The decoration of the house is generally done first for water and electricity, because it is necessary to slot, thread and change the pipeline, and then the masons enter the site to transform the interior and paste tiles. Then the carpenters come in to hit the ceiling cabinets, etc. Finally the most painted.
-
The order and process of the decoration of the rough house:
2. Main body transformation: Generally speaking, the main frame of the house needs to be rectified before decoration, such as removing some unnecessary walls, and designing the overall frame of the house in advance, which will help the next decoration, but after the construction, you must remember to clean up the house.
3. Hydropower construction: In the process of construction, it is necessary to keep a certain distance between the lines, and the wiring should be horizontal and vertical, in addition, it is necessary to determine the approximate placement of various electrical appliances and switches and sockets and the selection of products.
4. Basic project: This mainly includes the mud stage and the painting stage. For example, mud is the first process, which includes tile and floor drain construction, then carpentry, and finally painting construction projects.
5. Installation engineering: There are many indispensable items in the installation project, such as cabinets, floors, switches and sockets, lamps, etc., which need to be installed in this link.
Industrial style
In the future, the traditional industrial style will be softer and more relaxed, by enhancing the texture of the single product, it will not only retain the industrial style, but also reduce the sense of simplicity, and develop in the direction of refinement, and the high-end luxury industrial style aesthetics will also appear, and the space will contain more items with a metallic and fashionable appearance.
The industrial style will be simple to promote the increase, to create a simple and supremacy of the space pattern, the workshop elements are reduced, the seemingly rough, uncarved space is not lacking in highlights, and the simplicity can also reveal the exquisite.
-
1.Space planning and design. First of all, we need to design a detailed renovation plan according to the customer's needs and ideas, as well as the layout of the house itself. This step can be carried out by a professional decoration designer.
Look at the design first and then make a decision, there is always something you are satisfied with!
2.Budget and material selection. After deciding on the design plan, you need to make a detailed renovation budget and choose the right decoration materials. In the selection process, it is recommended to choose better quality materials to ensure the quality and service life of the decoration.
Budget] 3Hydropower retrofit. Hydropower renovation is one of the most important projects, which requires hydropower wiring according to the design scheme, including sewerage, water supply, gas pipelines, sockets, switches, etc., and the process should be used in safety regulations.
4.wall and floor treatment. This step includes the treatment and leveling of the walls and floors to ensure the effectiveness of the subsequent decoration construction.
5.Ceiling. The ceiling is an important part of improving the aesthetics of the overall spatial pattern. The ceiling can be made of light steel keel, latex paint or gypsum board to improve the overall space effect.
6.Custom furniture and carpentry construction. According to the needs of customers and design schemes, different furniture and wood flooring are selected, and owners need to choose the style and material that suits them according to their own needs, and at the same time carry out carpentry construction, including the installation and assembly of custom furniture such as wardrobes, cabinets, and desks.
7.Paint and wallpaper treatment. Painting and wallpaper are key steps in making a room feel more inhabitable. When dealing with paints and wallpapers, it is necessary to pay attention to the quality of materials, the combination and coordination of colors, and the color matching can better cater to the psychological needs of the owner.
8.Lighting and electrical installation. The installation of lighting and electrical appliances is an important part of the decoration, including isoelectric sockets, switches, lamps, TVs and air conditioners, etc., which need to be carefully selected by the owner and combined according to the design plan.
9.Demolition and cleanup. When all the works are completed, the site needs to be dismantled and cleaned to ensure that the renovated environment is clean and tidy, eliminating any hidden dangers and safety risks.
In summary, the process of renovating a rough house requires detailed planning and design, which in turn includes space planning and design, budget and material selection, water and electricity retrofits, wall and floor treatment, suspended ceilings, custom furniture and carpentry construction, paint and wallpaper treatment, lighting and appliance installation, and demolition and cleanup. When choosing a decoration company, it is recommended to choose a professional company with strong limbs to ensure the quality of materials and the safety of project quality.
-
The decoration process and steps of the rough house are mainly divided into eight stages. design of measuring chambers; (2) main demolition; (3) hydropower transformation; (4) tiling; suspended ceilings and walls; kitchen and bathroom ceiling, cabinet door, door installation; flooring, switch panels, lamps, toilet installation; 8. Buy household appliances. First of all, the design of the measuring chamber.
Before decoration, the area of the house should be measured in detail, and the division and size of each functional area should be clarified. 2. The main body demolition includes wall demolition, plastic steel window demolition, partition and so on. and dismantle according to individual needs.
Three. Hydropower transformation 1, circuit transformation wire quality: hydropower transformation is the most important decoration.
In terms of circuit transformation, it involves strong and weak current, because the current decoration requirement is that the line should be laid with dark wire. So it's very troublesome to have a problem with the line. So the quality of the wire must be very good.
This part of the money must not save wire specifications Burning Lu judgment: There are also sayings about the choice of wires. In the renovation of the home skin, according to national regulations, square lines are used for lighting, switches and sockets, square lines are used for air conditioners, and square lines are used for water heaters.
