How to draw the reinforced concrete retaining wall of Glodon steel sampling GGJ2009?

Updated on tourism 2024-07-23
15 answers
  1. Anonymous users2024-02-13

    1. What is a retaining wall? Retaining wall refers to the structure that supports the subgrade fill or hillside soil and prevents the deformation and instability of the fill or soil. In the retaining wall cross-section, the part that is in direct contact with the supported soil body is called the wall back; The part opposite the back of the wall and the part that is open is called the wall; The part that is in direct contact with the foundation is called the base; The top surface of the wall, opposite to the base, is called the top of the wall; The front end of the base is called the wall toe; The back end of the substrate is called the heel.

    2. When should the retaining wall be installed? What is the impact of not making retaining walls in the construction of the project? According to the different locations of the retaining wall, it is divided into shoulder wall, embankment wall, cutting wall and hillside wall.

    The retaining wall installed on the embankment slope is called the embankment wall; A retaining wall with the top of the wall located on the shoulder is called a shoulder wall; The retaining wall that is arranged on the slope of the cutting is called the cutting wall; The retaining wall that is installed on the hillside and supports the overburden soil or broken rock layer that may collapse on the hillside is called the hillside wall. Significantly improves the overall stability of the slope and the ability to withstand slope overload. With the excavation of the foundation pit, the excavation operation is carried out layer by layer, which does not occupy or occupies less of the separate operation time, and the construction efficiency is high, and the occupation period is short.

    The construction does not need to occupy the site alone, and it shows its superiority when the site is narrow, the slope is difficult, and there are adjacent buildings. 3. What is the difference between a retaining wall and an exterior wall in the basement? The exterior wall of the basement is part of the composition of the basement4. What is the underground diaphragm wall?

    Underground diaphragm wall can be defined as: using various trenching machinery, with the help of the wall protection effect of mud, digging a narrow and deep trench in the ground, and pouring appropriate materials in it to form a continuous underground wall with anti-seepage (water), retaining and load-bearing functions. Go to the tutorial library** to see details

  2. Anonymous users2024-02-12

    Select the shear wall component drawing.

  3. Anonymous users2024-02-11

    It's hard to describe, according to the requirements on the drawings.

  4. Anonymous users2024-02-10

    The compression wall reinforcement of the shear wall is the additional reinforcement in the horizontal direction of the shear wall, the input format: 2b12, and the length calculation formula is the same as the horizontal formula.

    View the original post

  5. Anonymous users2024-02-09

    There is a hole pile in the foundation, double click and right-click, select the parameter pile, select the type of hole pile that you want to correspond to in your drawing, and set the parameters inside. There is also a software that Glodon has a special hole pile foundation. I haven't used it though.

    I've heard it's pretty good

    In fact, the reinforcement of the hole pile is very easy to calculate, the stirrups, the infill area, the reinforcing hoop, the main reinforcement, and the length of the hole pile size are calculated as soon as you calculate it It is difficult to calculate the corbel column and the cantilever beam frame beam

  6. Anonymous users2024-02-08

    In Chongqing, the reinforcement of the pile foundation can be entered into a single component in the reinforcement 2009 software, or the reinforcement can be directly calculated in the separate digging pile software.

  7. Anonymous users2024-02-07

    It depends on what kind of structure it is, generally according to the first above ground and then the underground; First the main body, then sporadic 1, frame structure: according to columns, beams, plates, foundations, other 2, frame shear structure: shear wall, end column dark column, connecting beams, plates, foundations, other 3, brick-concrete structure:

    Brick walls, structural columns, ring beams, slabs, and other including stairs, eaves, post-pouring belts, sumps, etc.

  8. Anonymous users2024-02-06

    You can draw a rectangular board and "shift" it to draw a cornice board! Or first offset the board, and then divide it according to the position, and change the name of the part belonging to the eaves to the cornice board!

  9. Anonymous users2024-02-05

    In Chongqing, the reinforcement of the pile foundation can be returned to the input of steel bars or pile other reinforcements for a single component in the steel bar 2009 software, and it can also be directly calculated in the separate digging pile software.

