What is the general process of custom cabinetry?

Updated on home 2024-07-07
7 answers
  1. Anonymous users2024-02-12

    1. Sign the purchase order and pay the deposit in advance;

    2. Door-to-door measurement, the designer will issue a cabinet design drawing and kitchen water and electricity renovation drawings, and confirm the final design drawings of the cabinet;

    3. Sign the first paragraph of the contract, sign a detailed supply contract, and make an advance payment;

    4. Make an appointment for delivery and installation;

    5. Acceptance, the cabinet is installed, the customer conducts a comprehensive inspection of the whole set of cabinets, and pays the balance after acceptance.

  2. Anonymous users2024-02-11

    1. Select the brand, style and material, and discuss. Pay a certain measurement deposit and make an appointment for the initial test.

    2. The cabinet plan is confirmed, and the water circuit construction begins. After the construction team enters the site, about the first door-to-door preliminary test of cabinet design, cabinet designers measure the size, what requirements to explain clearly in person, including the specifications and sizes of range hoods, stoves, refrigerators, disinfection cabinets and other electrical appliances, the more detailed the explanation, the closer the cabinet is to your actual needs.

    3. The designer generally completes the overall scheme of the cabinet within 3 days, and there is no problem after the designer modifies it, and the water and electricity transformation drawing is produced.

    4. After confirming that the floor tiles and wall tiles have been laid, the ceiling, water heater and gas meter are installed in place, and the relevant electrical materials are prepared in place, make an appointment with the cabinet designer for retesting. After the bricklayer is completed, the designer comes to retest, and there is no problem with the retest drawings, so you can choose the color, set the hardware, sign the contract, and officially put it into production.

    5. Two days before the installation date set in the contract, the merchant should generally remind and ask the owner whether it is installed normally, and if it is installed normally, the merchant will deliver and install. If there are changes, the installation date will be negotiated.

    6. Pay the balance after the installation is completed and accepted. During the installation of cabinets, range hoods, gas stoves, small kitchen treasures and other electrical appliances should be installed synchronously, in one step.

  3. Anonymous users2024-02-10

    On the one hand, cabinet customization can meet the needs of kitchen health and environmental protection, and can also save the excess function and space of the cabinet, becoming the first choice for fashion cabinets. So generally speaking, what are the steps of cabinet customization?

    Step 1: Sign the order.

    When fully understanding the market, we have a clear understanding of the quality, service, strength and style of the products of various cabinet manufacturers. After determining the manufacturer, you should sign an order and pay a deposit of 100 yuan to 300 yuan in advance.

    Step 2: Make an appointment.

    After signing the order, the customer can ask the measurement designer to come to the measurement. Since designing a kitchen is a professional job, finding an experienced designer can make all the difference.

    Step 3: Design your kitchen.

    It is necessary to have the customer, the survey designer, and the construction personnel of the home improvement company to plan the layout of the kitchen and determine the location of the waterway, circuit and electrical appliances. The rough measurement designer should give the waterway and circuit diagram, and meet the construction standards.

    Step 4: Design the cabinets.

    When the waterways, electrical circuits and wall and floor tiles are all in place, the accurate measurement of the size can ensure that the whole kitchen of the stool and celery fits perfectly. It is necessary to pay attention to whether there is enough space in the cooking area, washing area, storage area, and cooking area; Whether the height of the wall cabinet and the height of the table meet the ergonomics and the actual needs of the cook; Whether the space outside the cabinet can guarantee the normal operation requirements.

    Step 5: Delivery and installation.

    The delivery and installation of cabinets are generally free of charge, and the manufacturer makes an appointment with the customer in advance according to the time agreed in the contract before delivery.

    Step 6: Acceptance check.

    The whole set of cabinets is comprehensively inspected, and the electrical appliances are accepted according to the manufacturer's commitment and relevant national standards.

    Step 7: After-sales service.

    Kitchen as a set of water, electricity, gas in one of the comprehensive space, after-sales service is very important, in the signing of the contract is best to the manufacturer's commitment to the warranty time, customer problem response time in the contract clearly stipulated, once the manufacturer can not solve the problem in time, can be used to restrain the manufacturer's behavior.

    After reading the above content, I believe you have a certain understanding of the specific process of cabinet customization, whether it is buying a house or decorating, if you pay more attention, I believe you can learn a lot of useful knowledge about decoration.