Grouping method: Grouping means that the lighting of each room should be grouped separately, and the air conditioning of each space should be grouped separately. 2. Waterway transformationWaterway transformation plays an important role in decoration compared with circuit transformation.
If you don't do a good job in the improvement of the waterway and leakage, then you will only lose money and pay. Selection of cold water pipes and hot water pipes: It is best to choose hot water pipes during the decoration process, if nothing else, compared to cold water pipes, the quality of hot water pipes is better.
Pressure test: After the waterway is reconstructed, a pressure test must be carried out to ensure that there is no water leakage at the water pipe joint. Waterproof:
Bathrooms, kitchens, and balconies must be waterproof. Note: Before doing heatstroke prevention and cooling, be sure to clean the walls and floors, otherwise no matter how good the brand is, it will not be waterproof.
Fourth, after the completion of the bricking hydropower transformation, it is time to put bricks. Under normal circumstances, the kitchen, balcony, walls, floors, living room, dining room floors are laid. Whether the ground should be patched, whether it is sidelined, whether the sewing is beautiful, etc.
Careful consideration must be given at this point. 5. After the ceiling and wall tiles are pasted, the painter and carpenter will take the stage. The painter has to do a good job of plastering the wall, such as scraping putty, then the carpenter starts to hang the ceiling, hit the furniture, and finally the painter paints the wall and the top surface.
If the dining room is wallpapered, then after the carpenter finishes the ceiling and furniture, the painter can paint it. Six. Kitchen ceilings, cabinet doors, door installation.
After the above steps are completed, you can choose to install kitchen ceilings and kitchen ceiling lights, while installing bathroom heaters, and then install cabinet doors and doors, kitchen sinks, gas stoves, and countertops can not be in place. 7. After the floor, the opening and closing panels, lamps, and bathroom doors are installed, you can call the floor master to start laying the floor in the house. At the same time, the number of switches, sockets, and lamps at home is clarified, so that it is convenient for masters who change water and electricity to install lamps and panels.
Finally buy a bathroom to install. 8. Buy household appliances, complete the previous decoration process, and finally buy appliances, green plants, install curtains, and then you can carry a bag and move in.
-
The sequence and process of rough house decoration mainly include the following steps:
With the decoration device, you only need to enter the area + city, and calculate the most affordable local market in 3 seconds**: [Tuba Rabbit Big Platform Counts**].
No longer worry about the company's price increase, omission and price increase.
1.Wall treatment: First of all, the wall treatment should be carried out, including scraping putty, repairing cracks, etc.
The purpose of this step is to level the wall surface and facilitate the subsequent application of the paint. Depending on the wall material and area, the range is about 50-100 yuan per square meter.
2.Floor laying: The next step is the laying of the floor, you can choose tiles, flooring and other materials. The range of this step is larger, depending on the material and area, about 100-500 yuan per square meter.
3.Hydropower renovation: Before the renovation, the hydropower needs to be transformed, including the arrangement and installation of water pipes and wires. The ** of this step is relatively fixed, according to the same house type and area of not pants per mu, about 200-300 yuan per square meter.
4.Furniture purchase: After the renovation is completed, Hu Jisen needs to buy furniture for decoration. The furniture varies according to the brand, material and style, and the range ranges from a few thousand yuan to tens of thousands of yuan according to different needs and budgets.
It is recommended that when decorating the rough house, you can make a detailed decoration plan according to your needs and budget, and choose a reliable decoration company to cooperate. When choosing materials and furniture, you can compare the quality and quality of different brands and businesses to ensure the effect and quality of decoration. In addition, during the decoration process, it is necessary to pay attention to the construction quality and safety, and communicate and negotiate with the decoration company in time to ensure the smooth progress of the decoration project.
Kunming - [Kunming Decoration Strategy Guide].
Suzhou - [Suzhou Decoration Strategy Guide].
Hefei - [Hefei Decoration Strategy Guide].
Fuzhou - [Fuzhou Decoration Strategy Guide].
Beijing - [Beijing Decoration Strategy Guide].
Dalian - [Dalian Decoration Strategy Book].
Hangzhou - [Hangzhou Decoration Strategy Guide].
Shanghai - [Shanghai Decoration Strategy Guide].
Tianjin——[Tianjin Decoration Strategy Guide].
-
The order of the decoration of the rough house is to install water and electricity first, and then to decorate the civil works. The process is: design scheme, construction preparation, hydropower transformation, masonry stage, painting stage, and completion acceptance.
1. Design scheme.
The first step in the renovation of a rough house is to design a plan. At this stage, the owner needs to communicate with the renovation company or designer to clarify their needs and preferences, as well as budget constraints, etc. The design scheme includes the design of floor plan, circuit planning, wall decoration, floor materials, furniture style, etc.
