. >>>More
Low-strength cementitious. Epoxy coatings have lower substrate surface and bond strength than MPa, epoxy coatings occur after application, the lower part is not strong, and the forklift on the floor is lower. In the event of an emergency, a clasp is placed at the end of the paint. Coating. >>>More
The overall requirements for establishing and improving the safety production responsibility system Enterprises should follow the overall requirements of "horizontal to the edge and vertical to the end" to establish and improve the safety production responsibility system, and form a safety production responsibility network system covering all departments, all positions and all personnel. >>>More