The quantity of the garden engineering and the original design quantity submitted for review have ch

Updated on technology 2024-07-21
12 answers
  1. Anonymous users2024-02-13

    Dizzy. You need to learn, I'm a resource clerk gardener. These questions are not clear in one or two words.

    1.You need to know how to make the data. First of all, you have to learn what those gardens are for. You'll be able to organize the data. So you have to learn more, this is not clear. It's best to go to the construction site and take a look!

    2.format you can ask for supervision. If he doesn't. You can go to Zhulong.com to find your local garden format.

    3。Regarding the change, if it is the same as the practice on the drawings, there is no need to change, no need to do a visa, if there is a change, the amount is required, provided that the amount of work is increased, and if it is reduced, don't mention it, hehe! As for what you said about the same amount of the original design, you understand it wrongly, and you don't need to do anything on the list, just do the inspection information.

    4。The amount of change has not been verified, then it is troublesome, remember to do every visa, in the receiver must be Party A's representative, audit, supervision. The construction unit can only be present in all directions. That way, they're all willing to sign, and you won't be in such trouble.

    5, what do you agree to change with the approval of the Development Bureau, then do you know the change in those positions, if you know, make an application, explain the changes clearly, and then ask their leaders to sign on the line, and then get the signed contact sheet and then find Party A's audit unit to receive the visa. Do you understand. Give me extra points.

  2. Anonymous users2024-02-12

    I am from Yunnan, and we are here to write a work contact sheet, write down the reasons and basis for the change, let the supervisor and Party A give instructions, and then do the engineering measurement visa.

    Work contact form.

    Contract No.: No.:

    Project Name Contact Contact**.

    Contact Subject: Work Contact Content.

    Write down the reason, location, and basis for the change.

    Construction unit: Issued: year, month and date.

    Opinions of the supervision unit.

    Signature: YYYYYYYYYYYYYYYYYYYYYYYYYY

    Opinions of the general management and general implementation service units.

    Signature: YYYYYYYYYYYYYYYYYYYYYYYYYY

    Opinions of the construction unit.

    Signature: YYYYYYYYYYYYYYYYYYYYYYYYYY

    After that, sign the engineering metrology visa form.

    Engineering Metrology Visa Slip.

    Project Name Contract Number.

    Visa Reason (Reason):

    Visa content: Remarks.

    Opinions of the construction unit, opinions of the supervision unit, opinions of the construction unit.

    Construction unit (signature) Supervision unit (signature) Construction unit (signature) Project manager: Chief Professional supervision engineer: Representative of the construction unit:

    YYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYY

  3. Anonymous users2024-02-11

    You need to consult your local ** department, the procedures in each place are different, even if it is a region, the way to deal with a thing is not the same, mainly depends on the communication skills of your company leaders.

  4. Anonymous users2024-02-10

    The definition is different:

    1. Design change: refers to the modification, improvement and optimization of the approved preliminary design documents, technical design documents or construction drawing design documents from the date of approval of the preliminary design to the date of formal delivery through the completion acceptance. Design changes should be issued in the form of drawings or design change orders.

    2. Changing the construction time and sequence of the relevant project is a design change. The report of the change in the price of the works shall be submitted by the contractor. If the contractor changes the construction organization design during the construction process, it shall be agreed by the owner and the supervisor.

    Newly added quantities: quantities that are not included in the design, and quantities that are added later, are the quantities of each sub-item or sub-item and component expressed in physical units of measurement or natural units of measurement.

    The cost of the project is different:

    Design changes: 1. Include the technical data of the original design that is modified and supplemented due to the omission and error of the design work itself. The cost of design change should generally be controlled within 5% of the total cost of construction and installation projects, and the new investment generated by design change shall not exceed 1 3 of the basic preparation fee.

    2. Correct design errors and design modifications to meet changes in site conditions. Generally, there are two types: the design change notice issued by the original design unit and the design change contact form agreed by the original design unit obtained by the construction unit.

    Newly increased engineering quantity:

    The natural unit of measurement is the natural properties of the object as the unit of measurement. For example, light boxes, mirror boxes, and counters are measured in "units", and clothes racks, curtain rods, and towel racks are measured in "roots" or "sets".

    A physical unit of measurement is a physical property of an object as a unit of measurement. For example, the wall plastering is measured in "m2", and the curtain closure, curtain rails, stair handrails, and railings are measured in "m".

  5. Anonymous users2024-02-09

    1. New project: refers to the original design does not contain this project, and then the project is added, for example: a construction project originally did not have "structural columns, no ring beams", and the owner mainly added this project;

    2. Design change: or the above project, there were originally ring beams and structural columns, but the original cross-section was small, as well as the problem of shape, and now the cross-section should be increased by "400 * 240, all changed to 400 * 400", "structural column 240 * 240 changed to 400 * 240".

    From the above, it can be seen that there was no project before, and now there is a project called increasing the amount of work; And what already exists, just a little change, is called a design change project.

  6. Anonymous users2024-02-08

    The new quantity is not a design change and should not be floated. Design change refers to the change of the drawings within the scope of the contract, and the content added outside the contract drawings shall be supplemented by the contract or agreement.

  7. Anonymous users2024-02-07

    New quantity items due to design changes: For new projects that have been added due to design changes, for example, the original design did not have a fence, and now the design institute requires the addition of a fence, the comprehensive unit price of the fence shall be proposed by the contractor and confirmed by the employer and the supervisor as the basis for settlement. The example you gave is an increment rather than an addition, so you still have to apply the comprehensive unit price in the original commercial standard.

  8. Anonymous users2024-02-06

    Design changes Others will change accordingly.

    It's going to be repriced.

  9. Anonymous users2024-02-05

    For comprehensive landscape engineering, the material application for review can refer to the application for examination of the construction project. Because the materials used are similar to those used in construction, such as: steel, cement, sand, water and electricity materials, etc.

  10. Anonymous users2024-02-04

    Engineering technical documents, construction surveying fixed-point pay-off, construction schedule, engineering materials entry, project start-up, subcontractor qualification, sub-project construction, unit project completion pre-inspection, monthly material machine dynamics, project resumption of work, monthly project progress payment, project change costs, cost claims, project payment, project delay, supervision engineer reply sheet.

  11. Anonymous users2024-02-03

    Now that construction has begun and there have been engineering changes, it should definitely be the final settlement**.

  12. Anonymous users2024-02-02

    How can there be a settlement table, the project is still completed, how to settle. It should be reported according to the bid.

Related questions
8 answers2024-07-21

The estimated quantity is the quantity calculated according to the construction drawings, while the physical quantity is the quantity of the finished product built on the construction site. >>>More

7 answers2024-07-21

2.The construction organization plan is submitted for review. 3. >>>More

6 answers2024-07-21

One minute to understand the calculation of the amount of steel bars teasing the work core He Cheng Shan's Kai.

8 answers2024-07-21

First of all, based on my years of experience, the content of 44kg m2 of steel bar in the small high-rise of 11 floors is reasonable. 80-90kg m2 is unreasonable, please check your information**. >>>More

11 answers2024-07-21

Hello. The calculation method of foundation pit earthwork is as follows: >>>More