2. Construction preparation.
After the design scheme is determined, construction preparation needs to be carried out. This stage includes material procurement, construction personnel recruitment, construction tool preparation, etc. At the same time, it is necessary to consider the safety issues during the renovation, such as protective measures on the construction site, circuit safety, etc.
3. Hydropower transformation of eggplant bushes.
Hydropower renovation is an important part of the decoration of the rough house. At this stage, the house's plumbing needs to be inspected and remodeled to meet the new renovation needs. Hydropower renovation includes the transformation of water pipes, wires, sockets, switches, etc.
4. Masonry stage.
The masonry stage refers to the treatment of walls, ceilings, etc. At this stage, it is necessary to carry out wall plastering, brick paving, ceiling suspension and other work. At the same time, you need to consider the decoration of the wall, such as latex paint, wallpaper, etc.
5. Carpentry stage.
The carpentry stage refers to the production and installation of wood products such as furniture, doors and windows. At this stage, it is necessary to design and make furniture, and at the same time install and adjust doors and windows.
6. Painting stage.
The painting stage refers to the treatment of coatings, paints, etc. At this stage, it is necessary to paint and paint the walls, ceilings, etc. At the same time, you need to consider the color, quality and other issues of the paint.
7. Completion acceptance.
Completion acceptance refers to the acceptance after the completion of the renovation project. At this stage, it is necessary to conduct a comprehensive inspection and acceptance of the decoration Humu project to ensure that the decoration quality meets the requirements. At the same time, work such as cleaning and disinfection is required to ensure the hygiene and safety of the house.
If a problem is found, it needs to be rectified in a timely manner.
-
<>1. Preliminary work: Before the decoration of the rough house, we need to determine the relevant design plan and budget with the decoration company, and after confirming that it is correct, we can sign the decoration contract. 2. Main body transformation:
After the current work is ready, you can officially enter the construction link, first of all, the main demolition and renovation project, which can be understood literally, to rectify the main frame of the house, such as demolishing the wall. 3. Hydropower construction: hydropower construction is the highlight of home decoration, once the tile paving is completed, after the ceiling is installed, the search is found that there is no good construction, and the later rework is very troublesome, time-consuming and labor-intensive.
4. Foundation project: When the hydropower transformation is completed, the construction of the foundation project needs to be carried out, mainly including the mud stage and the painting stage. 5. Installation engineering:
When the paint is applied well and dries naturally, the installation of building materials can be carried out.
First, the preliminary work.
Before the decoration of the rough house, we need to determine the relevant design plan and budget with the decoration company, and after confirming that it is correct, we can sign the decoration contract. In addition, it is best for the owner to measure the construction area of the house and the size of the construction volume of each project, so as to facilitate timely communication with the designer during the construction process and rectify the project.
Second, the main body transformation.
After the current work is ready, you can officially enter the construction link, first of all, the main demolition and renovation project, which can be understood literally, to rectify the main frame of the house, such as demolishing the wall. The design of the house frame first will help the decoration, but after the construction, the garbage needs to be cleaned up.
3. Hydropower construction.
Hydropower construction project is the highlight of home decoration, once the tile paving is completed, after the ceiling is installed, it is found that there is no good construction, and it is very troublesome to rework in the later stage, which is time-consuming and labor-intensive. Therefore, during the construction process, it is necessary to keep a certain distance from the line, and the wiring should be horizontal and vertical. In addition, it is also necessary to determine the approximate location of various electrical appliances and switches and sockets, so that reasonable construction can be carried out, and at the same time, hydropower materials should be selected with excellent quality products and long service life.
Fourth, the basic project.
When the hydropower renovation is completed, the construction of the foundation project needs to be carried out, mainly including the mud stage and the painting stage. In line with which project is dirty and which is constructed first, mud is the first process, including tile and floor drain construction, and then the carpentry is entered after the side shooting, and finally the paint construction project. When painting is carried out, it is necessary to protect the finished product of the ground to reduce the dripping of paint on the ground that has been constructed.
5. Installation engineering.
When the paint is applied well and dries naturally, the installation of building materials can be carried out. There are a lot of projects included here, from cabinets and floors to switches and sockets, lamps, etc., which are installed in this link, and you need to pay attention to the sequence and steps in the installation process to avoid poor installation results.
The steps and methods of water and electricity decoration of the blank room are as follows: >>>More
The steps and methods of water and electricity decoration of the blank room are as follows: >>>More
1. Prepare the tools required for the decoration of the blank room. >>>More
The renovation process consists of three stages. At first, it is the design stage, which requires the main decoration designer to communicate to understand the style that the owner likes, and integrate the popular trends into it, and determine the design plan before starting to screen the decoration company. >>>More
Rough houseThe noise difference between the front and rear of the renovation is about 30 decibels. Owners can use indoor settings to reduce noise, for example, they can place some green plants with more branches and foliage on the window sills and balconies facing the street. Or choose more fabric decoration and soft decoration, because fabric jewelry has a very good sound absorption effect. >>>More