  4. Anonymous users2024-02-09

    As the main body of the whole kitchen, the cabinet design affects the style and practicality of the kitchen. So what is the process of cabinet customization?

    1. Size measurement.

    You can make an appointment online with a designer to come to measure, including length, width, and height. And estimate the general area of the cabinet, which is conducive to making a cabinet budget. If you know how to measure better, you can report the size to the designer and make a plan directly.

    2、**。Go to the nearby building materials mall to learn about the general situation of various cabinets. At present, there are three main pricing methods in the market: the linear meter method, the ** pricing method, and the itemized pricing method. If the budget is high enough, you can choose better materials, more well-known brands, and better craftsmanship.

    3. Countertop purchase.

    The quality of countertop materials, processing accuracy, strength, hardness, non-toxicity, non-radioactivity and other properties are the key indicators to measure the quality of countertops.

    4. Door panel selection.

    The material of the door panel can be divided into double veneer, paint, fireproof board, blister, solid wood, etc. You have to decide on the decoration style of the kitchen according to your home renovation situation, and then choose the board according to the style and budget.

    5. Cabinet design details.

    When designing cabinets, we often pay more attention to the shape, layout, shape and other general directions of the cabinets. Once put into use, many people will find that some cabinets are not comfortable to use because of negligence in details, and cleaning and maintenance are also very troublesome! So you can't ignore the details!

    There will be a certain gap between the depth of the upper and lower cabinets of the cabinets, which is determined by factors such as the height of the user and the depth of the base cabinet; Whether the sink is single or double is more in line with cooking habits; What is the most convenient way to design the distance between the cooking area and the washing area? These are all questions to consider.

    6. Accessories. Hinges, drawers, baskets, handles and other hardware quality determines the service life of the cabinet, if you choose some *** brands or imported hardware, may involve additional costs

    7. Installation acceptance.

    The delivery and installation of cabinets are generally free of charge, and the staff will make an appointment with the customer for delivery and installation in advance according to the time agreed in the contract before delivery.

    After the installation, you can conduct a comprehensive inspection of the door panels, countertops, accessories, etc. of the whole set of cabinets for acceptance.

  5. Anonymous users2024-02-08

    1.Choose cabinets: It is recommended to buy cabinets as soon as possible, and it is best to start when doing hydropower engineering design, so as to avoid the layout of sinks and electrical appliances in the cabinets and affect the arrangement of water and electricity lines. When purchasing in the early stage, you can consider the brand, style, material and other perspectives, and shop around.

    2.Measuring the room and design: After roughly selecting the cabinet and determining the cabinet service provider, you can agree to ask the designer of the brand to come to measure the room at a time;

    3.Communicate the plan and plan: After measuring the room, you can invite the home decoration designer and the cabinet designer to communicate the specific design plan together. In this link, it is also necessary to determine the location and size of the sink and electrical appliances in the cabinet to avoid the situation of inconsistency in the size of direct purchase;

    4.Measure the room again: After the construction of waterways, circuits and gas, after the tile paving and ceiling installation is completed, you can find a cabinet designer to re-test the door to accurately determine the size of the cabinet, select the color and hardware;

    5.Sign the contract and place an order for customization: Before the formal order is customized, the brand owner will confirm the details of the cabinet with the owner again, and the owner will need to pay the balance after the confirmation (some brands will pay the balance after installation and acceptance).

    Generally speaking, the customization cycle is about 45 days, and if it is a solid wood cabinet, it will take longer, about 90 days, so it should be a little earlier;

    7.Cabinet acceptance and installation: When the cabinet is accepted, it is generally only necessary to confirm whether the quantity and style are correct, and if there is a difference, it can be handled according to the contract;

    8.Synchronous installation of electrical appliances: During the installation of cabinets, it is recommended to install sinks, range hoods, gas stoves, small household appliances, etc. synchronously, in one step.

    I hope what is written above can help you as a reference suggestion.

  6. Anonymous users2024-02-07

    The process and precautions for customizing kitchen cabinets are as follows:

    1. Select. Choose kitchen cabinet brand, material, style, type, etc. according to actual needs;

    2. Quantity. Make an appointment for the initial measurement time of the kitchen cabinet in the bridge shed, and the merchant will issue a kitchen water and electricity drawing, and make an appointment to resize the size and issue a design drawing after the kitchen water and electricity and wall and floor tiles are in place.