  10. Anonymous users2024-02-04

    In the drawing input, you can't draw the corbel column directly, you must process the parameter diagram of the single member input: single member input--- component management--- other --- add components--- fill in the component name, quantity, --- determine the --- parameter input--- select the atlas--- corbel column--- two-sided --- selection--- input reinforcement --- calculate and exit.

    Corbel column: The corbel and the finch are the focus of carving and decoration in the ancient Han architecture. The corbel is an outward structure, for example, when building a house by one's own family, the cantilevered short beam added under the balcony in order to support the outward balcony is the corbel.

    In addition, in the factory, the outer picks set up on the column body to hold the crane beam, etc., are corbels. The corbel has a variety of patterns, and it is full of the meaning of the owner's better.

  11. Anonymous users2024-02-03

    Hello, now in the drawing input, can not directly draw the corbel column, must be in the single member input parameter diagram processing: single member input--- member management--- other --- add components--- fill in the component name, quantity, --- determination--- parameter input--- select the atlas--- corbel column--- bilateral --- selection--- input reinforcement --- calculation exit. View the original post

  12. Anonymous users2024-02-02

    If the retaining wall is a concrete wall, the layout is defined by a shear wall, and the buttress can be defined by a column (end column).

  13. Anonymous users2024-02-01

    Glodon rebar software draws a variable cross-section retaining wall, instead of setting and drawing it in the wall, after selecting the "steeplechase board" in the "other" of the component, clicking the mouse in the "definition" column, and then selecting "new special-shaped" in "new". Then a grid drawing interface will open, then set the mesh density, and you can draw the variable section retaining wall according to your required size. After confirming, the rest will complete your rebar, elevation and other attribute settings according to the attribute settings.

  14. Anonymous users2024-01-31

    There is no direct way to do it now. You can take an average thickness to calculate the number of rebars, and the length of the rebars is not much different. The number of transverse reinforcements of the wall will not be less.

  15. Anonymous users2024-01-30

    I can't really draw this, so let's convert it and take the mean.

Related questions
5 answers2024-07-23

GFY2010 is mainly designed to solve the problem of "steel bar construction sampling", and also has many functions such as "optimizing material breakage, reducing steel bar loss", "improving steel bar processing efficiency", "guiding on-site binding", "controlling steel bar delivery, procurement, and storage". The product runs through the various construction processes of the entire steel bar sub-project, provides computerized and information-based solutions for the relevant personnel of each process, improves the construction progress of the entire steel bar sub-project, reduces the loss of steel, strictly controls the waste of steel in all links, ensures the quality of the project and improves the profitability of the project department and labor subcontracting. >>>More

7 answers2024-07-23

Interior wall decoration settings: point the room, build a new room, establish it according to the bathroom, kitchen, living room, bedroom, etc., change the name in the attribute box, and establish attached components according to the requirements of the drawings according to the type of components. After the establishment of each room attachment component, you can return to the drawing interface and draw according to the room name. >>>More

9 answers2024-07-23

Glodon's software is still relatively easy to learn, it is recommended that you can apply for Glodon's study classes, training, their training courses are free, pricing software and rebar, graphics software should be available every month Installation and hardcover software depends on the branch arrangement in your area You can directly sign up on the Glodon Shinkansen, or you can give the local company's service **, let them help you register, what you want to learn. Pricing software is generally mastered in one day, and then when you actually do the project, you can directly give their service if you have any questions

14 answers2024-07-23

Rusting steel bars is a headache. Worldwide, one tenth of the world's steel bar production is damaged by rust on construction sites each year. In China, nearly 100 million tons of steel bars rust every year. Therefore, how to protect the steel bar from corrosion is of great significance. >>>More

7 answers2024-07-23

No. 20-22, then the length calculation is less than 12 rebar using 25 cm. 12-16 construction 30 cm, 18-25 use 35 cm of tied wire, one ton of steel construction 5 kg of tied wire. >>>More