    3. Fixed. Sign a customized contract, pay a deposit in advance, pay attention to keep the contract properly, and carefully confirm each clause to ensure your own rights and interests.

    4. Inspection. After the production and installation are completed, the owner will conduct a comprehensive inspection of the whole set of kitchen cabinets, and the problems found by Yihe Tongdan need to be raised and solved in time, and the balance will be paid off after passing the acceptance.

  7. Anonymous users2024-02-06

    Most cabinets are now custom-made, and consumers can customize the cabinets according to their preferred style. In the preparation stage, consumers need to determine the style of custom cabinets, and then finalize the developer after comparison.

    What are the processes for customizing cabinets.

    1. What are the processes for customizing cabinets - signing a cabinet purchase order.

    After selecting a cabinet manufacturer, you can sign an order and pay a certain deposit in advance. Note that the deposit slip should be properly kept, and returned to the cabinet contract branch after signing the contract.

    Second, what are the processes of custom cabinets - sub-field measurement.

    Once the order is signed, you can ask the cabinet designer to come to the door to measure. The initial measurement should be before the hydropower transformation, the plumber and foreman are present, and the water and electricity layout of the kitchen should be comprehensively considered, whether the water and electricity pipelines need to be modified, etc. And inform the designer of the kitchen appliances he needs and the location he intends to place.

    After this measurement, the designer designed the prototype of the overall cabinet and the water and electricity renovation drawings of the kitchen according to the kitchen space. Hydropower construction workers work according to the drawings.

    3. What is the process of customizing cabinets - the second on-site measurement.

    The time of the second measurement is generally after the completion of the hydropower renovation and the construction of wall and floor tiles. In this measurement, the data must be accurate, and the location and size of the kitchen appliance must also be determined. Based on the measurement results, the designer needs to produce the final and accurate design drawings of the customized cabinets.

    Fourth, what are the processes of customizing cabinets - check the cabinet design drawings.

    After the second measurement, you can generally see the design of the drawing, when you receive the drawing, in addition to looking at the renderings, you need to carefully read the CAD drawing, and the size marked on it should be checked clearly.

    Fifth, what are the processes of custom cabinets - sign a contract to pay.

    After the design plan is determined, you need to make an appointment with the designer to sign a detailed supply contract with the store in advance and pay in advance. The contract has various provisions on the total price of the product, payment, delivery and installation, acceptance, after-sales and so on, and the contract will also be accompanied by two documents: "Nuclear Price List" and "Design Drawings". The stakes are high and every clause needs to be carefully checked when signing.

    6. What are the processes of custom cabinets - delivery and installation.

    The delivery and installation of cabinets are generally yes, and the staff of the manufacturer will make an appointment with the customer for delivery and installation in advance according to the time agreed in the contract before delivery.

    7. What are the processes of custom cabinets - acceptance inspection.

    After the cabinet staff is installed, the owner conducts a comprehensive inspection of the whole set of cabinets, and pays the balance after passing the acceptance.

    The above is an introduction to the process of customizing cabinets.

Related questions
3 answers2024-07-07

1.Familiarity with the industry (familiarity with the industry in which your software is involved in order to craft an interface style that suits the characteristics of the industry). >>>More

7 answers2024-07-07

When each school organizes the pre-interview for the MBA, the arrangement is similar, and the application process for the early interview is generally as follows: >>>More

7 answers2024-07-07

First of all, you tell the customizer about your needs, and the customizer will communicate with you to understand your purpose and hobbies, and then design the route in combination with the gameplay of the destination. Generally, the customization company will do everything from the visa to the before, during and after the trip, I have experienced the customization of Nemo Travel, anyway, I went to the airport with a small bag, and they waited at the airport to check in. After I came back, I made a commemorative book, and the electronic version also took my **.

11 answers2024-07-07

1. Publication in the newspaper. During the liquidation period of the company, it can be published in the newspaper, which needs to be published in a newspaper approved by the local industrial and commercial bureau, and domestic enterprises only need to publish the newspaper once, and foreign-funded enterprises need to publish the newspaper three times. It is best to choose ** for publicity, and the cancellation announcement needs to be publicized for at least 45 days. >>>More

5 answers2024-07-07

This is based on the actual situation on the site, and Mosheng Home Furnishing provides free measurement**.